{"hero":{"code":"AZ","dominant_iso":"WECC","markets_tracked":8,"name":"Arizona","operational_mw":4138.0,"pipeline_mw":875.0,"verdict":"BUILD"},"is_pro":false,"iso_breakdown":[],"kpis":{"dominant_iso":{"all_isos":[{"iso":"WECC","mw":4030.0}],"iso":"WECC","mw_share":4030.0},"markets_tracked":8,"median_lease_rate":null,"median_lease_rate_error":"UndefinedTable: relation \"powered_shell_pricing\" does not exist","total_facilities":222,"total_operational_mw":4138.0,"total_pipeline_mw":875.0},"live_as_of":{"age_hours":3.8,"iso":"2026-10-27T00:58:12.487199+00:00"},"ma":[],"ok":true,"operators":[],"outlook":{"generated_at":"2026-10-27T04:44:02.841995Z","narrative_md":"**Gilbert:** Gilbert's data center market shows constrained but developable capacity, with 5 tracked facilities operated by fragmented ownership and an excess-power score of 67/100 signaling available generation relative to current demand. GoDaddy, OneNeck IT Solutions LLC, and StrongMind each operate single sites in the market, indicating no dominant player and distributed risk across smaller operators. The market's constraint score of 35/100\u2014measuring infrastructure, permitting, and utility headroom\u2014reflects manageable but non-trivial barriers to expansion, primarily centered on water availability concerns tied to Colorado River allocation and regulatory scrutiny that has intensified as the city weighs formal data center zoning rules.\n\n**Scottsdale:** Scottsdale's data center market remains fragmented and undersupplied, with 13 tracked facilities across the region and Iron Mountain operating the largest footprint at two sites. Power availability is the market's strongest asset, scoring 67 on the DCPI's excess-power index, indicating substantial runway for new capacity deployment. Infrastructure constraints register at 36/100, well below the threshold that would throttle development velocity. Notably, only one tracked site has reported capacity metrics to DC Hub, making granular market sizing difficult but underscoring the opacity typical of smaller regional markets.\n\n**Tempe:** Tempe's data center market is nascent, with 11 tracked facilities across a fragmented operator base and no recent transactional activity. EdgeConneX operates two facilities in the market, while four other operators\u2014EdgeConneX Inc., Alembic Computer Services Inc., and Omnis Network\u2014each maintain single assets. The absence of megawatt reporting from all but one facility suggests either subsized deployments or incomplete disclosure in the existing base. No deals have been tracked in this market in recent periods, indicating either early-stage development or limited capital deployment to date.","rationale":"Aggregated from per-market deep-dive narratives.","verdict":"BUILD","word_count":270},"paywall":{"blurb":"ISO Breakdown, Transmission Build-Out, State Policy / Tax Incentives, Top Operators, and M&A activity are unlocked with the DC Hub plan with every tool, all states.","checkout_url":"/pricing?utm_source=state_brief","required_tier":"PRO"},"policy":null,"redirect_to":null,"requested":"arizona","state":"arizona","state_code":"AZ","state_name":"Arizona","tier":"FREE","top_markets":[{"brief_url":"/markets/gilbert/brief","computed_at":"2026-10-27T00:58:12.487199+00:00","constraint_score":35.5,"excess_power":67.5,"iso":"WECC","name":"Gilbert","slug":"gilbert","state":"AZ","verdict":"BUILD"},{"brief_url":"/markets/scottsdale/brief","computed_at":"2026-10-27T00:54:05.436297+00:00","constraint_score":36.6,"excess_power":67.2,"iso":"WECC","name":"Scottsdale","slug":"scottsdale","state":"AZ","verdict":"BUILD"},{"brief_url":"/markets/tempe/brief","computed_at":"2026-10-27T00:53:58.392455+00:00","constraint_score":36.6,"excess_power":67.1,"iso":"WECC","name":"Tempe","slug":"tempe","state":"AZ","verdict":"BUILD"},{"brief_url":"/markets/chandler/brief","computed_at":"2026-10-27T00:52:33.614889+00:00","constraint_score":40.3,"excess_power":66.1,"iso":"WECC","name":"Chandler","slug":"chandler","state":"AZ","verdict":"BUILD"},{"brief_url":"/markets/goodyear/brief","computed_at":"2026-10-27T00:52:37.472231+00:00","constraint_score":38.0,"excess_power":65.9,"iso":"WECC","name":"Goodyear","slug":"goodyear","state":"AZ","verdict":"BUILD"},{"brief_url":"/markets/mesa/brief","computed_at":"2026-10-27T00:52:01.091325+00:00","constraint_score":43.0,"excess_power":65.3,"iso":"WECC","name":"Mesa","slug":"mesa","state":"AZ","verdict":"BUILD"},{"brief_url":"/markets/tucson/brief","computed_at":"2026-10-27T00:55:10.489881+00:00","constraint_score":31.1,"excess_power":65.1,"iso":"WECC","name":"Tucson","slug":"tucson","state":"AZ","verdict":"BUILD"},{"brief_url":"/markets/phoenix/brief","computed_at":"2026-10-27T00:51:55.797190+00:00","constraint_score":62.1,"excess_power":58.2,"iso":"WECC","name":"Phoenix","slug":"phoenix","state":"AZ","verdict":"CAUTION"}],"transmission":null}
