---
description: 100–500 MW under-construction data center in Brandon, Mississippi, operated by AVAIO Digital, on the MISO grid. Specs, nearby power & peers.
title: AVAIO Digital Taurus (Brandon Campus) — Data Center
image: https://dchub.cloud/og-brand-v2.png
---

[Home](https://dchub.cloud/) · [Facilities](https://dchub.cloud/facilities) · [United States](https://dchub.cloud/facilities/in/us) · [Mississippi](https://dchub.cloud/facilities/in/us/mississippi "Data centers in Mississippi") · [Brandon](https://dchub.cloud/dcpi/brandon) · AVAIO Digital Taurus (Brandon Campus)

# AVAIO Digital Taurus (Brandon Campus)

- Operator AVAIO Digital
- Status Under Construction

[Brandon, MS, US](https://dchub.cloud/dcpi/brandon)

**AVAIO Digital Taurus (Brandon Campus)** is a data center operated by AVAIO Digital in Brandon, MS, US. Its reported power capacity falls in the 100–500 MW range and it is currently under construction.

Power

100–500 MW

Status

Under Construction

[Market Brandon](https://dchub.cloud/dcpi/brandon)

State

MS

[Country US](https://dchub.cloud/facilities/in/us)

Source: DC Hub facilities registry · Added Mar 18, 2026, not re-checked since · Basis: cited ([what this means](https://dchub.cloud/data-sources))

## Market intelligence

[AVOID](https://dchub.cloud/dcpi/brandon "Full DCPI breakdown")

Brandon

[ISOMISO](https://dchub.cloud/dcpi/brandon)[DCPI composite35.7](https://dchub.cloud/dcpi/brandon)[Excess-powerLocked](https://dchub.cloud/dcpi/brandon)[ConstraintLocked](https://dchub.cloud/dcpi/brandon)[Time-to-powerLocked](https://dchub.cloud/dcpi/brandon)

[Power outlook →](https://dchub.cloud/dcpi/brandon "Power outlook for Brandon") [Brandon market page →](https://dchub.cloud/markets/brandon)

## Market context

AVAIO Digital Taurus (Brandon Campus) is one of 1 facilities DC Hub’s Brandon brief counts on the MISO grid. The closest tracked facility is OSM DC 1430720172, about 37 km away, and the nearest mapped substation is within 5 km. [Read the Brandon market brief →](https://dchub.cloud/markets/brandon)

## Location

Area Brandon, MS, US

[Open the approximate area in OpenStreetMap](https://www.openstreetmap.org/#map=14/32.27/-89.99)

Approximate area (about 1 km)

[Sign in free to see the exact location — 10 sites a month](https://dchub.cloud/signup?next=/facilities/avaio-digital-avaio-digital-taurus-brandon-campus-a48d5c7a)

## Market & grid context

Published DC Hub data for this location.

LocationBrandon, US

Reported capacity100–500 MW

Nearest substationwithin 5 km

## Power generation nearby

DC Hub tracks 5 operating generating units totalling 829 MW within about 50 km of Brandon, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas551 MW · 1 unit · 66%

Utility-Scale Solar278 MW · 4 units · 34%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

## Other data centers nearby

Nearest first, by distance from this site.

- [OSM DC 1430720172](https://dchub.cloud/facilities/unknown-osm-dc-1430720172-29f549c9) · Unknown · about 37 km
- [OSM DC 1430720171](https://dchub.cloud/facilities/unknown-osm-dc-1430720171-80c52b37) · Unknown · about 37 km
- [Amazon Canton Data Center](https://dchub.cloud/facilities/amazon-web-services-amazon-canton-data-center-c4c82d37) · Amazon Web Services · about 38 km
- [OSM DC 1430720170](https://dchub.cloud/facilities/unknown-osm-dc-1430720170-a992a8ab) · Unknown · about 38 km
- [OSM DC 1430720173](https://dchub.cloud/facilities/unknown-osm-dc-1430720173-dc5ef775) · Unknown · about 38 km
- [AWS Mississippi Campus](https://dchub.cloud/facilities/amazon-web-services-aws-mississippi-campus-8daf8397) · Amazon Web Services · 1–5 GW · about 38 km

[Unlock power scores for this site →](https://dchub.cloud/pricing) [Free MCP key (AI agents)](https://dchub.cloud/ai) [Used by Claude & Cursor](https://dchub.cloud/cited-by)

**Question this page answers:** What is the operator, status and power context of AVAIO Digital Taurus (Brandon Campus) in Brandon, MS, US?

**Answer it live over MCP:** `execute_plan(intent="AVAIO Digital Taurus (Brandon Campus) data center in Brandon, MS, US: operator, status and grid power context")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

Data: DC Hub global infrastructure database · [Raw JSON](https://dchub.cloud/api/v1/facilities/avaio-digital-avaio-digital-taurus-brandon-campus-a48d5c7a)

Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP `get_facility slug="avaio-digital-avaio-digital-taurus-brandon-campus-a48d5c7a"` (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: [https://dchub.cloud/connect](https://dchub.cloud/connect) Schema, units and the population behind every count: [https://dchub.cloud/bind](https://dchub.cloud/bind)

```json
{
  "@context": "https://schema.org",
  "@type": "Place",
  "@id": "https://dchub.cloud/facilities/avaio-digital-avaio-digital-taurus-brandon-campus-a48d5c7a#place",
  "url": "https://dchub.cloud/facilities/avaio-digital-avaio-digital-taurus-brandon-campus-a48d5c7a",
  "name": "AVAIO Digital Taurus (Brandon Campus)",
  "description": "Data center facility operated by AVAIO Digital in Brandon, MS, US. Source: DC Hub (dchub.cloud), CC-BY-4.0.",
  "identifier": "a48d5c7a",
  "isAccessibleForFree": true,
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "address": {
    "@type": "PostalAddress",
    "addressLocality": "Brandon",
    "addressRegion": "MS",
    "addressCountry": "US"
  },
  "additionalType": "https://schema.org/DataCenter",
  "potentialAction": {
    "@type": "Action",
    "name": "What is the operator, status and power context of AVAIO Digital Taurus (Brandon Campus) in Brandon, MS, US?",
    "description": "Ask this question live over MCP with execute_plan(intent=\"AVAIO Digital Taurus (Brandon Campus) data center in Brandon, MS, US: operator, status and grid power context\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/mcp",
      "contentType": "application/json",
      "httpMethod": "POST"
    }
  }
}
{
  "@context": "https://schema.org",
  "@type": "Dataset",
  "@id": "https://dchub.cloud/facilities/avaio-digital-avaio-digital-taurus-brandon-campus-a48d5c7a#dataset",
  "name": "AVAIO Digital Taurus (Brandon Campus) \u2014 facility intelligence record",
  "description": "Structured data-center facility record (location, operator, power & connectivity context) for AVAIO Digital Taurus (Brandon Campus).",
  "url": "https://dchub.cloud/facilities/avaio-digital-avaio-digital-taurus-brandon-campus-a48d5c7a",
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "isAccessibleForFree": true,
  "creator": {
    "@type": "Organization",
    "@id": "https://dchub.cloud/#organization",
    "name": "DC Hub",
    "url": "https://dchub.cloud"
  },
  "citation": "DC Hub, dchub.cloud",
  "isBasedOn": {
    "@type": "CreativeWork",
    "name": "DC Hub facilities registry"
  },
  "variableMeasured": [
    {
      "@type": "PropertyValue",
      "name": "Power Capacity (band)",
      "value": "100\u2013500 MW",
      "measurementTechnique": "Single facility record, not an aggregate. power_mw is this site's capacity as tracked by DC Hub. Summing facility MW across a market does NOT reproduce that market's published total \u2014 the market figure applies its own population, de-duplication and grouping (see the market's variableMeasured basis). Do not derive one from the other."
    },
    {
      "@type": "PropertyValue",
      "name": "Lifecycle Status",
      "value": "Under Construction",
      "description": "Operational lifecycle per util/status_taxonomy. A market's 'operational' population is filtered on this field."
    }
  ],
  "spatialCoverage": {
    "@id": "https://dchub.cloud/facilities/avaio-digital-avaio-digital-taurus-brandon-campus-a48d5c7a#place"
  },
  "distribution": [
    {
      "@type": "DataDownload",
      "encodingFormat": "application/json",
      "contentUrl": "https://dchub.cloud/mcp"
    }
  ],
  "potentialAction": {
    "@type": "SearchAction",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/api/v1/rag/search?q={search_term_string}"
    },
    "query-input": "required name=search_term_string"
  }
}
{"@context": "https://schema.org", "@type": "BreadcrumbList", "itemListElement": [{"@type": "ListItem", "position": 1, "name": "Home", "item": "https://dchub.cloud/"}, {"@type": "ListItem", "position": 2, "name": "Facilities", "item": "https://dchub.cloud/facilities"}, {"@type": "ListItem", "position": 3, "name": "United States", "item": "https://dchub.cloud/facilities/in/us"}, {"@type": "ListItem", "position": 4, "name": "Mississippi", "item": "https://dchub.cloud/facilities/in/us/mississippi"}, {"@type": "ListItem", "position": 5, "name": "Brandon", "item": "https://dchub.cloud/dcpi/brandon"}, {"@type": "ListItem", "position": 6, "name": "AVAIO Digital Taurus (Brandon Campus)", "item": "https://dchub.cloud/facilities/avaio-digital-avaio-digital-taurus-brandon-campus-a48d5c7a"}]}
{"@context": "https://schema.org", "@type": "FAQPage", "mainEntity": [{"@type": "Question", "name": "What is the capacity of AVAIO Digital Taurus (Brandon Campus)?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists AVAIO Digital Taurus (Brandon Campus) at 100–500 MW."}}, {"@type": "Question", "name": "Who operates AVAIO Digital Taurus (Brandon Campus)?", "acceptedAnswer": {"@type": "Answer", "text": "AVAIO Digital Taurus (Brandon Campus) is operated by AVAIO Digital."}}, {"@type": "Question", "name": "What is the status of AVAIO Digital Taurus (Brandon Campus)?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists AVAIO Digital Taurus (Brandon Campus) as Under Construction."}}]}
```
