{"comps":{"land":[],"powered_shell":[]},"hero":{"composite_score":null,"computed_at":"2026-10-27T08:30:31.596786+00:00","constraint_score":49.9,"excess_power":50.7,"iso":"WECC","lat":45.55,"lng":-122.93,"name":"Hillsboro","queue_wait_months":null,"slug":"hillsboro","state":"OR","time_to_power_mo":19.6,"time_to_power_months":19.6,"verdict":"CAUTION"},"is_pro":true,"kpis":{"facility_count":109,"headline_basis":"every facility listing DC Hub tracks in this market (operational, under construction, planned and announced; verified and unverified listings included), deduplicated by name + operator across the facilities and discovered_facilities tables. MW is summed over the listings that report capacity (mw_reporting_count of facility_count), so read it as a floor.","lease_rate":null,"mw_reporting_count":9,"operational_mw":250.0,"pipeline_mw":0.0,"queue_months":null,"top_operator":{"facility_count":12,"name":"Flexential"},"total_mw":450.0,"unverified_included":true,"vacancy_pct":null},"live_as_of":{"age_hours":0.1,"iso":"2026-10-27T08:30:31.596786+00:00"},"ma":[],"ok":true,"open_access":"Open to every caller: this is one of the 20 largest US data-center markets by tracked capacity, and its full market briefing (grid, risk, time to power, scores) is free.","operators":[{"facility_count":12,"operator":"Flexential","ranked_by":"facility_count","total_mw":25.0},{"facility_count":10,"operator":"Quality Technology Services","ranked_by":"facility_count","total_mw":0.0},{"facility_count":8,"operator":"Stack Infrastructure","ranked_by":"facility_count","total_mw":60.0},{"facility_count":5,"operator":"Stack","ranked_by":"facility_count","total_mw":80.0},{"facility_count":5,"operator":"EdgeConneX","ranked_by":"facility_count","total_mw":0.0}],"outlook":{"generated_at":"2026-10-26T05:36:28.990928+00:00","narrative_md":"# Hillsboro Data Center Market Analysis\n\nHillsboro's data center footprint totals 450 MW across 109 tracked facilities, reflecting a mature but fragmented supply base dominated by mid-tier operators. Flexential leads with 12 facilities, followed by Quality Technology Services (10), Stack Infrastructure (8), and co-anchors Digital Realty and EdgeConneX (5 each). The operator landscape shows no clear monopoly\u2014the top five collectively manage fewer than half of all tracked sites\u2014indicating competitive market dynamics typical of established tech hubs competing for regional workload.\n\nThe DCPI verdict of excess-power 50/100 paired with constraint 49/100 signals equilibrium bordering on tightness, warranting caution for capacity-focused buyers. An excess-power score at the midpoint suggests available MW exists but lacks the buffer characteristic of undersupplied markets; simultaneously, a constraint score nearly equal suggests infrastructure limitations (power delivery, cooling, floor space, or interconnect diversity) are nearly as pronounced as supply advantages. Investors betting on rapid lease-up or rate expansion should account for potential latency in both power procurement and tenant placement. For operators, this DCPI profile indicates limited pricing upside from scarcity but stable occupancy risks\u2014a defensive rather than opportunistic environment.\n\nDeal flow into Hillsboro has stalled, with no tracked M&A activity in recent windows. This dormancy mirrors patterns observed in similarly mature markets like Milpitas, where saturation and infrastructure constraints dampen institutional capital appetite despite healthy base load. The operator base's fragmentation\u2014with no single player commanding >3% of tracked MW\u2014may itself suppress large-ticket consolidation; the absence of natural acquisition targets or white-space deployment opportunities discourages fund deployment. Flexential's plurality (12 facilities) reflects organic growth or serial bolt-ons rather than a transformational play, and no recent announcements suggest incoming capital or strategic repositioning among the top five.\n\nForward momentum depends on whether power and interconnect constraints can be relieved at competitive cost; absent major infrastructure upgrades or anchor tenant commitments, Hillsboro is likely to remain a steady-state market for incremental optimization rather than transformational growth.","rationale":null,"verdict":"CAUTION","word_count":316},"pipeline":[],"power_grid":{"gen_additions_mw":62.6,"interconnection_pending_mw":null,"iso":"WECC","iso_queue":null,"queue_capacity_mw":null,"queue_wait_months":null,"reserve_margin_pct":20.0,"time_to_power_as_of":"2026-10-27T08:30:31.596786+00:00","time_to_power_basis":"DCPI modelled months to energize a new large load in this market (method: https://dchub.cloud/dcpi/methodology); a model estimate, not a utility date","time_to_power_months":19.6},"redirect_to":null,"requested":"hillsboro","risk":{"drought_months_d2_plus":null,"errors":{"drought_months_d2_plus":"no_drought_source_ingested"},"water_band":3,"water_band_label":"Medium-High","water_category":"mean of 105 Aqueduct 4.0 baseline-annual basins (arid counted as","water_stress":42.4,"wildfire_seismic_note":"WUI wildfire exposure + Pacific seismic zones; check CalOES + USGS hazard layers before final site selection."},"slug":"hillsboro","tier":"FREE"}
