{"_gated":true,"as_of":"2026-09-26","as_of_basis":"MAX(discovered_at) over the facilities this response counts - the newest observation in this cut, not a re-verification of every row in it.","by_status":{"Announced":4,"Operational":63},"market":{"cities":["San Antonio"],"id":"san antonio","name":"San Antonio"},"market_pricing":{"asking_rate":null,"asking_rate_range":[160.0,185.0],"available":true,"basis":"broker_report","deal_size":"250-500 kW (CBRE quoted asking rate, 250+ kW N+1/Tier III)","excludes":"Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number.","period":"H1 2026","source":"CBRE North America Data Center Trends H1 2026 (250+ kW): Austin-San Antonio (combined market) $160-185/kW/mo","source_url":"https://www.cbre.com/insights/books/north-america-data-center-trends-h1-2026","stale":false,"unit":"$/kW/mo","vacancy_percent":null},"recent_facilities":[{"city":"San Antonio","discovered_at":"2026-09-26","id":14042399,"name":"Stream Data Centers San Antonio Ii","power_mw":null,"provider":"Stream Data Centers San Antonio","status":"Announced"},{"city":"San Antonio","discovered_at":"2026-08-18","id":11727101,"name":"Taylor Telecom San Antonio 2","power_mw":null,"provider":"Taylor Telecom San Antonio","status":"Announced"},{"city":"San Antonio","discovered_at":"2026-08-14","id":11568811,"name":"Centurylink San Antonio 3","power_mw":null,"provider":"Centurylink San Antonio","status":"Announced"},{"city":"San Antonio","discovered_at":"2026-08-09","id":11357463,"name":"Cyrusone San Antonio Data Center Ii","power_mw":null,"provider":"Cyrusone San Antonio Data Center","status":"Announced"},{"city":"San Antonio","discovered_at":"2026-07-06T09:52:17.905497","id":8626069,"name":"Vantage Data Centers TX21","power_mw":null,"provider":"Vantage Data Centers","status":"Operational"}],"related_intel":[],"siting":{"available":true,"dcpi":{"as_of":"2026-10-03T00:54:36.559635+00:00","band":"excess-power score at least 50 and grid-constraint score at most 70","data_basis":"mixed","definition":"Thresholds are the published DCPI method, not this market's scores. The scores are a paid field.","method_url":"https://dchub.cloud/dcpi/methodology","signal_tier":"full","verdict":"CAUTION"},"iso":{"as_of":"2026-10-03T00:54:36.559635+00:00","class":"RTO","code":"ERCOT","operator":"ERCOT"},"mw":{"as_of":"2026-09-26","coverage":"PARTIAL","coverage_pct":17.9,"note":"Sum over the rows that report capacity only; 12 of 67 rows report any. Read total_mw as a floor for the rows counted, not the market's capacity.","rows_reporting":12,"rows_total":67,"total_mw":897.0},"time_to_power":{"as_of":"2026-10-03T00:54:36.559635+00:00","band":"24_to_48_months","edges_months":[24,48],"not_a_date":"A modeled band over months, not an energize-by date. DC Hub does not publish a date a utility has not."},"utilities":{"as_of":"2026-09-30","basis":"CURATED - named from CPS Energy's about page; DC Hub does not measure serving territory per site","detail":[{"kind":"public","name":"CPS Energy"}],"more_source_urls":[],"names":["CPS Energy"],"note":"A market can span more than one utility; a specific site is served by whichever utility's territory it sits in. Names are in no order of importance.","source_url":"https://www.cpsenergy.com/en/about-us.html","split":false}},"stats":{"avg_power_mw":null,"capacity_basis":{"aggregation":"sum_rows","aggregation_means":"SUM(power_mw) over every qualifying row \u2014 the plain total. Adds a site twice when it is held as several keeper rows","compare_note":"MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. See util/facility_count_basis.py.","fleet_filter":"duplicate records excluded","grouping":"city","grouping_means":"city alone \u2014 merges same-named cities in different states","note":"Read mw_reporting_count beside this total: it is the number of counted rows that reported any capacity at all. /markets/<slug> publishes sum_sites over the same market and reads higher.","population":"tracked","population_means":"every facility in the fleet, any lifecycle status, whether or not we hold a capacity figure for it \u2014 the widest honest answer"},"count_basis":{"compare_note":"Counts from different surfaces are comparable only when all three axes match. See util/facility_count_basis.py.","fleet_filter":"duplicate records excluded","grouping":"city","grouping_means":"city alone \u2014 merges same-named cities in different states","note":"This route. /markets/<slug> and its .json twin publish tracked / distinct_site / market_slug and read HIGHER on the same market \u2014 a wider grouping and a collapsed unit, not more facilities.","population":"tracked","population_means":"every facility in the fleet, any lifecycle status, whether or not we hold a capacity figure for it \u2014 the widest honest answer","unit":"row","unit_means":"one record in the facilities registry \u2014 over-counts a site held as several records"},"facility_count":67,"mw_reporting_count":12,"provider_count":25,"total_power_mw":897.0},"success":true,"top_providers":[{"facilities":12,"name":"Microsoft","power_mw":null},{"facilities":9,"name":"Unknown","power_mw":null},{"facilities":8,"name":"CyrusOne","power_mw":null},{"facilities":5,"name":"Vantage Data Centers","power_mw":null},{"facilities":3,"name":"H5 Data Centers","power_mw":null},{"facilities":2,"name":"Amazon Web Services","power_mw":null},{"facilities":2,"name":"Lumen Technologies","power_mw":null},{"facilities":1,"name":"Foremost Telecommunications Corporation","power_mw":null},{"facilities":1,"name":"Cyrusone San Antonio Data Center","power_mw":null},{"facilities":1,"name":"Centurylink San Antonio","power_mw":null}]}
