{"_gated":true,"as_of":"2026-08-25","as_of_basis":"MAX(discovered_at) over the facilities this response counts - the newest observation in this cut, not a re-verification of every row in it.","by_status":{"Announced":3,"Operational":31},"market":{"cities":["Nashville"],"id":"nashville","name":"Nashville"},"market_pricing":{"asking_rate":null,"asking_rate_range":[155.0,190.0],"available":true,"basis":"dchub_estimate","deal_size":"250-500 kW (est.)","excludes":"Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number.","period":"2026-H2","source":"DC Hub estimate. Nearest covered market Atlanta (CBRE North America Data Center Trends H1 2026 (250+ kW): $185-200) less the secondary-market discount seen in CBRE H1 2026 ($155-195); TN industrial power ~6.8 c/kWh (EIA via DC Hub).","source_url":null,"stale":false,"unit":"$/kW/mo","vacancy_percent":null},"recent_facilities":[{"city":"Nashville","discovered_at":"2026-08-25","id":12022678,"name":"365 Data Centers Nashville Na1","power_mw":null,"provider":"365 Data Centers Nashville","status":"Announced"},{"city":"Nashville","discovered_at":"2026-08-02","id":11091039,"name":"Centurylink Nashville 3","power_mw":null,"provider":"Centurylink Nashville","status":"Announced"},{"city":"Nashville","discovered_at":"2026-08-02","id":11091040,"name":"Centurylink Nashville 1","power_mw":null,"provider":"Centurylink Nashville","status":"Announced"},{"city":"Nashville","discovered_at":"2026-05-22T19:10:16.653134","id":1563843,"name":"Tennessee South Data Center","power_mw":null,"provider":"State of Tennessee","status":"Operational"},{"city":"Nashville","discovered_at":"2026-03-31T01:12:18.489563","id":21348,"name":"Verizon Wireless","power_mw":null,"provider":"Unknown","status":"Operational"}],"related_intel":[],"siting":{"available":true,"dcpi":{"as_of":"2026-10-02T21:22:25.034566+00:00","band":"did not clear a BUILD or CAUTION band (fallback; includes a market with a missing input)","data_basis":"mixed","definition":"Thresholds are the published DCPI method, not this market's scores. The scores are a paid field.","method_url":"https://dchub.cloud/dcpi/methodology","signal_tier":"partial","verdict":"AVOID"},"iso":{"as_of":"2026-10-02T21:22:25.034566+00:00","class":"BA","code":"TVA","operator":"Tennessee Valley Authority"},"mw":{"as_of":"2026-08-25","coverage":"PARTIAL","coverage_pct":5.9,"note":"Sum over the rows that report capacity only; 2 of 34 rows report any. Read total_mw as a floor for the rows counted, not the market's capacity.","rows_reporting":2,"rows_total":34,"total_mw":112.0},"time_to_power":{"as_of":"2026-10-02T21:22:25.034566+00:00","band":"under_24_months","edges_months":[24,48],"not_a_date":"A modeled band over months, not an energize-by date. DC Hub does not publish a date a utility has not."},"utilities":{"as_of":"2026-09-30","basis":"CURATED - named from Nashville Electric Service's about page; DC Hub does not measure serving territory per site","detail":[{"kind":"public","name":"Nashville Electric Service"}],"more_source_urls":[],"names":["Nashville Electric Service"],"note":"A market can span more than one utility; a specific site is served by whichever utility's territory it sits in. Names are in no order of importance.","source_url":"https://www.nespower.com/about-nes/","split":false}},"stats":{"avg_power_mw":null,"capacity_basis":{"aggregation":"sum_rows","aggregation_means":"SUM(power_mw) over every qualifying row \u2014 the plain total. Adds a site twice when it is held as several keeper rows","compare_note":"MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. See util/facility_count_basis.py.","fleet_filter":"duplicate records excluded","grouping":"city","grouping_means":"city alone \u2014 merges same-named cities in different states","note":"Read mw_reporting_count beside this total: it is the number of counted rows that reported any capacity at all. /markets/<slug> publishes sum_sites over the same market and reads higher.","population":"tracked","population_means":"every facility in the fleet, any lifecycle status, whether or not we hold a capacity figure for it \u2014 the widest honest answer"},"count_basis":{"compare_note":"Counts from different surfaces are comparable only when all three axes match. See util/facility_count_basis.py.","fleet_filter":"duplicate records excluded","grouping":"city","grouping_means":"city alone \u2014 merges same-named cities in different states","note":"This route. /markets/<slug> and its .json twin publish tracked / distinct_site / market_slug and read HIGHER on the same market \u2014 a wider grouping and a collapsed unit, not more facilities.","population":"tracked","population_means":"every facility in the fleet, any lifecycle status, whether or not we hold a capacity figure for it \u2014 the widest honest answer","unit":"row","unit_means":"one record in the facilities registry \u2014 over-counts a site held as several records"},"facility_count":34,"mw_reporting_count":2,"provider_count":19,"total_power_mw":112.0},"success":true,"top_providers":[{"facilities":5,"name":"Flexential","power_mw":null},{"facilities":5,"name":"Unknown","power_mw":null},{"facilities":2,"name":"365 Data Centers","power_mw":null},{"facilities":2,"name":"Centurylink Nashville","power_mw":null},{"facilities":2,"name":"H5 Data Centers","power_mw":null},{"facilities":2,"name":"Lumen Technologies","power_mw":null},{"facilities":2,"name":"Lumen Technologies Inc","power_mw":null},{"facilities":2,"name":"Meta","power_mw":null},{"facilities":1,"name":"IRIS","power_mw":null},{"facilities":1,"name":"365 Data Centers Nashville","power_mw":null}]}
