{"comps":{"land":[],"powered_shell":[]},"hero":{"composite_score":null,"computed_at":"2026-10-27T08:30:26.868683+00:00","constraint_score":50.2,"excess_power":51.4,"iso":"WECC","lat":47.24,"lng":-119.83,"name":"Quincy","queue_wait_months":null,"slug":"quincy","state":"WA","time_to_power_mo":19.7,"time_to_power_months":19.7,"verdict":"CAUTION"},"is_pro":true,"kpis":{"facility_count":81,"headline_basis":"every facility listing DC Hub tracks in this market (operational, under construction, planned and announced; verified and unverified listings included), deduplicated by name + operator across the facilities and discovered_facilities tables. MW is summed over the listings that report capacity (mw_reporting_count of facility_count), so read it as a floor.","lease_rate":null,"mw_reporting_count":14,"operational_mw":1552.0,"pipeline_mw":0.0,"queue_months":null,"top_operator":{"facility_count":7,"name":"Vantage Data Centers"},"total_mw":1507.0,"unverified_included":true,"vacancy_pct":null},"live_as_of":{"age_hours":0.2,"iso":"2026-10-27T08:30:26.868683+00:00"},"ma":[],"ok":true,"open_access":"Open to every caller: this is one of the 20 largest US data-center markets by tracked capacity, and its full market briefing (grid, risk, time to power, scores) is free.","operators":[{"facility_count":7,"operator":"Vantage Data Centers","ranked_by":"facility_count","total_mw":105.0},{"facility_count":6,"operator":"Microsoft","ranked_by":"facility_count","total_mw":850.0},{"facility_count":4,"operator":"H5 Data Centers","ranked_by":"facility_count","total_mw":116.0},{"facility_count":3,"operator":"Vantage","ranked_by":"facility_count","total_mw":105.0},{"facility_count":3,"operator":"Sabey Data Centers","ranked_by":"facility_count","total_mw":80.0}],"outlook":{"generated_at":"2026-10-26T09:27:05.265617+00:00","narrative_md":"Quincy's data center footprint spans 81 tracked facilities totaling 1,507 MW across operational, under-construction, and planned assets. The market is dominated by three operators\u2014Vantage Data Centers (7 facilities), Microsoft (6), and H5 Data Centers (4)\u2014suggesting consolidation around hyperscale and institutional players. Despite this scale, the market has recorded no recent deal activity, indicating a period of operational focus rather than transactional momentum.\n\nThe CAUTION verdict reflects genuine structural tension: excess-power availability scores 51/100 while infrastructure constraint registers 50/100, placing Quincy in a precarious equilibrium. For acquisition-focused investors, this dual signal suggests proceeding with deliberate diligence. Abundant power capacity alone does not guarantee attractive entry economics if grid, cooling, or real estate constraints limit deployment velocity. Conversely, the lack of critical power scarcity removes the urgency premium that attracts speculative capital. Buyers should expect competitive pricing on available assets without the discount floor that severe constraints typically impose.\n\nOperator concentration around Vantage and Microsoft reflects their capital depth and technical requirements rather than Quincy's inherent competitive advantage. Microsoft's six-facility presence signals sustained demand for proprietary AI and cloud infrastructure, but does not necessarily translate to third-party acquisition opportunities. Vantage's larger footprint suggests active site control, yet the absence of recent deal announcements indicates either saturation of their acquisition targets or a pause in expansion. H5's four-facility position indicates regional presence but limited scale to dominate pricing or lease negotiations. The silence on deal flow is telling: no announced transactions mean capital is either moving to higher-constraint or lower-risk markets, or existing operators are maximizing utilization of current portfolios before pursuing growth.\n\nQuincy's path forward depends on whether operators can monetize excess power through expanded customer acquisition or whether the constraint score signals emerging infrastructure bottlenecks that will tighten margins on new deployments. Investors should monitor Vantage and Microsoft's capital allocation patterns closely, as their next moves will likely determine whether Quincy transitions from caution to attraction or deepens into a secondary-tier market.","rationale":null,"verdict":"CAUTION","word_count":321},"pipeline":[],"power_grid":{"gen_additions_mw":850.0,"interconnection_pending_mw":null,"iso":"WECC","iso_queue":null,"queue_capacity_mw":null,"queue_wait_months":null,"reserve_margin_pct":20.0,"time_to_power_as_of":"2026-10-27T08:30:26.868683+00:00","time_to_power_basis":"DCPI modelled months to energize a new large load in this market (method: https://dchub.cloud/dcpi/methodology); a model estimate, not a utility date","time_to_power_months":19.7},"redirect_to":null,"requested":"quincy","risk":{"drought_months_d2_plus":null,"errors":{"drought_months_d2_plus":"no_drought_source_ingested"},"water_band":1,"water_band_label":"Low","water_category":"mean of 115 Aqueduct 4.0 baseline-annual basins (arid counted as","water_stress":11.1,"wildfire_seismic_note":"WUI wildfire exposure + Pacific seismic zones; check CalOES + USGS hazard layers before final site selection."},"slug":"quincy","tier":"FREE"}
