{"comps":{"land":[],"powered_shell":[]},"hero":{"composite_score":null,"computed_at":"2026-10-27T08:30:42.526955+00:00","constraint_score":43.1,"excess_power":53.4,"iso":"WECC","lat":36.09,"lng":-115.14,"name":"Las Vegas","queue_wait_months":null,"slug":"las-vegas","state":"NV","time_to_power_mo":15.3,"time_to_power_months":15.3,"verdict":"CAUTION"},"is_pro":true,"kpis":{"facility_count":77,"headline_basis":"every facility listing DC Hub tracks in this market (operational, under construction, planned and announced; verified and unverified listings included), deduplicated by name + operator across the facilities and discovered_facilities tables. MW is summed over the listings that report capacity (mw_reporting_count of facility_count), so read it as a floor.","lease_rate":null,"mw_reporting_count":9,"operational_mw":1890.0,"pipeline_mw":150.0,"queue_months":null,"top_operator":{"facility_count":16,"name":"Switch"},"total_mw":1840.0,"unverified_included":true,"vacancy_pct":null},"live_as_of":{"age_hours":0.2,"iso":"2026-10-27T08:30:42.526955+00:00"},"ma":[{"buyer":"DigitalBridge/IFM Investors","date":"2025-01-01","mw":1200.0,"seller":"Switch Inc","type":"ma","value":11000.0,"value_unit":"USD millions"}],"ok":true,"open_access":"Open to every caller: this is one of the 20 largest US data-center markets by tracked capacity, and its full market briefing (grid, risk, time to power, scores) is free.","operators":[{"facility_count":16,"operator":"Switch","ranked_by":"facility_count","total_mw":1660.0},{"facility_count":6,"operator":"Flexential","ranked_by":"facility_count","total_mw":0.0},{"facility_count":3,"operator":"Flexential Corp.","ranked_by":"facility_count","total_mw":0.0},{"facility_count":3,"operator":"DataBank","ranked_by":"facility_count","total_mw":0.0},{"facility_count":2,"operator":"Novva Data Centers","ranked_by":"facility_count","total_mw":100.0}],"outlook":{"generated_at":"2026-10-26T09:06:25.778904+00:00","narrative_md":"Las Vegas operates 77 tracked data center facilities totaling 1,840 MW, with Switch commanding the largest single-operator footprint at 16 sites. The market's power profile shows moderate excess capacity (53/100) but meaningful constraint risk (43/100), reflecting tightening utility infrastructure despite nominal availability. Recent market signals indicate continued operator interest\u2014Switch has publicly signaled expansion plans within the Las Vegas Valley\u2014yet the deal pipeline remains subdued, with no announced investment commitments in the current tracking window.\n\nThe CAUTION verdict reflects a market in transition. Excess-power score of 53/100 positions Las Vegas above genuinely constrained markets like London (16/100) or Vienna (27/100), but the constraint score of 43/100 is substantive enough to warrant scrutiny from acquisition-focused buyers. This combination suggests that while power exists, its distribution, pricing, and availability may be fragmented or time-gated. Operators entering now face moderate execution risk; existing capacity holders retain negotiating leverage as demand pressure builds. The verdict favors strategic capital with multi-year deployment horizons over financial buyers seeking immediate arbitrage.\n\nThe operator landscape remains concentrated but fragmented below the tier-one level. Switch's 16-site dominance is followed by two Flexential entities (6 and 3 sites respectively) and DataBank with 3 sites, a structure that creates both efficiency for tier-one operators and opportunity for consolidation plays among the mid-tier. The absence of announced investment commits in the current period\u2014despite Switch's public construction interest\u2014suggests either deal negotiations occurring outside formal announcement windows or capital waiting for clearer power-access terms from Clark County utilities. This silence is notable: it differs sharply from peer markets where strategic or financial sponsors actively bid for operator portfolios or greenfield development rights.\n\nForward positioning depends on utility infrastructure timelines; Las Vegas's competitive advantage hinges on sustained power cost advantages relative to coastal markets and the ability to convert regional demand (particularly from AI training workloads migrating inland) into committed capacity purchases.","rationale":null,"verdict":"CAUTION","word_count":306},"pipeline":[{"eta":null,"facility":"Novva North Las Vegas (Apex)","operator":"Novva Data Centers","power_mw":100.0,"status":"Under Construction"},{"eta":null,"facility":"Jet.AI & CCE JV Clark County","operator":"Jet.AI / CCE","power_mw":50.0,"status":"Planned"},{"eta":null,"facility":"Arcadian Infracom Las Vegas PoP","operator":"Arcadian Infracom","power_mw":null,"status":"Under Construction"}],"power_grid":{"gen_additions_mw":741.5,"interconnection_pending_mw":null,"iso":"WECC","iso_queue":null,"queue_capacity_mw":16392.2,"queue_wait_months":null,"reserve_margin_pct":20.0,"time_to_power_as_of":"2026-10-27T08:30:42.526955+00:00","time_to_power_basis":"DCPI modelled months to energize a new large load in this market (method: https://dchub.cloud/dcpi/methodology); a model estimate, not a utility date","time_to_power_months":15.3},"redirect_to":null,"requested":"las-vegas","risk":{"drought_months_d2_plus":null,"errors":{"drought_months_d2_plus":"no_drought_source_ingested"},"water_band":4,"water_band_label":"High","water_category":"mean of 90 Aqueduct 4.0 baseline-annual basins (arid counted as ","water_stress":78.6,"wildfire_seismic_note":"WUI wildfire exposure + Pacific seismic zones; check CalOES + USGS hazard layers before final site selection."},"slug":"las-vegas","tier":"FREE"}
