{"comps":{"land":[],"powered_shell":[]},"hero":{"composite_score":null,"computed_at":"2026-10-27T05:00:32.040301+00:00","constraint_score":43.0,"excess_power":65.3,"iso":"WECC","lat":33.35,"lng":-111.68,"name":"Mesa","queue_wait_months":null,"slug":"mesa","state":"AZ","time_to_power_mo":14.8,"time_to_power_months":14.8,"verdict":"BUILD"},"is_pro":true,"kpis":{"facility_count":53,"headline_basis":"every facility listing DC Hub tracks in this market (operational, under construction, planned and announced; verified and unverified listings included), deduplicated by name + operator across the facilities and discovered_facilities tables. MW is summed over the listings that report capacity (mw_reporting_count of facility_count), so read it as a floor.","lease_rate":null,"mw_reporting_count":16,"operational_mw":1675.0,"pipeline_mw":370.0,"queue_months":null,"top_operator":{"facility_count":4,"name":"EdgeCore Digital Infrastructure"},"total_mw":1425.0,"unverified_included":true,"vacancy_pct":null},"live_as_of":{"age_hours":0.9,"iso":"2026-10-27T05:00:32.040301+00:00"},"ma":[{"buyer":"EdgeCore Digital","date":"2025-01-01","mw":500.0,"seller":"Debt Financing","type":"ma","value":1900.0,"value_unit":"USD millions"}],"ok":true,"open_access":"Open to every caller: this is one of the 20 largest US data-center markets by tracked capacity, and its full market briefing (grid, risk, time to power, scores) is free.","operators":[{"facility_count":4,"operator":"EdgeCore Digital Infrastructure","ranked_by":"facility_count","total_mw":344.0},{"facility_count":4,"operator":"EdgeCore","ranked_by":"facility_count","total_mw":215.0},{"facility_count":3,"operator":"Meta","ranked_by":"facility_count","total_mw":280.0},{"facility_count":2,"operator":"Google","ranked_by":"facility_count","total_mw":200.0},{"facility_count":2,"operator":"Novva Data Centers","ranked_by":"facility_count","total_mw":96.0}],"outlook":{"generated_at":"2026-10-26T09:17:03.636662+00:00","narrative_md":"Mesa's data center footprint comprises 53 tracked facilities representing 1,425 MW across operational, under-construction, and planned assets. The market remains fragmented, with EdgeCore Digital Infrastructure and EdgeCore each operating four facilities and Meta holding three sites. No recent acquisitions or sales have been recorded in Mesa, distinguishing it from broader regional momentum observed in adjacent Arizona markets.\n\nThe DCPI verdict to BUILD reflects a structural imbalance favoring supply-side investment. Mesa scores 65/100 on excess power availability, indicating substantial headroom for incremental load without grid strain, while constraint scoring at 43/100 signals moderate but manageable limits on transmission and interconnection. For greenfield developers and build-to-suit operators, this profile argues for capital deployment: the market has both the electrical capacity to support new construction and sufficient constraint friction to deter oversupply. Acquisition-focused investors, however, face a different calculus: existing operators control modest portfolios, and the absence of recent deal flow suggests limited secondary market liquidity at scale.\n\nOperator fragmentation in Mesa contrasts with concentration observed in mature markets like Phoenix, where three operators dominate thousands of megawatts. EdgeCore's dual-entity presence (four facilities under EdgeCore Digital Infrastructure, four under EdgeCore) hints at corporate restructuring or subsidiary management but does not alter the underlying atomization of the market. Meta's three-site footprint likely reflects direct-to-cloud procurement rather than third-party capacity plays. The lack of tracked M&A activity over the recent period suggests either that existing operators are capacity-constrained and retain assets for captive use, or that buyer interest has not yet materialized at scale. Regional context matters: Meta and BlackRock's $14 billion data center joint venture announcement for El Paso, Texas, and broader institutional interest in Texas markets, may be drawing capital away from Arizona markets including Mesa.\n\nMesa's BUILD verdict positions it as a development-stage market primed for entrant operators willing to construct rather than acquire, though sustained investor interest will depend on whether regional cloud and AI workload migration patterns establish Mesa as a viable alternative to more saturated Arizona nodes.","rationale":null,"verdict":"BUILD","word_count":328},"pipeline":[{"eta":null,"facility":"Novva Project Borealis Phase 1","operator":"Novva Data Centers","power_mw":96.0,"status":"Under Construction"},{"eta":null,"facility":"EdgeCore Mesa Campus PH02","operator":"EdgeCore Digital Infrastructure","power_mw":72.0,"status":"Under Construction"},{"eta":null,"facility":"EdgeCore Mesa Campus PH03","operator":"EdgeCore Digital Infrastructure","power_mw":72.0,"status":"Under Construction"},{"eta":null,"facility":"Google Mesa Building 3","operator":"Google","power_mw":50.0,"status":"Under Construction"},{"eta":null,"facility":"Meta Mesa Building 5","operator":"Meta","power_mw":40.0,"status":"Under Construction"},{"eta":null,"facility":"Meta Mesa Building 4","operator":"Meta","power_mw":40.0,"status":"Under Construction"},{"eta":null,"facility":"Arcadian Infracom Phoenix PoP","operator":"Arcadian Infracom","power_mw":null,"status":"Under Construction"},{"eta":null,"facility":"Novva Mesa Campus","operator":"Novva Data Centers","power_mw":null,"status":"Under Construction"}],"power_grid":{"gen_additions_mw":3840.6,"interconnection_pending_mw":null,"iso":"WECC","iso_queue":null,"queue_capacity_mw":13740.0,"queue_wait_months":null,"reserve_margin_pct":20.0,"time_to_power_as_of":"2026-10-27T05:00:32.040301+00:00","time_to_power_basis":"DCPI modelled months to energize a new large load in this market (method: https://dchub.cloud/dcpi/methodology); a model estimate, not a utility date","time_to_power_months":14.8},"redirect_to":null,"requested":"mesa","risk":{"drought_months_d2_plus":null,"errors":{"drought_months_d2_plus":"no_drought_source_ingested"},"water_band":4,"water_band_label":"High","water_category":"mean of 110 Aqueduct 4.0 baseline-annual basins (arid counted as","water_stress":71.8,"wildfire_seismic_note":null},"slug":"mesa","tier":"FREE"}
