{"as_of":"2026-10-27","cite_as":"DC Hub (dchub.cloud), \"Interconnection queue by ISO\", https://dchub.cloud/interconnection-queue, as of 2026-10-27, from each ISO's public queue. CC-BY-4.0.","derived_from":"https://dchub.cloud/api/v1/interconnection-queue/snapshot","generated_at":"2026-10-27T09:26:49.394348Z","isos":[{"components":[{"as_of":"2026-10-27","as_of_basis":"live_feed_fetch_date","basis":"mixed_connection_queue","label":"Connection queue (load and generation)","name":"queued_load_total_gw","source_name":"UK NESO TEC Register (active connections queue, per-project MW)","source_url":"https://www.neso.energy/data-portal/transmission-entry-capacity-tec-register","status":"returned","unit":"GW","value":604.9},{"as_of":"2026-10-27","as_of_basis":"live_feed_fetch_date","basis":"as the operator publishes it","label":"Data-center load in the queue","name":"queued_load_data_center_gw","source_name":"UK NESO TEC Register (active connections queue, per-project MW)","source_url":"https://www.neso.energy/data-portal/transmission-entry-capacity-tec-register","status":"returned","unit":"GW","value":53.1}],"iso":"NESO","last_refreshed":"2026-10-27T06:04:46.857758+00:00","refresh_cadence":"daily","source_name":"UK NESO TEC Register (active connections queue, per-project MW)","source_url":"https://www.neso.energy/data-portal/transmission-entry-capacity-tec-register","status":"returned"},{"components":[{"as_of":"2026-09-30","as_of_basis":"published_report","basis":"ERCOT's published active generation interconnection requests (ERCOT's own report: the GIS Summary or the Monthly Operational Overview, named in queued_generation_gw_source); separate from the large-load queue","label":"Active generation interconnection queue","name":"queued_generation_gw","source_name":"ERCOT large-load queue (Senate presentation Jul 29 2026; June 19 LLWG) + generation queue (Sep 30 2026)","source_url":"https://www.ercot.com/files/docs/2026/06/18/June-19-LLWG-Report.pptx","status":"returned","unit":"GW","value":453.8},{"as_of":"2026-09-30","as_of_basis":"published_report","basis":"large_load","label":"Large-load queue","name":"queued_load_total_gw","source_name":"ERCOT large-load queue (Senate presentation Jul 29 2026; June 19 LLWG) + generation queue (Sep 30 2026)","source_url":"https://www.ercot.com/files/docs/2026/06/18/June-19-LLWG-Report.pptx","status":"returned","unit":"GW","value":474.0},{"as_of":"2026-09-30","as_of_basis":"published_report","basis":"DERIVED: ~90% (ERCOT's published data-center share) of the ~474 GW large-load total (ERCOT Senate presentation Jul 29 2026) = ~427 GW; ERCOT does not publish a data-center GW figure itself","label":"Data-center load in the queue","name":"queued_load_data_center_gw","source_name":"ERCOT large-load queue (Senate presentation Jul 29 2026; June 19 LLWG) + generation queue (Sep 30 2026)","source_url":"https://www.ercot.com/files/docs/2026/06/18/June-19-LLWG-Report.pptx","status":"returned","unit":"GW","value":426.6}],"iso":"ERCOT","last_refreshed":"2026-10-27T06:04:24.861816+00:00","refresh_cadence":"monthly","source_name":"ERCOT large-load queue (Senate presentation Jul 29 2026; June 19 LLWG) + generation queue (Sep 30 2026)","source_url":"https://www.ercot.com/files/docs/2026/06/18/June-19-LLWG-Report.pptx","status":"returned"},{"components":[{"as_of":"2026-10-27","as_of_basis":"live_feed_fetch_date","basis":"Active serial + Transition Cycle (TC1/TC2) + Cycle 1 generation requests, sum of MFO (maximum facility output, not firm MW capacity); excludes transmission-service requests, In Service and Withdrawn. Since 2026-10-20 this total includes PJM's Cycle 1 requests, which the serial export alone did not list (that is why it rose from ~135 GW); not a PJM refresh","label":"Active generation interconnection queue","name":"queued_generation_gw","source_name":"PJM cycle + serial service request status (active generation requests, sum of MFO)","source_url":"https://www.pjm.com/planning/m/cycle-service-request-status","status":"returned","unit":"GW","value":374.2},{"as_of":null,"as_of_basis":null,"basis":"This operator's queue does not classify load as data center; DC Hub does not estimate it.","label":"Data-center load in the queue","name":"queued_load_data_center_gw","source_name":null,"source_url":null,"status":"unavailable","unit":"GW","value":null}],"iso":"PJM","last_refreshed":"2026-10-27T06:04:39.836663+00:00","refresh_cadence":"daily","source_name":"PJM cycle + serial service request status (active generation requests, sum of MFO)","source_url":"https://www.pjm.com/planning/m/cycle-service-request-status","status":"returned"},{"components":[{"as_of":"2026-10-27","as_of_basis":"live_feed_fetch_date","basis":"Active only, summer MW; excludes Done, Pending and Withdrawn","label":"Active generation interconnection queue","name":"queued_generation_gw","source_name":"MISO GI Queue API (applicationStatus=Active, summer MW)","source_url":"https://www.misoenergy.org/api/giqueue/getprojects","status":"returned","unit":"GW","value":266.7},{"as_of":null,"as_of_basis":null,"basis":"This operator's queue does not classify load as data center; DC Hub does not estimate it.","label":"Data-center load in the queue","name":"queued_load_data_center_gw","source_name":null,"source_url":null,"status":"unavailable","unit":"GW","value":null}],"iso":"MISO","last_refreshed":"2026-10-27T06:04:40.184918+00:00","refresh_cadence":"daily","source_name":"MISO GI Queue API (applicationStatus=Active, summer MW)","source_url":"https://www.misoenergy.org/api/giqueue/getprojects","status":"returned"},{"components":[{"as_of":"2026-10-27","as_of_basis":"live_feed_fetch_date","basis":"Active requests, max summer MW; excludes cessation","label":"Active generation interconnection queue","name":"queued_generation_gw","source_name":"SPP GI active requests (MAX Summer MW, excl. cessation)","source_url":"https://opsportal.spp.org/Studies/GenerateActiveCsv","status":"returned","unit":"GW","value":186.3},{"as_of":null,"as_of_basis":null,"basis":"This operator's queue does not classify load as data center; DC Hub does not estimate it.","label":"Data-center load in the queue","name":"queued_load_data_center_gw","source_name":null,"source_url":null,"status":"unavailable","unit":"GW","value":null}],"iso":"SPP","last_refreshed":"2026-10-27T06:04:40.964947+00:00","refresh_cadence":"daily","source_name":"SPP GI active requests (MAX Summer MW, excl. cessation)","source_url":"https://opsportal.spp.org/Studies/GenerateActiveCsv","status":"returned"},{"components":[{"as_of":"2026-07-16","as_of_basis":"published_report","basis":"Active only, Net MW to grid (Public Queue Report) + Cluster 15 and Cluster 16 requests (NET MW at POI); co-located hybrid projects counted once; excludes Completed (built) and Withdrawn. Since 2026-10-20 this total includes Clusters 15 and 16, which the Public Queue Report alone did not list (that is why it rose from ~74 GW)","label":"Active generation interconnection queue","name":"queued_generation_gw","source_name":"CAISO queue reports: Public Queue Report (ACTIVE, Net MWs to Grid) + Cluster 15 + Cluster 16 (NET MW POI)","source_url":"https://www.caiso.com/generation-transmission/generation/generator-interconnection","status":"stale","unit":"GW","value":164.9},{"as_of":null,"as_of_basis":null,"basis":"This operator's queue does not classify load as data center; DC Hub does not estimate it.","label":"Data-center load in the queue","name":"queued_load_data_center_gw","source_name":null,"source_url":null,"status":"unavailable","unit":"GW","value":null}],"iso":"CAISO","last_refreshed":"2026-10-27T06:04:41.423899+00:00","refresh_cadence":"daily","source_name":"CAISO queue reports: Public Queue Report (ACTIVE, Net MWs to Grid) + Cluster 15 + Cluster 16 (NET MW POI)","source_url":"https://www.caiso.com/generation-transmission/generation/generator-interconnection","status":"stale"},{"components":[{"as_of":"2026-10-27","as_of_basis":"live_feed_fetch_date","basis":"mixed_connection_queue","label":"Connection queue (load and generation)","name":"queued_load_total_gw","source_name":"Alberta AESO Connection Project List (active; October-2026-Project-List.xlsx)","source_url":"https://www.aeso.ca/grid/connecting-to-the-grid/connection-project-reporting/","status":"returned","unit":"GW","value":26.8},{"as_of":"2026-10-27","as_of_basis":"live_feed_fetch_date","basis":"as the operator publishes it","label":"Data-center load in the queue","name":"queued_load_data_center_gw","source_name":"Alberta AESO Connection Project List (active; October-2026-Project-List.xlsx)","source_url":"https://www.aeso.ca/grid/connecting-to-the-grid/connection-project-reporting/","status":"returned","unit":"GW","value":20.6}],"iso":"AESO","last_refreshed":"2026-10-27T06:04:48.387464+00:00","refresh_cadence":"daily","source_name":"Alberta AESO Connection Project List (active; October-2026-Project-List.xlsx)","source_url":"https://www.aeso.ca/grid/connecting-to-the-grid/connection-project-reporting/","status":"returned"},{"components":[{"as_of":"2026-10-27","as_of_basis":"live_feed_fetch_date","basis":"mixed_connection_queue","label":"Connection queue (load and generation)","name":"queued_load_total_gw","source_name":"Ontario IESO CAA connection queue (active, summer MW)","source_url":"https://www.ieso.ca/en/Get-Involved/Connection-Assessments/Connection-Application-Status","status":"returned","unit":"GW","value":18.3},{"as_of":"2026-10-27","as_of_basis":"live_feed_fetch_date","basis":"as the operator publishes it","label":"Data-center load in the queue","name":"queued_load_data_center_gw","source_name":"Ontario IESO CAA connection queue (active, summer MW)","source_url":"https://www.ieso.ca/en/Get-Involved/Connection-Assessments/Connection-Application-Status","status":"returned","unit":"GW","value":12.2}],"iso":"IESO","last_refreshed":"2026-10-27T06:04:47.777753+00:00","refresh_cadence":"daily","source_name":"Ontario IESO CAA connection queue (active, summer MW)","source_url":"https://www.ieso.ca/en/Get-Involved/Connection-Assessments/Connection-Application-Status","status":"returned"},{"components":[{"as_of":"2026-10-27","as_of_basis":"live_feed_fetch_date","basis":"Status A (active), summer MW; net MW where summer is blank; excludes Completed (C) and Withdrawn (W)","label":"Active generation interconnection queue","name":"queued_generation_gw","source_name":"ISO-NE IRTT Public Queue (active, Summer MW)","source_url":"https://irtt.iso-ne.com/reports/external","status":"returned","unit":"GW","value":11.1},{"as_of":null,"as_of_basis":null,"basis":"This operator's queue does not classify load as data center; DC Hub does not estimate it.","label":"Data-center load in the queue","name":"queued_load_data_center_gw","source_name":null,"source_url":null,"status":"unavailable","unit":"GW","value":null}],"iso":"ISO-NE","last_refreshed":"2026-10-27T06:04:45.962184+00:00","refresh_cadence":"daily","source_name":"ISO-NE IRTT Public Queue (active, Summer MW)","source_url":"https://irtt.iso-ne.com/reports/external","status":"returned"},{"components":[{"as_of":"2026-10-27","as_of_basis":"live_feed_fetch_date","basis":"Active only, summer MW","label":"Active generation interconnection queue","name":"queued_generation_gw","source_name":"NYISO Interconnection Queue (active, SP MW)","source_url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue.xlsx","status":"returned","unit":"GW","value":10.0},{"as_of":null,"as_of_basis":null,"basis":"This operator's queue does not classify load as data center; DC Hub does not estimate it.","label":"Data-center load in the queue","name":"queued_load_data_center_gw","source_name":null,"source_url":null,"status":"unavailable","unit":"GW","value":null}],"iso":"NYISO","last_refreshed":"2026-10-27T06:04:42.530475+00:00","refresh_cadence":"daily","source_name":"NYISO Interconnection Queue (active, SP MW)","source_url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue.xlsx","status":"returned"}],"license":"CC-BY-4.0","receipt":"interconnection_queue","receipt_url":"https://dchub.cloud/api/v1/receipt/queue?iso=neso,ercot,pjm,miso,spp,caiso,aeso,ieso,iso-ne,nyiso","statuses":["returned","stale","withheld","unavailable"]}