{"comps":{"land":[],"powered_shell":[]},"hero":{"composite_score":null,"computed_at":"2026-10-27T08:34:34.448261+00:00","constraint_score":null,"excess_power":null,"iso":"TNB","lat":1.49,"lng":103.74,"locked":true,"name":"Johor","queue_wait_months":null,"slug":"johor","state":"MY","time_to_power_mo":10.8,"time_to_power_months":null,"verdict":"AVOID"},"is_pro":false,"kpis":{"facility_count":12,"headline_basis":"every facility listing DC Hub tracks in this market (operational, under construction, planned and announced; verified and unverified listings included), deduplicated by name + operator across the facilities and discovered_facilities tables. MW is summed over the listings that report capacity (mw_reporting_count of facility_count), so read it as a floor.","lease_rate":null,"mw_reporting_count":5,"operational_mw":0.0,"pipeline_mw":50.0,"queue_months":null,"top_operator":{"facility_count":2,"name":"Bridge Data Centres"},"total_mw":495.0,"unverified_included":true,"vacancy_pct":null},"live_as_of":{"age_hours":0.1,"iso":"2026-10-27T08:34:34.448261+00:00"},"ma":[],"ok":true,"operators":[],"outlook":{"_gated":true,"_is_stub":false,"generated_at":"2026-10-25T09:30:51.699609+00:00","narrative_md":"**12-month outlook: AVOID.** The numeric DCPI scores and the full Claude-written deep-dive for Johor are available to DC Hub Pro (dchub.cloud/pricing) \u2014 or to AI agents via the DC Hub MCP.","rationale":"DCPI scores + deep-dive are DC Hub Pro.","verdict":"AVOID","word_count":281},"paywall":{"blurb":"Power & Grid, Pipeline, Operator footprint, M&A, Comps, and Risk are unlocked with the DC Hub plan with every tool, all markets.","checkout_url":"/pricing?utm_source=market_brief","required_tier":"PRO"},"pipeline":[],"power_grid":null,"redirect_to":null,"requested":"johor","risk":null,"slug":"johor","tier":"FREE"}
