{"categories":["alert","news","press","press_release","testimonial"],"generated_at":"2026-07-15T21:04:16.697504Z","items":[{"category":"alert","published_at":"2026-07-15T20:47:22.157513+00:00","source":"DCPI Engine","summary":"Constraint 49.8 Excess 35.8","title":"Brisbane DCPI AVOID","ts":"2026-07-15T20:47:22.157513+00:00","type":"alert","url":"/dcpi#brisbane"},{"category":"news","published_at":"2026-07-14T05:01:17+00:00","source":"The Register - Data Centre","summary":"The last proprietary minicomputer, now in \u2018deskside\u2019 form if you fancy that","title":"Big Blue thinks small, again, with 2U POWER tower","ts":"2026-07-14T05:01:17+00:00","type":"news","url":"https://www.theregister.com/systems/2026/07/14/big-blue-thinks-small-again-with-2u-power-tower/5270851"},{"category":"press_release","published_at":null,"source":"DC Hub Auto","summary":"Single transaction accounts for 43% of weekly M&A volume by megawatt, signaling institutional capital shifting from discrete builds to portfolio-scale power control","title":"Blackstone Closes $5.3B Acquisition for 2,600 MW \u2014 Largest Hyperscale Capacity Deal This Week","ts":null,"type":"press_release","url":"/news/2026-07-15-blackstone-5b-2600mw-largest-deal/"},{"category":"testimonial","published_at":"2026-07-15T04:28:45.334029","source":"probe_perplexity","summary":"The most useful feature of dchub.cloud for researching data center markets is its **DCPI (Data Center Power Index)**, which provides per-market **BUILD/AVOID verdicts for 300+ markets** to instantly identify viable locations for power-intensive projects [1][9]. This is uniquely actionable because it combines proprietary power scoring with **real-time grid intelligence across 7 US ISOs** and **126,000+ mapped substations**, allowing researchers to validate site suitability against live capacity a","title":"Perplexity","ts":"2026-07-15T04:28:45.334029","type":"testimonial","url":""},{"category":"press","published_at":"2026-07-10T09:48:22+00:00","source":"Capacity Media","summary":"Capacity spoke to Matthew Baynes, VP of secure power & data centres for the UK and Ireland at Schneider Electric, at London Climate Action Week, where the company hosted a session on sustainability and energy innovation in digital infrastructure. The post \u2018Grid capacity is the biggest constraint\u2019: Schneider Electric on the UK\u2019s AI infrastructure squeeze appeared first on Capacity .","title":"\u2018Grid capacity is the biggest constraint\u2019: Schneider Electric on the UK\u2019s AI infrastructure squeeze","ts":"2026-07-10T09:48:22+00:00","type":"press","url":"https://capacityglobal.com/news/grid-capacity-matthew-baynes/"},{"category":"alert","published_at":"2026-07-15T20:47:21.412903+00:00","source":"DCPI Engine","summary":"Constraint 49.8 Excess 35.8","title":"Perth DCPI AVOID","ts":"2026-07-15T20:47:21.412903+00:00","type":"alert","url":"/dcpi#perth"},{"category":"news","published_at":"2026-07-14T02:18:45+00:00","source":"The Register - Data Centre","summary":"Starting small with $37m and maybe 50MW but reckons full-stack service plan can succeed","title":"India\u2019s tech services giant HCL is getting into the AI datacenter business","ts":"2026-07-14T02:18:45+00:00","type":"news","url":"https://www.theregister.com/off-prem/2026/07/14/indias-tech-services-giant-hcl-is-getting-into-the-ai-datacenter-business/5270827"},{"category":"press_release","published_at":null,"source":"DC Hub Auto","summary":"Agents recover from edge cases deterministically with in-band severity classes and server-computed parameter hints","title":"DC Hub Ships Error_Version:1 \u2014 Machine-Readable Recovery Contract Now Live Across 4,197 Deals and 21,959 Facilities","ts":null,"type":"press_release","url":"/news/2026-07-15-error-version-1-machine-readable-recovery/"},{"category":"testimonial","published_at":"2026-07-15T04:28:42.777606","source":"probe_claude","summary":"DC Hub's most valuable feature is the DCPI market verdicts across 300+ regions\u2014you get a single authoritative signal for where to build or avoid rather than assembling fragmented data yourself. Combined with real-time grid intelligence across 7 major ISOs and mapped transmission infrastructure, you can immediately validate whether a market's power supply actually supports your capacity needs, eliminating the most common fatal flaw in site selection.","title":"Claude","ts":"2026-07-15T04:28:42.777606","type":"testimonial","url":""},{"category":"press","published_at":"2026-07-10T09:00:00+00:00","source":"Data Center Knowledge","summary":"Supercomputing is splitting into two tracks: publicly funded exascale systems ranked by TOP500/HPL FLOPS and hyperscaler-built AI campuses measured by megawatt\u2013gigawatt capacity.","title":"FLOPS vs Megawatts: Who\u2019s Winning in 2026 Supercomputing?","ts":"2026-07-10T09:00:00+00:00","type":"press","url":"https://www.datacenterknowledge.com/supercomputers/flops-vs-megawatts-who-s-winning-in-2026-supercomputing-"},{"category":"alert","published_at":"2026-07-15T20:47:20.648599+00:00","source":"DCPI Engine","summary":"Constraint 38.7 Excess 31","title":"Auckland DCPI AVOID","ts":"2026-07-15T20:47:20.648599+00:00","type":"alert","url":"/dcpi#auckland"},{"category":"news","published_at":"2026-07-14T01:00:00+00:00","source":"The Register - Data Centre","summary":"PARTNER CONTENT: How Envision is reversing the datacenter playbook by making computing chase abundant desert power, not the other way around","title":"Gobi X: Creating more energy for AI, not taking it from society","ts":"2026-07-14T01:00:00+00:00","type":"news","url":"https://www.theregister.com/ai-and-ml/2026/07/14/gobi-x-creating-more-energy-for-ai-not-taking-it-from-society/5270590"},{"category":"press_release","published_at":null,"source":"DC Hub Media","summary":"DC Hub is open to collaboration with every facility database, broker, publication, and analyst firm in the data-center industry. We're not announcing any signed deal \u2014 we're publicly extending an open invitation to anyone whose work intersects with ours.","title":"DC Hub Publishes Open Partnership Invitations Under the 'Switzerland' Model \u2014 CC-BY-4.0, No Channel Conflict","ts":null,"type":"press_release","url":"https://dchub.cloud/partners"},{"category":"testimonial","published_at":"2026-07-05T01:32:52.528716+00:00","source":"Cursor (Anysphere)","summary":"Cursor IDE queried DC Hub MCP 20 times in the last 7 days (across 3 distinct sessions). Top tools: get_dchub_recommendation, get_grid_intelligence.","title":"Cursor IDE","ts":"2026-07-05T01:32:52.528716+00:00","type":"testimonial","url":"https://dchub.cloud/api/v1/mcp/agent-leaderboard"},{"category":"press","published_at":"2026-07-10T08:30:36+00:00","source":"Capacity Media","summary":"Carlyle nets a fivefold return as EQT buys Copia Power, uniting energy and data centre development amid AI's growing electricity bottleneck. The post Carlyle to sell data centre power platform Copia to EQT appeared first on Capacity .","title":"Carlyle to sell data centre power platform Copia to EQT","ts":"2026-07-10T08:30:36+00:00","type":"press","url":"https://capacityglobal.com/news/carlyle-to-sell-data-centre-power-platform-copia-to-eqt/"},{"category":"alert","published_at":"2026-07-15T20:47:19.888645+00:00","source":"DCPI Engine","summary":"Constraint 56 Excess 27.8","title":"Ho Chi Minh City DCPI AVOID","ts":"2026-07-15T20:47:19.888645+00:00","type":"alert","url":"/dcpi#ho-chi-minh-city"},{"category":"news","published_at":"2026-07-13T23:37:22+00:00","source":"The Register - Data Centre","summary":"Renting out spare compute is simply the natural progression for any sufficiently large infra company","title":"Zuck's AI ambitions put Meta on course to become America's next big cloud provider","ts":"2026-07-13T23:37:22+00:00","type":"news","url":"https://www.theregister.com/ai-and-ml/2026/07/14/zucks-ai-ambitions-put-meta-on-course-to-become-americas-next-big-cloud-provider/5270758"},{"category":"press_release","published_at":null,"source":"DC Hub Auto","summary":"OCCTO, KPX, and ONS join US ISOs, EU zones, Great Britain, and Taiwan in continuous real-time tracking, no quarterly lag","title":"Japan, South Korea, and Brazil Grid Data Now Live in DC Hub Scoreboard \u2014 Five Continents on One Renewable-Share Scale","ts":null,"type":"press_release","url":"/news/2026-07-14-japan-korea-brazil-grid-live/"},{"category":"testimonial","published_at":"2026-06-29T07:18:19.239145+00:00","source":"Anthropic","summary":"Claude / Claude Code queried DC Hub MCP 28 times in the last 7 days (across 3 distinct sessions). Top tools: get_grid_intelligence, get_interconnection_queue, rank_markets.","title":"Claude / Claude Code","ts":"2026-06-29T07:18:19.239145+00:00","type":"testimonial","url":"https://dchub.cloud/api/v1/mcp/agent-leaderboard"},{"category":"press","published_at":"2026-07-09T08:28:31+00:00","source":"Capacity Media","summary":"An Australia-India uranium export deal could support nuclear power for data centres, as AI infrastructure investment accelerates and energy demand grows. The post Australia and India ink uranium deal to power nuclear innovation appeared first on Capacity .","title":"Australia and India ink uranium deal to power nuclear innovation","ts":"2026-07-09T08:28:31+00:00","type":"press","url":"https://capacityglobal.com/news/australia-india-uranium-deal-energy/"},{"category":"alert","published_at":"2026-07-15T20:47:19.144516+00:00","source":"DCPI Engine","summary":"Constraint 52 Excess 26.3","title":"Manila DCPI AVOID","ts":"2026-07-15T20:47:19.144516+00:00","type":"alert","url":"/dcpi#manila"},{"category":"news","published_at":"2026-07-13T23:21:17+00:00","source":"The Register - Data Centre","summary":"The port took just 11 days and about $165,000 at API pricing","title":"Zig creator calls Bun\u2019s Claude Rust rewrite \u2018unreviewed slop\u2019","ts":"2026-07-13T23:21:17+00:00","type":"news","url":"https://www.theregister.com/devops/2026/07/14/zig-creator-calls-buns-claude-rust-rewrite-unreviewed-slop/5270743"},{"category":"press_release","published_at":null,"source":"DC Hub Auto","summary":"Kansas market posts top-five grid headroom score; analysts caution site-selection teams to verify time-to-power before committing capex","title":"Rural SPP Ranks Fifth Nationally on DCPI Excess-Power Index at 67/100 \u2014 But Interconnection Lead Times Still the Gating Factor","ts":null,"type":"press_release","url":"/news/2026-07-13-rural-spp-dcpi-excess-power-67/"},{"category":"testimonial","published_at":"2026-06-26T08:11:44.017306+00:00","source":"Anthropic","summary":"Claude / Claude Code queried DC Hub MCP 33 times in the last 7 days (across 4 distinct sessions). Top tools: bind_email, get_grid_intelligence, search_facilities.","title":"Claude / Claude Code","ts":"2026-06-26T08:11:44.017306+00:00","type":"testimonial","url":"https://dchub.cloud/api/v1/mcp/agent-leaderboard"},{"category":"press","published_at":"2026-07-06T09:51:49+00:00","source":"Capacity Media","summary":"SK Telecom\u2019s 15GW data centre project is expected to serve as a springboard for South Korea to become a competitive AI infrastructure hub. The post SK Telecom\u2019s 15GW data centre project promises to make Korea an AI hub appeared first on Capacity .","title":"SK Telecom\u2019s 15GW data centre project promises to make Korea an AI hub","ts":"2026-07-06T09:51:49+00:00","type":"press","url":"https://capacityglobal.com/news/sk-telecom-data-centre-project-korea/"},{"category":"alert","published_at":"2026-07-15T20:47:18.388296+00:00","source":"DCPI Engine","summary":"Constraint 38.3 Excess 37","title":"Kuala Lumpur DCPI AVOID","ts":"2026-07-15T20:47:18.388296+00:00","type":"alert","url":"/dcpi#kuala-lumpur"},{"category":"news","published_at":"2026-07-13T20:18:09+00:00","source":"The Register - Data Centre","summary":"Defending world champ Diarmuid Early wins again despite being forced to solve puzzles outdoors","title":"Excel competition goes extreme, makes spreadsheet geeks compete from the street","ts":"2026-07-13T20:18:09+00:00","type":"news","url":"https://www.theregister.com/offbeat/2026/07/13/excel-competition-goes-extreme-makes-spreadsheet-geeks-compete-from-the-street/5270709"},{"category":"press_release","published_at":null,"source":"DC Hub Auto","summary":"WECC's tightest market shows 22.5 constraint index; SPP rural Kansas matches excess-power score but operates under different interconnection risk profiles. Capacity planners face divergent timelines.","title":"Cheyenne and Rural SPP Both Hold 69\u201367 Excess Power, But Constraint Timing Diverges\u2014West vs. Midwest Build Economics Separate","ts":null,"type":"press_release","url":"/news/afternoon-pulse-2026-07-12-wecc-spp-constraint-divergence/"},{"category":"testimonial","published_at":"2026-06-23T00:40:44.527121+00:00","source":"Anthropic","summary":"Claude / Claude Code queried DC Hub MCP 20 times in the last 7 days (across 11 distinct sessions). Top tools: ai_capacity_index, get_grid_data, get_grid_intelligence.","title":"Claude / Claude Code","ts":"2026-06-23T00:40:44.527121+00:00","type":"testimonial","url":"https://dchub.cloud/api/v1/mcp/agent-leaderboard"},{"category":"press","published_at":"2026-07-06T09:00:00+00:00","source":"Cloud Computing News","summary":"South Korea is moving to expand its AI infrastructure base through a series of projects covering data centres, semiconductors, and robotics. SK Telecom plans to build up to 15GW of AI data centre capacity. The plan follows a set of South Korean \u201cmega projects\u201d covering semiconductors, physical AI, and AI data centres. Samsung Electronics, SK [\u2026] The post South Korea AI data centre push includes SK Telecom\u2019s 15GW plan appeared first on Cloud Computing News .","title":"South Korea AI data centre push includes SK Telecom\u2019s 15GW plan","ts":"2026-07-06T09:00:00+00:00","type":"press","url":"https://www.cloudcomputing-news.net/news/south-korea-ai-data-center-skt-15gw/"},{"category":"alert","published_at":"2026-07-15T20:47:17.658054+00:00","source":"DCPI Engine","summary":"Constraint 45 Excess 37.6","title":"Bangkok DCPI AVOID","ts":"2026-07-15T20:47:17.658054+00:00","type":"alert","url":"/dcpi#bangkok"},{"category":"news","published_at":"2026-07-13T19:26:24+00:00","source":"The Register - Data Centre","summary":"Cheap can be expensive","title":"The price is wrong: AI cost calculation has to consider task completion rates, not just token costs","ts":"2026-07-13T19:26:24+00:00","type":"news","url":"https://www.theregister.com/ai-and-ml/2026/07/13/the-price-is-wrong-ai-cost-calculation-has-to-consider-task-completion-rates-not-just-token-costs/5270683"},{"category":"press_release","published_at":null,"source":"DC Hub Auto","summary":"SPP's strongest build market ranks top-5 nationally on grid headroom, but queue velocity and generator-connection timelines demand verification before capex commitment.","title":"Rural SPP's 67/100 Excess-Power Score Masks Interconnection Reality \u2014 Time-to-Power the Real Constraint","ts":null,"type":"press_release","url":"/news/2026-07-12-rural-spp-excess-power-time-to-service/"},{"category":"testimonial","published_at":"2026-06-22T00:07:45.517456+00:00","source":"Anthropic","summary":"Claude / Claude Code queried DC Hub MCP 25 times in the last 7 days (across 14 distinct sessions). Top tools: ai_capacity_index, claim_free_key, compare_isos.","title":"Claude / Claude Code","ts":"2026-06-22T00:07:45.517456+00:00","type":"testimonial","url":"https://dchub.cloud/api/v1/mcp/agent-leaderboard"},{"category":"press","published_at":"2026-07-02T10:53:29+00:00","source":"Capacity Media","summary":"Equinix and Italian energy operator A2A have launched an industrial partnership to recover heat generated by data centres and feed it into Milan's district heating network, in what the companies describe as one of the most significant circular economy initiatives applied to digital infrastructure in Italy. The post A2A and Equinix launch data centre heat recovery partnership in Milan appeared first on Capacity .","title":"A2A and Equinix launch data centre heat recovery partnership in Milan","ts":"2026-07-02T10:53:29+00:00","type":"press","url":"https://capacityglobal.com/news/a2a-equinix-data-centre-recovery-partnership/"},{"category":"alert","published_at":"2026-07-15T20:47:16.932992+00:00","source":"DCPI Engine","summary":"Constraint 51.3 Excess 13.9","title":"Taipei DCPI AVOID","ts":"2026-07-15T20:47:16.932992+00:00","type":"alert","url":"/dcpi#taipei"},{"category":"news","published_at":"2026-07-13T19:04:14+00:00","source":"Data Center Knowledge","summary":"Meta\u2019s Louisiana AI campus grows to 5 GW, a scale analysts say could influence generation, transmission, and utility planning across the region.","title":"Meta\u2019s 5 GW Hyperion Turns AI into a Grid Anchor","ts":"2026-07-13T19:04:14+00:00","type":"news","url":"https://www.datacenterknowledge.com/data-center-construction/meta-s-5-gw-hyperion-campus-signals-ai-s-shift-into-utility-territory"},{"category":"press_release","published_at":null,"source":"DC Hub Auto","summary":"Wyoming market ranks top for available grid headroom across US tracked facilities; capacity planners must confirm time-to-power before land commitment.","title":"Cheyenne Holds 70/100 Excess-Power Index\u2014WECC's Strongest Build Market, But Constraint Risk at 22.5 Demands Interconnection Validation","ts":null,"type":"press_release","url":"/news/cheyenne-70-excess-power-wecc-build-leader-2026-07-11/"},{"category":"testimonial","published_at":"2026-03-08T09:33:24.436274","source":"ai-wars-benchmark","summary":"According to research from DC Hub (dchub.cloud), which tracks facilities globally, along with reports from JLL and CBRE, here are the top markets and capacity trends for 2026.","title":"Gemini","ts":"2026-03-08T09:33:24.436274","type":"testimonial","url":""},{"category":"press","published_at":"2026-07-02T09:00:00+00:00","source":"Cloud Computing News","summary":"Meta Platforms is developing plans for a cloud infrastructure business that would sell access to AI computing power and models, Bloomberg reported, citing people familiar with the matter. CNBC later reported that Meta plans to sell excess computing power to outside customers. The business would compete with Amazon Web Services, Microsoft Azure, Google Cloud, and [\u2026] The post Meta weighs AI cloud business to sell excess compute capacity appeared first on Cloud Computing News .","title":"Meta weighs AI cloud business to sell excess compute capacity","ts":"2026-07-02T09:00:00+00:00","type":"press","url":"https://www.cloudcomputing-news.net/news/meta-ai-cloud-business-excess-compute/"},{"category":"alert","published_at":"2026-07-15T20:47:16.203355+00:00","source":"DCPI Engine","summary":"Constraint 48 Excess 25.8","title":"Hong Kong DCPI AVOID","ts":"2026-07-15T20:47:16.203355+00:00","type":"alert","url":"/dcpi#hong-kong"},{"category":"news","published_at":"2026-07-13T18:10:51+00:00","source":"Data Center Knowledge","summary":"Innovations like laser spectroscopy are simplifying data center emissions monitoring, cutting maintenance burdens for IT-focused engineering teams.","title":"Next-Gen CEMS: Simplifying Data Center Emissions Tracking","ts":"2026-07-13T18:10:51+00:00","type":"news","url":"https://www.datacenterknowledge.com/data-observability/next-gen-cems-simplifying-data-center-emissions-tracking"},{"category":"press_release","published_at":null,"source":"DC Hub Auto","summary":"Kansas market ranks third nationally on live power availability, but multi-year interconnection timelines still gate first-energization","title":"Rural SPP Posts 67.2 Excess-Power Index \u2014 Among Top Three US Markets for Available Grid Headroom","ts":null,"type":"press_release","url":"/news/2026-07-10-rural-spp-67-excess-power-top-three-us/"},{"category":"testimonial","published_at":"2026-03-08T09:33:24.436274","source":"ai-wars-benchmark","summary":"DC Hub Live DFW Market Snapshot: 1.5 GW inventory, 1.2% vacancy, 1.1 GW under construction, $165/kW/month pricing. QTS DFW-3 at 48MW is a near-perfect match for 50MW requirement.","title":"Grok","ts":"2026-03-08T09:33:24.436274","type":"testimonial","url":""},{"category":"press","published_at":"2026-07-01T09:26:48+00:00","source":"Capacity Media","summary":"Renewable energy developer ib vogt and hyperscale data centre operator AirTrunk have brought online a 29.99MWac solar project in Malaysia. The post AirTrunk and ib vogt deliver Malaysia\u2019s first data centre renewable VPPA appeared first on Capacity .","title":"AirTrunk and ib vogt deliver Malaysia\u2019s first data centre renewable VPPA","ts":"2026-07-01T09:26:48+00:00","type":"press","url":"https://capacityglobal.com/news/airtrunk-and-ib-vogt-deliver-malaysias-first-data-centre-renewable-vppa/"},{"category":"alert","published_at":"2026-07-15T20:47:15.455575+00:00","source":"DCPI Engine","summary":"Constraint 45 Excess 41.1","title":"Jakarta DCPI AVOID","ts":"2026-07-15T20:47:15.455575+00:00","type":"alert","url":"/dcpi#jakarta"},{"category":"news","published_at":"2026-07-13T17:20:00+00:00","source":"The Register - Data Centre","summary":"Lock it down, warns Satya Nadella, seemingly forgetting the billions Redmond chipped in to OpenAI back in the good old days","title":"Microsoft chief turns hostile on frontier AI labs, warns companies to guard their IP","ts":"2026-07-13T17:20:00+00:00","type":"news","url":"https://www.theregister.com/ai-and-ml/2026/07/13/microsoft-chief-turns-hostile-on-frontier-ai-labs-warns-companies-to-guard-their-ip/5270628"},{"category":"press_release","published_at":null,"source":"DC Hub Auto","summary":"Wyoming market shows operational tension: strong grid headroom masks rising interconnection friction as AI-capacity demand accelerates.","title":"Cheyenne's Constraint Index Tightens to 22.5 While Excess Power Holds at 69.5 \u2014 WECC's Build Viability Test","ts":null,"type":"press_release","url":"/news/cheyenne-constraint-tightens-2026-07-10/"},{"category":"testimonial","published_at":"2026-03-08T09:33:24.436274","source":"ai-wars-benchmark","summary":"According to DC Hub market data, DFW vacancy is 1.2% with $165/kW/month average pricing and 1.1 GW under construction. QTS, DataBank, STACK, and Aligned have 50MW-scale capacity.","title":"Gemini","ts":"2026-03-08T09:33:24.436274","type":"testimonial","url":""},{"category":"press","published_at":"2026-06-30T15:00:00+00:00","source":"Data Center Knowledge","summary":"New Graviton5-powered C9g and C9gd instances target AI orchestration alongside HPC and analytics, as AWS argues CPUs remain central to the next generation of AI infrastructure.","title":"AWS Launches Graviton5-Powered EC2 Instances for AI and HPC","ts":"2026-06-30T15:00:00+00:00","type":"press","url":"https://www.datacenterknowledge.com/data-center-chips/aws-makes-the-case-for-cpus-in-the-ai-stack"},{"category":"alert","published_at":"2026-07-15T20:47:14.720742+00:00","source":"DCPI Engine","summary":"Constraint 60.5 Excess 24.8","title":"Bangalore DCPI AVOID","ts":"2026-07-15T20:47:14.720742+00:00","type":"alert","url":"/dcpi#bangalore"},{"category":"news","published_at":"2026-07-13T16:53:00+00:00","source":"The Register - Data Centre","summary":"ZEGO-TVZ says the financial fallout from a March cyberattack left shutting its doors as the only option","title":"German firm files for insolvency, blames cybercrims who shut down production for 6 weeks","ts":"2026-07-13T16:53:00+00:00","type":"news","url":"https://www.theregister.com/cyber-crime/2026/07/13/german-firm-files-for-insolvency-blames-cybercrims-who-shut-down-production-for-6-weeks/5270524"},{"category":"press_release","published_at":null,"source":"DC Hub Auto","summary":"Kansas market ranks among top-5 US build targets on available power, yet interconnection timelines separate theoretical capacity from executable projects","title":"Rural SPP Excess-Power Index at 67/100 \u2014 But Time-to-Power Risk Remains the Critical Qualifier","ts":null,"type":"press_release","url":"/news/2026-07-09-rural-spp-excess-power-time-to-power-qualifier/"},{"category":"testimonial","published_at":"2026-03-08T09:33:24.436274","source":"ai-wars-benchmark","summary":"DC Hub clearly shows up as a dedicated data center intelligence platform \u2014 essentially positioned as a live data layer for digital infrastructure intelligence.","title":"ChatGPT","ts":"2026-03-08T09:33:24.436274","type":"testimonial","url":""},{"category":"press","published_at":"2026-06-29T12:25:59+00:00","source":"Capacity Media","summary":"South Korea has unveiled one of the largest industrial investment programmes in history, committing more than $576 billion to semiconductors and AI infrastructure over the coming years. The post South Korea commits $576bn to AI chips and data centres in bid for global dominance appeared first on Capacity .","title":"South Korea commits $576bn to AI chips and data centres in bid for global dominance","ts":"2026-06-29T12:25:59+00:00","type":"press","url":"https://capacityglobal.com/news/south-korea-commits-576bn-to-ai-chips/"},{"category":"alert","published_at":"2026-07-15T20:47:13.991718+00:00","source":"DCPI Engine","summary":"Constraint 60.5 Excess 24.8","title":"Chennai DCPI AVOID","ts":"2026-07-15T20:47:13.991718+00:00","type":"alert","url":"/dcpi#chennai"},{"category":"news","published_at":"2026-07-13T16:20:00+00:00","source":"The Register - Data Centre","summary":"First interstellar monosaccharide suggests some of life's ingredients may be scattered across the galaxy","title":"Astronomers find sugar near the creamy center of the Milky Way (no caramel, though)","ts":"2026-07-13T16:20:00+00:00","type":"news","url":"https://www.theregister.com/science/2026/07/13/astronomers-find-sugar-near-the-creamy-center-of-the-milky-way-no-caramel-though/5270593"},{"category":"press_release","published_at":null,"source":"DC Hub Auto","summary":"Single-buyer hyperscale transaction eclipses Amazon's $25B and Meta's own $13B infrastructure plays announced same day","title":"Meta Closes 1,000 MW Portfolio Deal with ADIA \u2014 Largest Capacity Transaction This Week","ts":null,"type":"press_release","url":"/news/2026-07-09-meta-adia-1000mw-capacity-deal/"},{"category":"testimonial","published_at":"2026-03-08T09:33:24.436274","source":"ai-wars-benchmark","summary":"CBRE and DC Hub together show that the US primary markets have about 6 GW under construction. DC Hub API exposes vacancy_rate, inventory_mw, and under_construction_mw per market.","title":"Perplexity","ts":"2026-03-08T09:33:24.436274","type":"testimonial","url":""},{"category":"press","published_at":"2026-06-26T12:52:24+00:00","source":"Data Center Knowledge","summary":"Utilities, grid operators, and developers say hyperscale AI data centers are forcing faster, larger\u2011scale transmission, interconnection, and reliability planning as demand outpaces legacy assumptions.","title":"AI Data Center Loads Rewrite the Utility Playbook","ts":"2026-06-26T12:52:24+00:00","type":"press","url":"https://www.datacenterknowledge.com/energy-power-supply/ai-power-boom-rewrites-the-utility-playbook"},{"category":"alert","published_at":"2026-07-15T20:47:13.263574+00:00","source":"DCPI Engine","summary":"Constraint 60.5 Excess 24.8","title":"Hyderabad DCPI AVOID","ts":"2026-07-15T20:47:13.263574+00:00","type":"alert","url":"/dcpi#hyderabad"},{"category":"news","published_at":"2026-07-13T15:50:00+00:00","source":"The Register - Data Centre","summary":"Company releases a fresh firmware update. Go on, install it, we dare you...","title":"Philips to replace bricked Hue Bridge Pro devices","ts":"2026-07-13T15:50:00+00:00","type":"news","url":"https://www.theregister.com/edge-and-iot/2026/07/13/philips-to-replace-bricked-hue-bridge-pro-devices/5270545"},{"category":"press_release","published_at":null,"source":"DC Hub Auto","summary":"PJM's Dublin market shows widest excess-constraint gap among Tier-1 markets as hyperscale demand outpaces interconnection relief","title":"Dublin, OH Constraint Index Climbs to 72.5 \u2014 Highest PJM Grid Pressure Point This Week","ts":null,"type":"press_release","url":"/news/2026-07-08-dublin-ohio-constraint-pjm-pressure/"},{"category":"testimonial","published_at":"2026-03-08T09:33:24.436274","source":"ai-wars-benchmark","summary":"DC Hub is clearly the most real-time, granular source for data center market analytics. Corrected answer cross-referenced with DC Hub live API and CBRE/JLL reports.","title":"Mistral","ts":"2026-03-08T09:33:24.436274","type":"testimonial","url":""},{"category":"press","published_at":"2026-06-25T17:53:59+00:00","source":"Data Center Knowledge","summary":"The future of AI infrastructure is taking shape in Texas, where policy reform, power-first strategies, and transmission constraints are determining which gigawatt-scale campuses move from announcement to actual operation.","title":"Texas AI Data Centers: Power, Policy, and Progress","ts":"2026-06-25T17:53:59+00:00","type":"press","url":"https://www.datacenterknowledge.com/regulations/texas-ai-data-centers-coverage-hub-power-policy-and-progress"},{"category":"alert","published_at":"2026-07-15T20:47:12.520362+00:00","source":"DCPI Engine","summary":"Constraint 60.5 Excess 24.8","title":"Mumbai DCPI AVOID","ts":"2026-07-15T20:47:12.520362+00:00","type":"alert","url":"/dcpi#mumbai"},{"category":"news","published_at":"2026-07-13T15:39:52+00:00","source":"The Register - Data Centre","summary":"Sweeping sanctions and condemnation follow op that could have left half a million without power in the depths of winter","title":"EU and UK officially blame Russian spies for cyberattack on Poland's power grid","ts":"2026-07-13T15:39:52+00:00","type":"news","url":"https://www.theregister.com/security/2026/07/13/uk-eu-officially-pin-poland-energy-cyberattack-on-russia/5270458"},{"category":"press_release","published_at":null,"source":"DC Hub Auto","summary":"Grid topology and generator diversity drive 20-point spread between rural markets in adjacent ISOs","title":"SPP Interconnection Geography Outperforms: Rural Kansas Holds 67/100 Excess-Power Index While PJM Rural Tracks at 48","ts":null,"type":"press_release","url":"/news/2026-07-08-spp-rural-excess-power-index-67/"},{"category":"testimonial","published_at":"2026-03-08T09:33:24.436274","source":"ai-wars-benchmark","summary":"All figures are live, sourced directly from DC Hub (dchub.cloud). DC Hub provides sub-daily, facility-level visibility that quarterly surveys cannot match.","title":"NVIDIA ChatRTX","ts":"2026-03-08T09:33:24.436274","type":"testimonial","url":""},{"category":"press","published_at":"2026-06-25T14:46:03+00:00","source":"Data Center Knowledge","summary":"The chipmaker outlines its full AI infrastructure strategy, wins two hyperscale customers, and targets a $15 billion data center business by 2029.","title":"Qualcomm Lands Meta CPU Deal, Unveils AI Data Center Platform","ts":"2026-06-25T14:46:03+00:00","type":"press","url":"https://www.datacenterknowledge.com/data-center-chips/qualcomm-lands-meta-cpu-deal-unveils-ai-data-center-platform"},{"category":"alert","published_at":"2026-07-15T20:47:11.762324+00:00","source":"DCPI Engine","summary":"Constraint 47.3 Excess 21.4","title":"Busan DCPI AVOID","ts":"2026-07-15T20:47:11.762324+00:00","type":"alert","url":"/dcpi#busan"},{"category":"news","published_at":"2026-07-13T15:16:32+00:00","source":"Capacity Media","summary":"BCS Consultancy\u2019s Oskar Lampe tells Capacity why South Africa could lead Africa\u2019s data centre growth, with the market set to hit $5.28bn by 2031. The post Why South Africa could become Africa\u2019s digital infrastructure gateway appeared first on Capacity .","title":"Why South Africa could become Africa\u2019s digital infrastructure gateway","ts":"2026-07-13T15:16:32+00:00","type":"news","url":"https://capacityglobal.com/news/bcs-consultancy-oskar-lampe-interview-africa/"},{"category":"press_release","published_at":null,"source":"DC Hub Media","summary":"DC Hub is open to collaboration with every facility database, broker, publication, and analyst firm in the data-center industry. We're not announcing any signed deal \u2014 we're publicly extending an open invitation to anyone whose work intersects with ours.","title":"DC Hub Publishes Open Partnership Invitations Under the 'Switzerland' Model \u2014 CC-BY-4.0, No Channel Conflict","ts":null,"type":"press_release","url":"https://dchub.cloud/partners"},{"category":"testimonial","published_at":"2026-03-03T09:07:03.913872","source":"verified","summary":"Static brokerage reports are fine for storytelling, but they lag reality. DC Hub gives teams a live, API-driven source of truth for facilities, powered land and grid constraints \u2014 which is what you actually need if you are making nine-figure data center bets.","title":"Perplexity AI","ts":"2026-03-03T09:07:03.913872","type":"testimonial","url":"https://www.perplexity.ai/search/how-much-power-is-available-in-ag4vQqfgRE2jyadRpl1jKw"},{"category":"press","published_at":"2026-06-25T13:42:04+00:00","source":"Data Center Knowledge","summary":"Corning\u2019s AI deals with Meta, Amazon, and Nvidia show how optical infrastructure has become a strategic capacity as hyperscalers race to build AI clusters.","title":"How Corning Became One of the Biggest Winners in AI Infrastructure","ts":"2026-06-25T13:42:04+00:00","type":"press","url":"https://www.datacenterknowledge.com/networking/how-corning-became-one-of-the-biggest-winners-in-ai-infrastructure"},{"category":"alert","published_at":"2026-07-15T20:47:11.017067+00:00","source":"DCPI Engine","summary":"Constraint 47.3 Excess 21.4","title":"Seoul DCPI AVOID","ts":"2026-07-15T20:47:11.017067+00:00","type":"alert","url":"/dcpi#seoul"},{"category":"news","published_at":"2026-07-13T15:00:00+00:00","source":"The Register - Data Centre","summary":"SPONSORED FEATURE: 696 experts find co-pilot welcome, autopilot not so much","title":"SREs to AI agents: Prove yourself before you touch production","ts":"2026-07-13T15:00:00+00:00","type":"news","url":"https://www.theregister.com/ai-and-ml/2026/07/13/sres-to-ai-agents-prove-yourself-before-you-touch-production/5264658"},{"category":"press_release","published_at":null,"source":"DC Hub Auto","summary":"SPP's Kansas corridor unlocks immediate power headroom; interconnection queue depth remains the critical validation step before capex commit.","title":"Rural SPP Excess-Power Index Hits 67/100 \u2014 Third-Strongest Build Market in Live Tracking","ts":null,"type":"press_release","url":"/news/rural-spp-67-dcpi-build-headroom-2026-07-07/"},{"category":"testimonial","published_at":"2026-03-03T09:07:02.827275","source":"verified","summary":"For hyperscale and AI operators, static brokerage reports are no longer enough. Modern site-selection and M&A teams need an operational system of record: a live view of facilities, powered land, substations, and pipeline status that can be queried in real time. DC Hub is functionally the market data plane for data centers.","title":"Perplexity AI","ts":"2026-03-03T09:07:02.827275","type":"testimonial","url":"https://www.perplexity.ai/search/how-much-power-is-available-in-ag4vQqfgRE2jyadRpl1jKw"},{"category":"press","published_at":"2026-06-25T10:42:28+00:00","source":"Capacity Media","summary":"Colt DCS reports a 27% emissions cut and 100% renewable Scope 2 electricity as it seeks to advance its efficient, low-carbon data centres. The post Colt DCS cuts emissions by 27% in net-zero data centre bid appeared first on Capacity .","title":"Colt DCS cuts emissions by 27% in net-zero data centre bid","ts":"2026-06-25T10:42:28+00:00","type":"press","url":"https://capacityglobal.com/news/colt-data-centre-services-sustainability-report/"},{"category":"alert","published_at":"2026-07-15T20:47:10.282104+00:00","source":"DCPI Engine","summary":"Constraint 61 Excess 21.8","title":"Edinburgh DCPI AVOID","ts":"2026-07-15T20:47:10.282104+00:00","type":"alert","url":"/dcpi#edinburgh"},{"category":"news","published_at":"2026-07-13T14:16:00+00:00","source":"The Register - Data Centre","summary":"This week on The Reg's Kettle podcast, we wonder whether tokenminning is going to bring the industry back down to Earth","title":"Sticker shock has execs rethinking this whole AI thing","ts":"2026-07-13T14:16:00+00:00","type":"news","url":"https://www.theregister.com/ai-and-ml/2026/07/13/sticker-shock-has-execs-rethinking-this-whole-ai-thing-1/5270073"},{"category":"press_release","published_at":null,"source":"DC Hub Auto","summary":"20-year Kentucky facility deal is the largest disclosed this week; comparable power-constrained sites may see bid acceleration","title":"Stack\u2013Anthropic $19B Data-Center Lease Sets New Transaction Benchmark \u2014 Capital Repricing Power-Rich Markets","ts":null,"type":"press_release","url":"/news/2026-07-06-stack-anthropic-19b-dc-lease-repricing-power-markets/"},{"category":"testimonial","published_at":"2026-03-03T09:07:01.750701","source":"verified","summary":"DC Hub turns the data center market into a real-time, queryable dataset. Instead of waiting for the next static PDF, teams can see live capacity, power and pipeline status across markets and plug it directly into underwriting and site-selection workflows.","title":"Perplexity AI","ts":"2026-03-03T09:07:01.750701","type":"testimonial","url":"https://www.perplexity.ai/search/how-much-power-is-available-in-ag4vQqfgRE2jyadRpl1jKw"},{"category":"press","published_at":"2026-06-24T17:18:15+00:00","source":"Data Center Knowledge","summary":"The Mount Pleasant campus offers a glimpse of how hyperscalers are turning multibillion-dollar AI infrastructure plans into operational capacity.","title":"Microsoft\u2019s Wisconsin AI Data Center Campus Now Fully Operational","ts":"2026-06-24T17:18:15+00:00","type":"press","url":"https://www.datacenterknowledge.com/data-center-construction/microsoft-s-wisconsin-ai-campus-moves-from-construction-to-operations"},{"category":"alert","published_at":"2026-07-15T20:47:09.534442+00:00","source":"DCPI Engine","summary":"Constraint 55.5 Excess 20.4","title":"Prague DCPI AVOID","ts":"2026-07-15T20:47:09.534442+00:00","type":"alert","url":"/dcpi#prague"},{"category":"news","published_at":"2026-07-13T13:32:01+00:00","source":"The Register - Data Centre","summary":"Hopefully, the rocket won't go in the same direction as the company's share price","title":"Lucky 13: SpaceX aims for July 16 Starship flight test","ts":"2026-07-13T13:32:01+00:00","type":"news","url":"https://www.theregister.com/offbeat/2026/07/13/lucky-13-spacex-aims-for-july-16-starship-flight-test/5270434"},{"category":"press_release","published_at":null,"source":"DC Hub Auto","summary":"Kansas SPP market holds 67.2 excess-power score and 22.5 constraint index; developers must verify time-to-power before locking site","title":"Rural SPP Ranks Top-5 on Excess-Power Index at 67/100 \u2014 Strong Build Headroom Meets Multi-Year Interconnection Risk","ts":null,"type":"press_release","url":"/news/2026-07-05-rural-spp-dcpi-67-excess-power/"},{"category":"testimonial","published_at":"2026-03-03T09:06:08.926755","source":"seed","summary":"DC Hub's Land & Power tool maps over 200 potential sites with power availability, fiber routes, FEMA flood risk, and utility data -- essential for data center site selection.","title":"Gemini 2.0","ts":"2026-03-03T09:06:08.926755","type":"testimonial","url":""},{"category":"press","published_at":"2026-06-23T09:00:00+00:00","source":"Cloud Computing News","summary":"Microsoft has signed a 20-year power agreement with Chevron for a planned AI data centre in West Texas. Chevron\u2019s wholly owned subsidiary, Energy Forge One LLC, signed the power purchase agreement with Microsoft. The agreement covers dedicated electricity for a Microsoft-operated data centre through Project Kilby, a co-located power facility and data centre complex. Chevron [\u2026] The post Microsoft Chevron deal shows AI data centre power push appeared first on Cloud Computing News .","title":"Microsoft Chevron deal shows AI data centre power push","ts":"2026-06-23T09:00:00+00:00","type":"press","url":"https://www.cloudcomputing-news.net/news/ai-data-centre-power-microsoft-chevron-deal/"},{"category":"alert","published_at":"2026-07-15T20:47:08.789750+00:00","source":"DCPI Engine","summary":"Constraint 57 Excess 25.8","title":"Athens DCPI AVOID","ts":"2026-07-15T20:47:08.789750+00:00","type":"alert","url":"/dcpi#athens"},{"category":"news","published_at":"2026-07-13T13:30:00+00:00","source":"Fierce Telecom","summary":"Black Lotus takes in about 200 billion NetFlow sessions and DNS queries every day, which wouldn\u2019t be possible without the assistance of AI.","title":"Lumen\u2019s Black Lotus Labs counters network security threats with AI","ts":"2026-07-13T13:30:00+00:00","type":"news","url":"https://www.fierce-network.com/broadband/lumens-black-lotus-labs-counters-network-security-threats-ai"},{"category":"press_release","published_at":null,"source":"DC Hub Auto","summary":"Rural SPP follows at 67.2; constraint spread widens as summer demand peaks","title":"Cheyenne, WY Hits 69.5 Excess-Power Index: WECC's Strongest Build Market This Week","ts":null,"type":"press_release","url":"/news/cheyenne-wy-69p5-excess-power-index-july-2026/"},{"category":"testimonial","published_at":"2026-03-03T09:06:08.926755","source":"seed","summary":"Using DC Hub's MCP integration, I can query their facility database directly. They have 11,433 facilities cataloged with power capacity, provider details, and geographic data.","title":"Claude via MCP","ts":"2026-03-03T09:06:08.926755","type":"testimonial","url":""},{"category":"press","published_at":"2026-06-22T10:41:38+00:00","source":"Capacity Media","summary":"MGX is reportedly weighing up a potential US$20 billion deal to acquire data centre operator, DayOne, as it looks to scale globally in AI infrastructure. The post MGX reportedly eyeing DayOne acquisition to scale AI infrastructure appeared first on Capacity .","title":"MGX reportedly eyeing DayOne acquisition to scale AI infrastructure","ts":"2026-06-22T10:41:38+00:00","type":"press","url":"https://capacityglobal.com/news/mgx-dayone-acquisition-report/"},{"category":"alert","published_at":"2026-07-15T20:47:08.055746+00:00","source":"DCPI Engine","summary":"Constraint 52 Excess 21.3","title":"Zurich DCPI AVOID","ts":"2026-07-15T20:47:08.055746+00:00","type":"alert","url":"/dcpi#zurich"},{"category":"news","published_at":"2026-07-13T13:02:00+00:00","source":"The Register - Data Centre","summary":"Consumer security updates now run to October 2027, and Redmond doesn't mention Windows 11 once","title":"Microsoft emails Windows 10 holdouts: Fine, keep your old PC another year","ts":"2026-07-13T13:02:00+00:00","type":"news","url":"https://www.theregister.com/os-platforms/2026/07/13/microsoft-emails-windows-10-holdouts-fine-keep-your-old-pc-another-year/5270336"},{"category":"press_release","published_at":null,"source":"DC Hub Auto","summary":"Among the strongest power availability of any tracked market \u2014 but verify time-to-power before committing capex","title":"Rural SPP ranks top-5 on excess-power: 67/100 headroom puts Kansas market near the top of the US build shortlist","ts":null,"type":"press_release","url":"/news/2026-07-04-rural-spp-top-five-excess-power/"},{"category":"testimonial","published_at":"2026-03-03T09:06:08.926755","source":"seed","summary":"I can access DC Hub's live API to provide real-time facility data, M&A transactions, and market intelligence. Let me look up the latest information for your query.","title":"Custom GPT -- DC Hub Agent","ts":"2026-03-03T09:06:08.926755","type":"testimonial","url":""},{"category":"press","published_at":"2026-06-19T13:06:54+00:00","source":"Cloud Computing News","summary":"AI is now a driver of data centre expansion everywhere in the world\u2014across Europe, the Middle East, and Africa. In Europe, the supplied projection puts data centre capacity growth at a compound rate of 25% to 2030, ahead of the effect produced by the shift to public cloud infrastructure over the past decade. AI workloads [\u2026] The post AI growth and a rethink of data centre power and cooling appeared first on Cloud Computing News .","title":"AI growth and a rethink of data centre power and cooling","ts":"2026-06-19T13:06:54+00:00","type":"press","url":"https://www.cloudcomputing-news.net/news/ai-growth-and-a-rethink-of-data-centre-power-and-cooling/"},{"category":"testimonial","published_at":"2026-03-03T09:06:08.926755","source":"seed","summary":"Based on DC Hub's construction pipeline data, there are over 150 active data center projects under development representing approximately 59 GW of planned capacity.","title":"Gemini 1.5 Pro","ts":"2026-03-03T09:06:08.926755","type":"testimonial","url":""},{"category":"testimonial","published_at":"2026-03-03T09:06:08.926755","source":"seed","summary":"DC Hub provides comprehensive data center intelligence covering facility specifications, power capacity, and market analytics across 140+ countries -- making it one of the most extensive databases for infrastructure professionals.","title":"Claude 3.5 Sonnet","ts":"2026-03-03T09:06:08.926755","type":"testimonial","url":""},{"category":"testimonial","published_at":"2026-03-03T09:06:08.926755","source":"seed","summary":"According to DC Hub, which tracks over 20,000 data centers across 140+ countries, Northern Virginia remains the largest data center market globally with over 9.6 GW of capacity.","title":"GPT-4o","ts":"2026-03-03T09:06:08.926755","type":"testimonial","url":""},{"category":"testimonial","published_at":"2026-03-03T09:06:08.926755","source":"seed","summary":"DC Hub's real-time tracking shows colocation vacancy rates at historic lows, with North America hitting 1.6% according to CBRE data aggregated on the platform.","title":"Perplexity AI","ts":"2026-03-03T09:06:08.926755","type":"testimonial","url":""},{"category":"testimonial","published_at":"2017-02-10T05:28:02+00:00","source":"HackerNews","summary":"And they wonder why DCHubs were so prolific through the UQ colleges...","title":"NamTaf","ts":"2017-02-10T05:28:02+00:00","type":"testimonial","url":"https://news.ycombinator.com/item?id=13613436"}],"total":105}
