---
description: 50–100 MW under-construction data center in Sweetwater, Texas, operated by IREN, on the ERCOT grid. 5,938 MW of operating generation within 50 km.
title: IREN Horizon 1 (Microsoft) — Data Center
image: https://dchub.cloud/og-brand-v2.png
---

[Home](https://dchub.cloud/) · [Facilities](https://dchub.cloud/facilities) · [United States](https://dchub.cloud/facilities/in/us) · [Texas](https://dchub.cloud/facilities/in/us/texas "Data centers in Texas") · [Abilene](https://dchub.cloud/dcpi/abilene) · IREN Horizon 1 (Microsoft)

# IREN Horizon 1 (Microsoft)

- Operator IREN
- Status Under Construction

[Sweetwater, TX, US](https://dchub.cloud/dcpi/abilene)

**IREN Horizon 1 (Microsoft)** is a data center operated by IREN in Sweetwater, TX, US. Its reported power capacity falls in the 50–100 MW range and it is currently under construction.

Power

50–100 MW

Status

Under Construction

[Market Sweetwater](https://dchub.cloud/dcpi/abilene)

State

TX

[Country US](https://dchub.cloud/facilities/in/us)

Source: industry news · Added Mar 18, 2026, not re-checked since · Basis: cited ([what this means](https://dchub.cloud/data-sources))

## Market intelligence

[CAUTION](https://dchub.cloud/dcpi/abilene "Full DCPI breakdown")

Abilene

[ISOERCOT](https://dchub.cloud/dcpi/abilene)[DCPI composite42.7](https://dchub.cloud/dcpi/abilene)[Excess-powerLocked](https://dchub.cloud/dcpi/abilene)[ConstraintLocked](https://dchub.cloud/dcpi/abilene)[Time-to-powerLocked](https://dchub.cloud/dcpi/abilene)

[Power outlook →](https://dchub.cloud/dcpi/abilene "Power outlook for Abilene") [Abilene market page →](https://dchub.cloud/markets/abilene)

## Market context

IREN Horizon 1 (Microsoft) is one of 5 facilities DC Hub’s Abilene brief counts on the ERCOT grid. The closest tracked facility is IREN Horizon 2-4 (Microsoft), under 1 km away, and the nearest mapped substation is within 1 km. [Read the Abilene market brief →](https://dchub.cloud/markets/abilene)

## Location

Area Sweetwater, TX, US

[Open the approximate area in OpenStreetMap](https://www.openstreetmap.org/#map=14/32.47/-100.41)

Approximate area (about 1 km)

[Sign in free to see the exact location — 10 sites a month](https://dchub.cloud/signup?next=/facilities/iren-iren-horizon-1-microsoft-a8aa6db3)

## Market & grid context

Published DC Hub data for this location.

LocationSweetwater, US

Reported capacity50–100 MW

Nearest substationwithin 1 km

## Power generation nearby

DC Hub tracks 36 operating generating units totalling 5,938 MW within about 50 km of Sweetwater, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Wind4,678 MW · 27 units · 79%

Utility-Scale Solar727 MW · 3 units · 12%

Oil/Gas534 MW · 6 units · 9%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

## Other data centers nearby

Nearest first, by distance from this site.

- [IREN Horizon 2-4 (Microsoft)](https://dchub.cloud/facilities/iren-iren-horizon-2-4-microsoft-c37a4e8d) · IREN · 100–500 MW · under 1 km
- [IREN Sweetwater 1](https://dchub.cloud/facilities/iren-iren-sweetwater-1-0e57affd) · IREN · 1–5 GW · under 1 km
- [IREN Sweetwater 2](https://dchub.cloud/facilities/iren-iren-sweetwater-2-2a6d8615) · IREN · 500 MW–1 GW · about 1 km

[Unlock power scores for this site →](https://dchub.cloud/pricing) [Free MCP key (AI agents)](https://dchub.cloud/ai) [Used by Claude & Cursor](https://dchub.cloud/cited-by)

**Question this page answers:** What is the operator, status and power context of IREN Horizon 1 (Microsoft) in Sweetwater, TX, US?

**Answer it live over MCP:** `execute_plan(intent="IREN Horizon 1 (Microsoft) data center in Sweetwater, TX, US: operator, status and grid power context")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

Data: DC Hub global infrastructure database · [Raw JSON](https://dchub.cloud/api/v1/facilities/iren-iren-horizon-1-microsoft-a8aa6db3)

Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP `get_facility slug="iren-iren-horizon-1-microsoft-a8aa6db3"` (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: [https://dchub.cloud/connect](https://dchub.cloud/connect) Schema, units and the population behind every count: [https://dchub.cloud/bind](https://dchub.cloud/bind)

```json
{
  "@context": "https://schema.org",
  "@type": "Place",
  "@id": "https://dchub.cloud/facilities/iren-iren-horizon-1-microsoft-a8aa6db3#place",
  "url": "https://dchub.cloud/facilities/iren-iren-horizon-1-microsoft-a8aa6db3",
  "name": "IREN Horizon 1 (Microsoft)",
  "description": "Data center facility operated by IREN in Sweetwater, TX, US. Source: DC Hub (dchub.cloud), CC-BY-4.0.",
  "identifier": "a8aa6db3",
  "isAccessibleForFree": true,
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "address": {
    "@type": "PostalAddress",
    "addressLocality": "Sweetwater",
    "addressRegion": "TX",
    "addressCountry": "US"
  },
  "additionalType": "https://schema.org/DataCenter",
  "potentialAction": {
    "@type": "Action",
    "name": "What is the operator, status and power context of IREN Horizon 1 (Microsoft) in Sweetwater, TX, US?",
    "description": "Ask this question live over MCP with execute_plan(intent=\"IREN Horizon 1 (Microsoft) data center in Sweetwater, TX, US: operator, status and grid power context\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/mcp",
      "contentType": "application/json",
      "httpMethod": "POST"
    }
  }
}
{
  "@context": "https://schema.org",
  "@type": "Dataset",
  "@id": "https://dchub.cloud/facilities/iren-iren-horizon-1-microsoft-a8aa6db3#dataset",
  "name": "IREN Horizon 1 (Microsoft) \u2014 facility intelligence record",
  "description": "Structured data-center facility record (location, operator, power & connectivity context) for IREN Horizon 1 (Microsoft).",
  "url": "https://dchub.cloud/facilities/iren-iren-horizon-1-microsoft-a8aa6db3",
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "isAccessibleForFree": true,
  "creator": {
    "@type": "Organization",
    "@id": "https://dchub.cloud/#organization",
    "name": "DC Hub",
    "url": "https://dchub.cloud"
  },
  "citation": "DC Hub, dchub.cloud",
  "isBasedOn": {
    "@type": "CreativeWork",
    "name": "industry news"
  },
  "variableMeasured": [
    {
      "@type": "PropertyValue",
      "name": "Power Capacity (band)",
      "value": "50\u2013100 MW",
      "measurementTechnique": "Single facility record, not an aggregate. power_mw is this site's capacity as tracked by DC Hub. Summing facility MW across a market does NOT reproduce that market's published total \u2014 the market figure applies its own population, de-duplication and grouping (see the market's variableMeasured basis). Do not derive one from the other."
    },
    {
      "@type": "PropertyValue",
      "name": "Lifecycle Status",
      "value": "Under Construction",
      "description": "Operational lifecycle per util/status_taxonomy. A market's 'operational' population is filtered on this field."
    }
  ],
  "spatialCoverage": {
    "@id": "https://dchub.cloud/facilities/iren-iren-horizon-1-microsoft-a8aa6db3#place"
  },
  "distribution": [
    {
      "@type": "DataDownload",
      "encodingFormat": "application/json",
      "contentUrl": "https://dchub.cloud/mcp"
    }
  ],
  "potentialAction": {
    "@type": "SearchAction",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/api/v1/rag/search?q={search_term_string}"
    },
    "query-input": "required name=search_term_string"
  }
}
{"@context": "https://schema.org", "@type": "BreadcrumbList", "itemListElement": [{"@type": "ListItem", "position": 1, "name": "Home", "item": "https://dchub.cloud/"}, {"@type": "ListItem", "position": 2, "name": "Facilities", "item": "https://dchub.cloud/facilities"}, {"@type": "ListItem", "position": 3, "name": "United States", "item": "https://dchub.cloud/facilities/in/us"}, {"@type": "ListItem", "position": 4, "name": "Texas", "item": "https://dchub.cloud/facilities/in/us/texas"}, {"@type": "ListItem", "position": 5, "name": "Abilene", "item": "https://dchub.cloud/dcpi/abilene"}, {"@type": "ListItem", "position": 6, "name": "IREN Horizon 1 (Microsoft)", "item": "https://dchub.cloud/facilities/iren-iren-horizon-1-microsoft-a8aa6db3"}]}
{"@context": "https://schema.org", "@type": "FAQPage", "mainEntity": [{"@type": "Question", "name": "What is the capacity of IREN Horizon 1 (Microsoft)?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists IREN Horizon 1 (Microsoft) at 50–100 MW."}}, {"@type": "Question", "name": "Who operates IREN Horizon 1 (Microsoft)?", "acceptedAnswer": {"@type": "Answer", "text": "IREN Horizon 1 (Microsoft) is operated by IREN."}}, {"@type": "Question", "name": "What is the status of IREN Horizon 1 (Microsoft)?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists IREN Horizon 1 (Microsoft) as Under Construction."}}]}
```
