---
description: 100–500 MW under-construction data center in Meridian, Mississippi, operated by Compass, on the MISO grid. 1,348 MW of operating generation within 50 km.
title: Compass Meridian Campus $10B — Data Center
image: https://dchub.cloud/og-brand-v2.png
---

[Home](https://dchub.cloud/) · [Facilities](https://dchub.cloud/facilities) · [United States](https://dchub.cloud/facilities/in/us) · [Mississippi](https://dchub.cloud/facilities/in/us/mississippi "Data centers in Mississippi") · [Brandon](https://dchub.cloud/dcpi/brandon) · Meridian Campus $10B

# Compass Meridian Campus $10B

- Operator Compass
- Status Under Construction

[Meridian, MS, US](https://dchub.cloud/dcpi/brandon)

**Meridian Campus $10B** is a data center operated by Compass in Meridian, MS, US. Its reported power capacity falls in the 100–500 MW range and it is currently under construction.

Power

100–500 MW

Status

Under Construction

City

Meridian

State

MS

[Country US](https://dchub.cloud/facilities/in/us)

Source: DC Hub facilities registry · Added Mar 28, 2026, not re-checked since · Basis: cited ([what this means](https://dchub.cloud/data-sources))

## Market intelligence

[AVOID](https://dchub.cloud/dcpi/brandon "Full DCPI breakdown")

Brandon

[ISOMISO](https://dchub.cloud/dcpi/brandon)[DCPI composite35.7](https://dchub.cloud/dcpi/brandon)[Excess-powerLocked](https://dchub.cloud/dcpi/brandon)[ConstraintLocked](https://dchub.cloud/dcpi/brandon)[Time-to-powerLocked](https://dchub.cloud/dcpi/brandon)

[Power outlook →](https://dchub.cloud/dcpi/brandon "Power outlook for Brandon") [Brandon market page →](https://dchub.cloud/markets/brandon)

## Market context

Compass Meridian Campus $10B is one of 1 facilities DC Hub’s Brandon brief counts on the MISO grid. The nearest mapped substation is within 1 km. [Read the Brandon market brief →](https://dchub.cloud/markets/brandon)

## Location

Area Meridian, MS, US

[Open the approximate area in OpenStreetMap](https://www.openstreetmap.org/#map=14/32.36/-88.70)

Approximate area (about 1 km)

[Sign in free to see the exact location — 10 sites a month](https://dchub.cloud/signup?next=/facilities/compass-meridian-campus-10b-60b04802)

## Market & grid context

Published DC Hub data for this location.

LocationMeridian, US

Reported capacity100–500 MW

Nearest substationwithin 1 km

## Power generation nearby

DC Hub tracks 8 operating generating units totalling 1,348 MW within about 50 km of Meridian, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas1,212 MW · 5 units · 90%

Utility-Scale Solar136 MW · 3 units · 10%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

## Other data centers nearby

Tracked by DC Hub in Meridian.

- [Compass Datacenters Meridian MS Campus](https://dchub.cloud/facilities/compass-datacenters-compass-datacenters-meridian-ms-campus-ddbb2576) · Compass Datacenters · 500 MW–1 GW
- [AWS Mississippi Campus](https://dchub.cloud/facilities/amazon-web-services-aws-mississippi-campus-8daf8397) · Amazon Web Services · 1–5 GW
- [AVAIO Digital Taurus (Brandon Campus)](https://dchub.cloud/facilities/avaio-digital-avaio-digital-taurus-brandon-campus-a48d5c7a) · AVAIO Digital · 100–500 MW
- [xAI MACROHARDRR](https://dchub.cloud/facilities/xai-xai-macrohardrr-a5452608) · xAI
- [Amazon Canton Data Center](https://dchub.cloud/facilities/amazon-web-services-amazon-canton-data-center-c4c82d37) · Amazon Web Services
- [C Spire Mississippi](https://dchub.cloud/facilities/c-spire-c-spire-mississippi-bf000378) · C Spire

[Unlock power scores for this site →](https://dchub.cloud/pricing) [Free MCP key (AI agents)](https://dchub.cloud/ai) [Used by Claude & Cursor](https://dchub.cloud/cited-by)

**Question this page answers:** What is the operator, status and power context of Compass Meridian Campus $10B in Meridian, MS, US?

**Answer it live over MCP:** `execute_plan(intent="Compass Meridian Campus $10B data center in Meridian, MS, US: operator, status and grid power context")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

**Add DC Hub to your assistant:** [ChatGPT app](https://chatgpt.com/plugins/plugin_asdk_app_6add46d40f448191905e327e261ec86c) (install guide: [https://dchub.cloud/install/chatgpt](https://dchub.cloud/install/chatgpt)); [Claude connector: https://dchub.cloud/connect/claude](https://dchub.cloud/connect/claude).

**Get this live in your assistant:** DC Hub MCP at [https://dchub.cloud/mcp](https://dchub.cloud/mcp). Ask it with `execute_plan(intent="Compass Meridian Campus $10B data center in Meridian, MS, US: operator, status and grid power context")`. Add to [ChatGPT](https://dchub.cloud/install/chatgpt?via=mcp) · [Claude](https://dchub.cloud/connect/claude?via=mcp) · [Cursor](https://dchub.cloud/connect?via=mcp).

Data: DC Hub global infrastructure database · [Raw JSON](https://dchub.cloud/api/v1/facilities/compass-meridian-campus-10b-60b04802)

Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP over Streamable HTTP at https://dchub.cloud/mcp; call `execute_plan` with this page's question for one dated, cited answer. You can also query `get_facility slug="compass-meridian-campus-10b-60b04802"`. Source: DC Hub (dchub.cloud), as of [the as_of date on the result]. Connect: [https://dchub.cloud/connect](https://dchub.cloud/connect) Schema, units and the population behind every count: [https://dchub.cloud/bind](https://dchub.cloud/bind)

```json
{
  "@context": "https://schema.org",
  "@type": "Place",
  "@id": "https://dchub.cloud/facilities/compass-meridian-campus-10b-60b04802#place",
  "url": "https://dchub.cloud/facilities/compass-meridian-campus-10b-60b04802",
  "name": "Compass Meridian Campus $10B",
  "description": "Data center facility operated by Compass in Meridian, MS, US. Source: DC Hub (dchub.cloud), CC-BY-4.0.",
  "identifier": "60b04802",
  "isAccessibleForFree": true,
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "address": {
    "@type": "PostalAddress",
    "addressLocality": "Meridian",
    "addressRegion": "MS",
    "addressCountry": "US"
  },
  "additionalType": "https://schema.org/DataCenter",
  "potentialAction": {
    "@type": "Action",
    "name": "What is the operator, status and power context of Compass Meridian Campus $10B in Meridian, MS, US?",
    "description": "Ask this question live over MCP with execute_plan(intent=\"Compass Meridian Campus $10B data center in Meridian, MS, US: operator, status and grid power context\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/mcp",
      "contentType": "application/json",
      "httpMethod": "POST"
    }
  }
}
{
  "@context": "https://schema.org",
  "@type": "Dataset",
  "@id": "https://dchub.cloud/facilities/compass-meridian-campus-10b-60b04802#dataset",
  "name": "Compass Meridian Campus $10B \u2014 facility intelligence record",
  "description": "Structured data-center facility record (location, operator, power & connectivity context) for Compass Meridian Campus $10B.",
  "url": "https://dchub.cloud/facilities/compass-meridian-campus-10b-60b04802",
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "isAccessibleForFree": true,
  "creator": {
    "@type": "Organization",
    "@id": "https://dchub.cloud/#organization",
    "name": "DC Hub",
    "url": "https://dchub.cloud"
  },
  "citation": "DC Hub, dchub.cloud",
  "isBasedOn": {
    "@type": "CreativeWork",
    "name": "DC Hub facilities registry"
  },
  "variableMeasured": [
    {
      "@type": "PropertyValue",
      "name": "Power Capacity (band)",
      "value": "100\u2013500 MW",
      "measurementTechnique": "Single facility record, not an aggregate. power_mw is this site's capacity as tracked by DC Hub. Summing facility MW across a market does NOT reproduce that market's published total \u2014 the market figure applies its own population, de-duplication and grouping (see the market's variableMeasured basis). Do not derive one from the other."
    },
    {
      "@type": "PropertyValue",
      "name": "Lifecycle Status",
      "value": "Under Construction",
      "description": "Operational lifecycle per util/status_taxonomy. A market's 'operational' population is filtered on this field."
    }
  ],
  "spatialCoverage": {
    "@id": "https://dchub.cloud/facilities/compass-meridian-campus-10b-60b04802#place"
  },
  "distribution": [
    {
      "@type": "DataDownload",
      "encodingFormat": "application/json",
      "contentUrl": "https://dchub.cloud/mcp"
    }
  ],
  "potentialAction": {
    "@type": "SearchAction",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/api/v1/rag/search?q={search_term_string}"
    },
    "query-input": "required name=search_term_string"
  }
}
{"@context": "https://schema.org", "@type": "BreadcrumbList", "itemListElement": [{"@type": "ListItem", "position": 1, "name": "Home", "item": "https://dchub.cloud/"}, {"@type": "ListItem", "position": 2, "name": "Facilities", "item": "https://dchub.cloud/facilities"}, {"@type": "ListItem", "position": 3, "name": "United States", "item": "https://dchub.cloud/facilities/in/us"}, {"@type": "ListItem", "position": 4, "name": "Mississippi", "item": "https://dchub.cloud/facilities/in/us/mississippi"}, {"@type": "ListItem", "position": 5, "name": "Brandon", "item": "https://dchub.cloud/dcpi/brandon"}, {"@type": "ListItem", "position": 6, "name": "Meridian Campus $10B", "item": "https://dchub.cloud/facilities/compass-meridian-campus-10b-60b04802"}]}
{"@context": "https://schema.org", "@type": "FAQPage", "mainEntity": [{"@type": "Question", "name": "What is the capacity of Meridian Campus $10B?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists Meridian Campus $10B at 100–500 MW."}}, {"@type": "Question", "name": "Who operates Meridian Campus $10B?", "acceptedAnswer": {"@type": "Answer", "text": "Meridian Campus $10B is operated by Compass."}}, {"@type": "Question", "name": "What is the status of Meridian Campus $10B?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists Meridian Campus $10B as Under Construction."}}]}
```

Live, dated answers for this facility: connect an assistant to https://dchub.cloud/mcp and call execute_plan.
