---
description: 1–5 GW planned data center in Louisa, Virginia, operated by EdgeCore Digital Infrastructure, on the PJM grid. Specs, nearby power and peer sites on DC Hub.
title: EdgeCore Louisa County Campus — Data Center
image: https://dchub.cloud/og-brand-v2.png
---

[Home](https://dchub.cloud/) · [Facilities](https://dchub.cloud/facilities) · [United States](https://dchub.cloud/facilities/in/us) · [Virginia](https://dchub.cloud/facilities/in/us/virginia "Data centers in Virginia") · [Culpeper](https://dchub.cloud/dcpi/culpeper) · EdgeCore Louisa County Campus

# EdgeCore Louisa County Campus

- Operator EdgeCore Digital Infrastructure
- Status Planned

[Louisa, VA, US](https://dchub.cloud/dcpi/culpeper)

**EdgeCore Louisa County Campus** is a data center operated by EdgeCore Digital Infrastructure in Louisa, VA, US. Its reported power capacity falls in the 1–5 GW range and it is currently planned.

Power

1–5 GW

Status

Planned

[Market Louisa](https://dchub.cloud/dcpi/culpeper)

State

VA

[Country US](https://dchub.cloud/facilities/in/us)

Source: DC Hub facilities registry · Added Mar 18, 2026, not re-checked since · Basis: cited ([what this means](https://dchub.cloud/data-sources))

## Market intelligence

[AVOID](https://dchub.cloud/dcpi/culpeper "Full DCPI breakdown")

Culpeper

[ISOPJM](https://dchub.cloud/dcpi/culpeper)[DCPI composite22.9](https://dchub.cloud/dcpi/culpeper)[Excess-powerLocked](https://dchub.cloud/dcpi/culpeper)[ConstraintLocked](https://dchub.cloud/dcpi/culpeper)[Time-to-powerLocked](https://dchub.cloud/dcpi/culpeper)

[Power outlook →](https://dchub.cloud/dcpi/culpeper "Power outlook for Culpeper") [Culpeper market page →](https://dchub.cloud/markets/culpeper)

## Market context

EdgeCore Louisa County Campus is one of 6 facilities DC Hub’s Culpeper brief counts on the PJM grid. The closest tracked facility is AMAZON DATA SERVICES INC., IAD 550 LOUISA REB, about 17 km away, and the nearest mapped substation is within 5 km. [Read the Culpeper market brief →](https://dchub.cloud/markets/culpeper)

## Location

Area Louisa, VA, US

[Open the approximate area in OpenStreetMap](https://www.openstreetmap.org/#map=14/38.02/-78.00)

Approximate area (about 1 km)

[Sign in free to see the exact location — 10 sites a month](https://dchub.cloud/signup?next=/facilities/edgecore-digital-infrastructure-edgecore-louisa-county-campus-b3e01898)

## Market & grid context

Published DC Hub data for this location.

LocationLouisa, US

Reported capacity1–5 GW

Nearest substationwithin 5 km

## Power generation nearby

DC Hub tracks 36 operating generating units totalling 7,584 MW within about 50 km of Louisa, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas4,723 MW · 19 units · 62%

Nuclear2,001 MW · 2 units · 26%

Utility-Scale Solar860 MW · 15 units · 11%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

## Other data centers nearby

Nearest first, by distance from this site.

- [AMAZON DATA SERVICES INC., IAD 550 LOUISA REB](https://dchub.cloud/facilities/amazon-web-services-amazon-data-services-inc-iad-550-louisa-reb-b36c7273) · Amazon Web Services · about 17 km
- [PowerHouse 95 (Spotsylvania)](https://dchub.cloud/facilities/powerhouse-data-centers-powerhouse-95-spotsylvania-f533f3e2) · PowerHouse Data Centers · about 36 km
- [AVAIO Digital Ladysmith Campus](https://dchub.cloud/facilities/avaio-digital-avaio-digital-ladysmith-campus-dfaafee6) · AVAIO Digital · about 43 km
- [AVAIO Digital Carmel Church Data Hub](https://dchub.cloud/facilities/avaio-digital-avaio-digital-carmel-church-data-hub-31cbf4e2) · AVAIO Digital · 100–500 MW · about 46 km
- [Equinix CU1/CU2/CU3/CU4 - Culpeper](https://dchub.cloud/facilities/equinix-equinix-cu1cu2cu3cu4-culpeper-a374a978) · Equinix · about 48 km
- [Equinix CU2](https://dchub.cloud/facilities/equinix-equinix-cu2-995e97f2) · Equinix · about 48 km

[Unlock power scores for this site →](https://dchub.cloud/pricing) [Free MCP key (AI agents)](https://dchub.cloud/ai) [Used by Claude & Cursor](https://dchub.cloud/cited-by)

**Question this page answers:** What is the operator, status and power context of EdgeCore Louisa County Campus in Louisa, VA, US?

**Answer it live over MCP:** `execute_plan(intent="EdgeCore Louisa County Campus data center in Louisa, VA, US: operator, status and grid power context")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

**Add DC Hub to your assistant:** [ChatGPT app](https://chatgpt.com/plugins/plugin_asdk_app_6add46d40f448191905e327e261ec86c) (install guide: [https://dchub.cloud/install/chatgpt](https://dchub.cloud/install/chatgpt)); [Claude connector: https://dchub.cloud/connect/claude](https://dchub.cloud/connect/claude).

**Get this live in your assistant:** DC Hub MCP at [https://dchub.cloud/mcp](https://dchub.cloud/mcp). Ask it with `execute_plan(intent="EdgeCore Louisa County Campus data center in Louisa, VA, US: operator, status and grid power context")`. Add to [ChatGPT](https://dchub.cloud/install/chatgpt?via=mcp) · [Claude](https://dchub.cloud/connect/claude?via=mcp) · [Cursor](https://dchub.cloud/connect?via=mcp).

Data: DC Hub global infrastructure database · [Raw JSON](https://dchub.cloud/api/v1/facilities/edgecore-digital-infrastructure-edgecore-louisa-county-campus-b3e01898)

Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP over Streamable HTTP at https://dchub.cloud/mcp; call `execute_plan` with this page's question for one dated, cited answer. You can also query `get_facility slug="edgecore-digital-infrastructure-edgecore-louisa-county-campus-b3e01898"`. Source: DC Hub (dchub.cloud), as of [the as_of date on the result]. Connect: [https://dchub.cloud/connect](https://dchub.cloud/connect) Schema, units and the population behind every count: [https://dchub.cloud/bind](https://dchub.cloud/bind)

```json
{
  "@context": "https://schema.org",
  "@type": "Place",
  "@id": "https://dchub.cloud/facilities/edgecore-digital-infrastructure-edgecore-louisa-county-campus-b3e01898#place",
  "url": "https://dchub.cloud/facilities/edgecore-digital-infrastructure-edgecore-louisa-county-campus-b3e01898",
  "name": "EdgeCore Louisa County Campus",
  "description": "Data center facility operated by EdgeCore Digital Infrastructure in Louisa, VA, US. Source: DC Hub (dchub.cloud), CC-BY-4.0.",
  "identifier": "b3e01898",
  "isAccessibleForFree": true,
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "address": {
    "@type": "PostalAddress",
    "addressLocality": "Louisa",
    "addressRegion": "VA",
    "addressCountry": "US"
  },
  "additionalType": "https://schema.org/DataCenter",
  "potentialAction": {
    "@type": "Action",
    "name": "What is the operator, status and power context of EdgeCore Louisa County Campus in Louisa, VA, US?",
    "description": "Ask this question live over MCP with execute_plan(intent=\"EdgeCore Louisa County Campus data center in Louisa, VA, US: operator, status and grid power context\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/mcp",
      "contentType": "application/json",
      "httpMethod": "POST"
    }
  }
}
{
  "@context": "https://schema.org",
  "@type": "Dataset",
  "@id": "https://dchub.cloud/facilities/edgecore-digital-infrastructure-edgecore-louisa-county-campus-b3e01898#dataset",
  "name": "EdgeCore Louisa County Campus \u2014 facility intelligence record",
  "description": "Structured data-center facility record (location, operator, power & connectivity context) for EdgeCore Louisa County Campus.",
  "url": "https://dchub.cloud/facilities/edgecore-digital-infrastructure-edgecore-louisa-county-campus-b3e01898",
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "isAccessibleForFree": true,
  "creator": {
    "@type": "Organization",
    "@id": "https://dchub.cloud/#organization",
    "name": "DC Hub",
    "url": "https://dchub.cloud"
  },
  "citation": "DC Hub, dchub.cloud",
  "isBasedOn": {
    "@type": "CreativeWork",
    "name": "DC Hub facilities registry"
  },
  "variableMeasured": [
    {
      "@type": "PropertyValue",
      "name": "Power Capacity (band)",
      "value": "1\u20135 GW",
      "measurementTechnique": "Single facility record, not an aggregate. power_mw is this site's capacity as tracked by DC Hub. Summing facility MW across a market does NOT reproduce that market's published total \u2014 the market figure applies its own population, de-duplication and grouping (see the market's variableMeasured basis). Do not derive one from the other."
    },
    {
      "@type": "PropertyValue",
      "name": "Lifecycle Status",
      "value": "Planned",
      "description": "Operational lifecycle per util/status_taxonomy. A market's 'operational' population is filtered on this field."
    }
  ],
  "spatialCoverage": {
    "@id": "https://dchub.cloud/facilities/edgecore-digital-infrastructure-edgecore-louisa-county-campus-b3e01898#place"
  },
  "distribution": [
    {
      "@type": "DataDownload",
      "encodingFormat": "application/json",
      "contentUrl": "https://dchub.cloud/mcp"
    }
  ],
  "potentialAction": {
    "@type": "SearchAction",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/api/v1/rag/search?q={search_term_string}"
    },
    "query-input": "required name=search_term_string"
  }
}
{"@context": "https://schema.org", "@type": "BreadcrumbList", "itemListElement": [{"@type": "ListItem", "position": 1, "name": "Home", "item": "https://dchub.cloud/"}, {"@type": "ListItem", "position": 2, "name": "Facilities", "item": "https://dchub.cloud/facilities"}, {"@type": "ListItem", "position": 3, "name": "United States", "item": "https://dchub.cloud/facilities/in/us"}, {"@type": "ListItem", "position": 4, "name": "Virginia", "item": "https://dchub.cloud/facilities/in/us/virginia"}, {"@type": "ListItem", "position": 5, "name": "Culpeper", "item": "https://dchub.cloud/dcpi/culpeper"}, {"@type": "ListItem", "position": 6, "name": "EdgeCore Louisa County Campus", "item": "https://dchub.cloud/facilities/edgecore-digital-infrastructure-edgecore-louisa-county-campus-b3e01898"}]}
{"@context": "https://schema.org", "@type": "FAQPage", "mainEntity": [{"@type": "Question", "name": "What is the capacity of EdgeCore Louisa County Campus?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists EdgeCore Louisa County Campus at 1–5 GW."}}, {"@type": "Question", "name": "Who operates EdgeCore Louisa County Campus?", "acceptedAnswer": {"@type": "Answer", "text": "EdgeCore Louisa County Campus is operated by EdgeCore Digital Infrastructure."}}, {"@type": "Question", "name": "What is the status of EdgeCore Louisa County Campus?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists EdgeCore Louisa County Campus as Planned."}}]}
```
