{"_gated":true,"as_of":"2026-09-10","as_of_basis":"MAX(discovered_at) over the facilities this response counts - the newest observation in this cut, not a re-verification of every row in it.","by_status":{"Announced":34,"Operational":85,"Planned":1},"market":{"cities":["Frankfurt"],"id":"frankfurt-de","name":"Frankfurt"},"market_pricing":{"asking_rate":null,"asking_rate_range":[235.0,265.0],"available":true,"basis":"broker_report","deal_size":"250-500 kW (CBRE quoted asking rate, 250+ kW N+1/Tier III)","excludes":"Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number.","period":"Q1 2026","source":"CBRE Global Data Center Trends 2026 (250-500 kW, Q1 2026): Frankfurt $235-265/kW/mo","source_url":"https://www.cbre.com/insights/reports/global-data-center-trends-2026","stale":false,"unit":"$/kW/mo","vacancy_percent":4.0},"recent_facilities":[{"city":"Frankfurt","discovered_at":"2026-09-10","id":13118587,"name":"Digital Realty Digital Park Sossenheim Fra29","power_mw":null,"provider":"Digital Realty Digital Park Sossenheim","status":"Announced"},{"city":"Frankfurt","discovered_at":"2026-09-09","id":13048799,"name":"Interxion A Digital Realty Company Digital Park Sossenheim Fra 31","power_mw":null,"provider":"Interxion A Digital Realty Company Digital Park Sossenheim Fra","status":"Announced"},{"city":"Frankfurt","discovered_at":"2026-09-09","id":13048800,"name":"Interxion A Digital Realty Company Digital Park Sossenheim Fra 32","power_mw":null,"provider":"Interxion A Digital Realty Company Digital Park Sossenheim Fra","status":"Announced"},{"city":"Frankfurt","discovered_at":"2026-09-01","id":12461915,"name":"Cyrusone Frankfurt Ii","power_mw":null,"provider":"Cyrusone Frankfurt","status":"Announced"},{"city":"Frankfurt","discovered_at":"2026-09-01","id":12461949,"name":"Cyrusone Frankfurt Iii","power_mw":null,"provider":"Cyrusone Frankfurt","status":"Announced"}],"related_intel":[],"siting":{"available":true,"dcpi":{"as_of":"2026-10-02T21:18:31.631725+00:00","band":"did not clear a BUILD or CAUTION band (fallback; includes a market with a missing input)","data_basis":"modeled_estimate","definition":"Thresholds are the published DCPI method, not this market's scores. The scores are a paid field.","method_url":"https://dchub.cloud/dcpi/methodology","signal_tier":"low","verdict":"AVOID"},"iso":{"as_of":"2026-10-02T21:18:31.631725+00:00","class":null,"code":"ENTSOE-DE","operator":"ENTSO-E Transparency Platform (Germany)"},"mw":{"as_of":"2026-09-10","coverage":"PARTIAL","coverage_pct":15.0,"note":"Sum over the rows that report capacity only; 18 of 120 rows report any. Read total_mw as a floor for the rows counted, not the market's capacity.","rows_reporting":18,"rows_total":120,"total_mw":1473.0},"time_to_power":{"as_of":"2026-10-02T21:18:31.631725+00:00","band":"over_48_months","edges_months":[24,48],"not_a_date":"A modeled band over months, not an energize-by date. DC Hub does not publish a date a utility has not."},"utilities":{"as_of":null,"basis":"UNMEASURED - no market-to-serving-utility mapping is published for this market. iso.operator is the grid operator, not the retail utility.","names":null}},"stats":{"avg_power_mw":null,"capacity_basis":{"aggregation":"sum_rows","aggregation_means":"SUM(power_mw) over every qualifying row \u2014 the plain total. Adds a site twice when it is held as several keeper rows","compare_note":"MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. See util/facility_count_basis.py.","fleet_filter":"duplicate records excluded","grouping":"city","grouping_means":"city alone \u2014 merges same-named cities in different states","note":"Read mw_reporting_count beside this total: it is the number of counted rows that reported any capacity at all. /markets/<slug> publishes sum_sites over the same market and reads higher.","population":"tracked","population_means":"every facility in the fleet, any lifecycle status, whether or not we hold a capacity figure for it \u2014 the widest honest answer"},"count_basis":{"compare_note":"Counts from different surfaces are comparable only when all three axes match. See util/facility_count_basis.py.","fleet_filter":"duplicate records excluded","grouping":"city","grouping_means":"city alone \u2014 merges same-named cities in different states","note":"This route. /markets/<slug> and its .json twin publish tracked / distinct_site / market_slug and read HIGHER on the same market \u2014 a wider grouping and a collapsed unit, not more facilities.","population":"tracked","population_means":"every facility in the fleet, any lifecycle status, whether or not we hold a capacity figure for it \u2014 the widest honest answer","unit":"row","unit_means":"one record in the facilities registry \u2014 over-counts a site held as several records"},"facility_count":120,"mw_reporting_count":18,"provider_count":66,"total_power_mw":1473.0},"success":true,"top_providers":[{"facilities":13,"name":"Equinix","power_mw":null},{"facilities":7,"name":"Interxion Fra","power_mw":null},{"facilities":6,"name":"Equinix, Inc.","power_mw":null},{"facilities":6,"name":"Digital Realty","power_mw":null},{"facilities":4,"name":"NTT","power_mw":null},{"facilities":4,"name":"CyrusOne Inc.","power_mw":null},{"facilities":3,"name":"Interxion","power_mw":null},{"facilities":3,"name":"Colt Technology Services Frankfurt","power_mw":null},{"facilities":3,"name":"Amazon Web Services","power_mw":null},{"facilities":3,"name":"Vantage Data Centers","power_mw":null}]}
