{"hero":{"code":"ND","dominant_iso":"MISO","markets_tracked":4,"name":"North Dakota","operational_mw":710.0,"pipeline_mw":70.0,"verdict":"AVOID"},"is_pro":false,"iso_breakdown":[],"kpis":{"dominant_iso":{"all_isos":[{"iso":"MISO","mw":300.0}],"iso":"MISO","mw_share":300.0},"markets_tracked":4,"median_lease_rate":null,"median_lease_rate_error":"UndefinedTable: relation \"powered_shell_pricing\" does not exist","total_facilities":26,"total_operational_mw":710.0,"total_pipeline_mw":70.0},"live_as_of":{"age_hours":1.5,"iso":"2026-10-20T01:05:06.936685+00:00"},"ma":[],"ok":true,"operators":[],"outlook":{"generated_at":"2026-10-20T02:36:22.278618Z","narrative_md":"**Williston, ND:** Williston's data center footprint remains minimal, with only 40 MW across two tracked facilities, yet the market registers a strong BUILD verdict on the Data Center Power Index. The excess-power score of 69/100 indicates substantial grid capacity headroom relative to current load, while the constraint score of 16/100 signals minimal regulatory, infrastructure, or land-use friction. This combination positions Williston as a rare greenfield opportunity in the Upper Midwest\u2014one where power availability is not the limiting factor.\n\n**Bismarck:** Bismarck remains an underdeveloped market with minimal infrastructure presence. Only one facility is currently tracked in the market, representing a combined capacity of 0 MW. Dakota Carrier Network operates the sole monitored asset. This absence of scale reflects the market's nascent stage and limited institutional presence relative to major AI-infrastructure hubs.\n\n**Fargo:** Fargo's data center footprint remains underdeveloped, with only 4 tracked facilities totaling 0 MW of operational capacity across the region. The market is fragmented among three operators\u2014Dakota Carrier Network operating 2 facilities, with 702 Communications and Midcontinent Communications each running single-site deployments. The absence of hyperscale or tier-1 regional presence underscores Fargo's position as a secondary market without meaningful power infrastructure buildout to date.","rationale":"Aggregated from per-market deep-dive narratives.","verdict":"AVOID","word_count":195},"paywall":{"blurb":"ISO Breakdown, Transmission Build-Out, State Policy / Tax Incentives, Top Operators, and M&A activity are unlocked with the DC Hub plan with every tool, all states.","checkout_url":"/pricing?utm_source=state_brief","required_tier":"PRO"},"policy":null,"redirect_to":null,"requested":"north-dakota","state":"north-dakota","state_code":"ND","state_name":"North Dakota","tier":"FREE","top_markets":[{"brief_url":"/markets/williston-nd/brief","computed_at":"2026-10-20T01:03:27.281666+00:00","constraint_score":15.4,"excess_power":71.5,"iso":"MISO","name":"Williston, ND","slug":"williston-nd","state":"ND","verdict":"BUILD"},{"brief_url":"/markets/bismarck/brief","computed_at":"2026-10-20T01:03:51.476095+00:00","constraint_score":28.6,"excess_power":44.3,"iso":"MISO","name":"Bismarck","slug":"bismarck","state":"ND","verdict":"AVOID"},{"brief_url":"/markets/fargo/brief","computed_at":"2026-10-20T01:03:22.912630+00:00","constraint_score":30.5,"excess_power":42.3,"iso":"MISO","name":"Fargo","slug":"fargo","state":"ND","verdict":"AVOID"},{"brief_url":"/markets/ellendale/brief","computed_at":"2026-10-20T01:05:06.936685+00:00","constraint_score":32.0,"excess_power":41.8,"iso":"MISO","name":"Ellendale","slug":"ellendale","state":"ND","verdict":"AVOID"}],"transmission":null}
