---
description: 500 MW–1 GW under-construction data center in Red Oak, Texas, operated by DataBank, on the ERCOT grid. 7,902 MW of operating generation within 50 km.
title: DataBank Red Oak Mega Campus — Data Center
image: https://dchub.cloud/og-brand-v2.png
---

[Home](https://dchub.cloud/) · [Facilities](https://dchub.cloud/facilities) · [United States](https://dchub.cloud/facilities/in/us) · [Texas](https://dchub.cloud/facilities/in/us/texas "Data centers in Texas") · [Red Oak](https://dchub.cloud/dcpi/red-oak) · DataBank Red Oak Mega Campus

# DataBank Red Oak Mega Campus

- Operator DataBank
- Status Under Construction

[Red Oak, TX, US](https://dchub.cloud/dcpi/red-oak)

**DataBank Red Oak Mega Campus** is a data center operated by DataBank in Red Oak, TX, US. Its reported power capacity falls in the 500 MW–1 GW range and it is currently under construction.

Power

500 MW–1 GW

Status

Under Construction

[Market Dallas](https://dchub.cloud/dcpi/red-oak)

City

Red Oak

State

TX

[Country US](https://dchub.cloud/facilities/in/us)

Source: DC Hub facilities registry · Added Mar 18, 2026, not re-checked since · Basis: cited ([what this means](https://dchub.cloud/data-sources))

## Market intelligence

[CAUTION](https://dchub.cloud/dcpi/red-oak "Full DCPI breakdown")

Red Oak

[ISOERCOT](https://dchub.cloud/dcpi/red-oak)[DCPI composite45.0](https://dchub.cloud/dcpi/red-oak)[Excess-powerLocked](https://dchub.cloud/dcpi/red-oak)[ConstraintLocked](https://dchub.cloud/dcpi/red-oak)[Time-to-powerLocked](https://dchub.cloud/dcpi/red-oak)

[Power outlook →](https://dchub.cloud/dcpi/red-oak "Power outlook for Red Oak") [Red Oak market page →](https://dchub.cloud/markets/red-oak)

## Market context

DataBank Red Oak Mega Campus is one of 7 facilities DC Hub’s Red Oak brief counts on the ERCOT grid. The closest tracked facility is Compass Datacenters Red Oak TX, about 5 km away, and the nearest mapped substation is within 5 km. [Read the Red Oak market brief →](https://dchub.cloud/markets/red-oak)

## Location

Area Red Oak, TX, US

[Open the approximate area in OpenStreetMap](https://www.openstreetmap.org/#map=14/32.52/-96.75)

Approximate area (about 1 km)

[Sign in free to see the exact location — 10 sites a month](https://dchub.cloud/signup?next=/facilities/databank-databank-red-oak-mega-campus-ac4d3aca)

## Market & grid context

Published DC Hub data for this location.

LocationRed Oak, US

Reported capacity500 MW–1 GW

Nearest substationwithin 5 km

## Fiber connectivity

Networks recorded as present at or immediately around DataBank Red Oak Mega Campus in public peering records. Treat this as a map of who is *there*, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

DataBank

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

## Power generation nearby

DC Hub tracks 26 operating generating units totalling 7,902 MW within about 50 km of Red Oak, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas7,142 MW · 17 units · 90%

Utility-Scale Solar760 MW · 9 units · 10%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

## Other data centers nearby

Nearest first, by distance from this site.

- [Compass Datacenters Red Oak TX](https://dchub.cloud/facilities/compass-compass-datacenters-red-oak-tx-df53f603) · Compass · about 5 km
- [Compass Red Oak Campus (Dallas)](https://dchub.cloud/facilities/compass-datacenters-compass-red-oak-campus-dallas-a7d9ab20) · Compass Datacenters · 100–500 MW · about 5 km
- [ALAMO MISSION](https://dchub.cloud/facilities/alamo-mission-6778fe75) · about 5 km
- [Compass Data Center](https://dchub.cloud/facilities/unknown-compass-data-center-1f7f8313) · Unknown · about 5 km
- [Compass Data Center](https://dchub.cloud/facilities/compass-compass-data-center-8baf7e6e) · Compass · about 5 km
- [Compass Data Center](https://dchub.cloud/facilities/compass-data-center-compass-data-center-e9a510ce) · about 6 km

[Unlock power scores for this site →](https://dchub.cloud/pricing) [Free MCP key (AI agents)](https://dchub.cloud/ai) [Used by Claude & Cursor](https://dchub.cloud/cited-by)

**Question this page answers:** What is the operator, status and power context of DataBank Red Oak Mega Campus in Red Oak, TX, US?

**Answer it live over MCP:** `execute_plan(intent="DataBank Red Oak Mega Campus data center in Red Oak, TX, US: operator, status and grid power context")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

Data: DC Hub global infrastructure database · [Raw JSON](https://dchub.cloud/api/v1/facilities/databank-databank-red-oak-mega-campus-ac4d3aca)

Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP `get_facility slug="databank-databank-red-oak-mega-campus-ac4d3aca"` (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: [https://dchub.cloud/connect](https://dchub.cloud/connect) Schema, units and the population behind every count: [https://dchub.cloud/bind](https://dchub.cloud/bind)

```json
{
  "@context": "https://schema.org",
  "@type": "Place",
  "@id": "https://dchub.cloud/facilities/databank-databank-red-oak-mega-campus-ac4d3aca#place",
  "url": "https://dchub.cloud/facilities/databank-databank-red-oak-mega-campus-ac4d3aca",
  "name": "DataBank Red Oak Mega Campus",
  "description": "Data center facility operated by DataBank in Red Oak, TX, US. Source: DC Hub (dchub.cloud), CC-BY-4.0.",
  "identifier": "ac4d3aca",
  "isAccessibleForFree": true,
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "address": {
    "@type": "PostalAddress",
    "addressLocality": "Red Oak",
    "addressRegion": "TX",
    "addressCountry": "US"
  },
  "additionalType": "https://schema.org/DataCenter",
  "potentialAction": {
    "@type": "Action",
    "name": "What is the operator, status and power context of DataBank Red Oak Mega Campus in Red Oak, TX, US?",
    "description": "Ask this question live over MCP with execute_plan(intent=\"DataBank Red Oak Mega Campus data center in Red Oak, TX, US: operator, status and grid power context\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/mcp",
      "contentType": "application/json",
      "httpMethod": "POST"
    }
  }
}
{
  "@context": "https://schema.org",
  "@type": "Dataset",
  "@id": "https://dchub.cloud/facilities/databank-databank-red-oak-mega-campus-ac4d3aca#dataset",
  "name": "DataBank Red Oak Mega Campus \u2014 facility intelligence record",
  "description": "Structured data-center facility record (location, operator, power & connectivity context) for DataBank Red Oak Mega Campus.",
  "url": "https://dchub.cloud/facilities/databank-databank-red-oak-mega-campus-ac4d3aca",
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "isAccessibleForFree": true,
  "creator": {
    "@type": "Organization",
    "@id": "https://dchub.cloud/#organization",
    "name": "DC Hub",
    "url": "https://dchub.cloud"
  },
  "citation": "DC Hub, dchub.cloud",
  "isBasedOn": {
    "@type": "CreativeWork",
    "name": "DC Hub facilities registry"
  },
  "variableMeasured": [
    {
      "@type": "PropertyValue",
      "name": "Power Capacity (band)",
      "value": "500 MW\u20131 GW",
      "measurementTechnique": "Single facility record, not an aggregate. power_mw is this site's capacity as tracked by DC Hub. Summing facility MW across a market does NOT reproduce that market's published total \u2014 the market figure applies its own population, de-duplication and grouping (see the market's variableMeasured basis). Do not derive one from the other."
    },
    {
      "@type": "PropertyValue",
      "name": "Lifecycle Status",
      "value": "Under Construction",
      "description": "Operational lifecycle per util/status_taxonomy. A market's 'operational' population is filtered on this field."
    }
  ],
  "spatialCoverage": {
    "@id": "https://dchub.cloud/facilities/databank-databank-red-oak-mega-campus-ac4d3aca#place"
  },
  "distribution": [
    {
      "@type": "DataDownload",
      "encodingFormat": "application/json",
      "contentUrl": "https://dchub.cloud/mcp"
    }
  ],
  "potentialAction": {
    "@type": "SearchAction",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/api/v1/rag/search?q={search_term_string}"
    },
    "query-input": "required name=search_term_string"
  }
}
{"@context": "https://schema.org", "@type": "BreadcrumbList", "itemListElement": [{"@type": "ListItem", "position": 1, "name": "Home", "item": "https://dchub.cloud/"}, {"@type": "ListItem", "position": 2, "name": "Facilities", "item": "https://dchub.cloud/facilities"}, {"@type": "ListItem", "position": 3, "name": "United States", "item": "https://dchub.cloud/facilities/in/us"}, {"@type": "ListItem", "position": 4, "name": "Texas", "item": "https://dchub.cloud/facilities/in/us/texas"}, {"@type": "ListItem", "position": 5, "name": "Red Oak", "item": "https://dchub.cloud/dcpi/red-oak"}, {"@type": "ListItem", "position": 6, "name": "DataBank Red Oak Mega Campus", "item": "https://dchub.cloud/facilities/databank-databank-red-oak-mega-campus-ac4d3aca"}]}
{"@context": "https://schema.org", "@type": "FAQPage", "mainEntity": [{"@type": "Question", "name": "What is the capacity of DataBank Red Oak Mega Campus?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists DataBank Red Oak Mega Campus at 500 MW–1 GW."}}, {"@type": "Question", "name": "Who operates DataBank Red Oak Mega Campus?", "acceptedAnswer": {"@type": "Answer", "text": "DataBank Red Oak Mega Campus is operated by DataBank."}}, {"@type": "Question", "name": "What is the status of DataBank Red Oak Mega Campus?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists DataBank Red Oak Mega Campus as Under Construction."}}]}
```
