{"generated_at": "2026-11-07T09:35:58.601044+00:00", "key_stats": {"computed": "2026-11-07T08:48:56.600186+00:00", "constraint": null, "dcpi_score": 18.5, "excess": null, "facility_count": 23, "mw_reporting_count": 0, "name": "Washington, DC", "recent_deals": [], "slug": "dc", "state": "DC", "top_operators": [{"count": 2, "name": "Equinix"}, {"count": 2, "name": "CoreSite"}, {"count": 1, "name": "Cogent Communications Herndon"}, {"count": 1, "name": "Cogent Communications Washington"}, {"count": 1, "name": "Cogent Communications Vienna"}], "total_mw": 0.0, "verdict": "AVOID"}, "model": "claude-haiku-4-5", "name": "Washington, DC", "narrative_md": "# Washington, DC Data Center Market Brief\n\nWashington, DC's tracked data center market encompasses 23 facilities operated by a fragmented roster led by Equinix (2 sites), CoreSite (2 sites), and three Cogent Communications locations spanning Herndon, Washington, and Vienna. The market shows minimal recent transaction activity, with no deals tracked in the registry during the current measurement period. Operator concentration remains low, with no single player commanding dominant supply control.\n\nThe DCPI verdict of AVOID reflects structural headwinds on the power supply side. Together, these scores suggest that operators planning greenfield builds or significant expansions should expect material delays and higher costs to secure adequate supply.\n\nEquinix and CoreSite maintain the operational footprint, each running two facilities, while Cogent Communications operates three regional nodes. No recent deals have been tracked, and the absence of M&A or lease transactions in the current window stands in contrast to sector-wide activity surge documented elsewhere.", "slug": "dc", "word_count": 265, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail come with full DC Hub access: https://dchub.cloud/pricing."}