{"comps":{"land":[],"powered_shell":[]},"hero":{"composite_score":null,"computed_at":"2026-10-27T05:01:09.888574+00:00","constraint_score":38.0,"excess_power":65.9,"iso":"WECC","lat":33.42,"lng":-112.36,"name":"Goodyear","queue_wait_months":null,"slug":"goodyear","state":"AZ","time_to_power_mo":14.0,"time_to_power_months":14.0,"verdict":"BUILD"},"is_pro":true,"kpis":{"facility_count":25,"headline_basis":"every facility listing DC Hub tracks in this market (operational, under construction, planned and announced; verified and unverified listings included), deduplicated by name + operator across the facilities and discovered_facilities tables. MW is summed over the listings that report capacity (mw_reporting_count of facility_count), so read it as a floor.","lease_rate":null,"mw_reporting_count":12,"operational_mw":1799.0,"pipeline_mw":308.0,"queue_months":null,"top_operator":{"facility_count":7,"name":"Microsoft"},"total_mw":1260.0,"unverified_included":true,"vacancy_pct":null},"live_as_of":{"age_hours":0.8,"iso":"2026-10-27T05:01:09.888574+00:00"},"ma":[],"ok":true,"open_access":"Open to every caller: this is one of the 20 largest US data-center markets by tracked capacity, and its full market briefing (grid, risk, time to power, scores) is free.","operators":[{"facility_count":7,"operator":"Microsoft","ranked_by":"facility_count","total_mw":150.0},{"facility_count":6,"operator":"Vantage","ranked_by":"facility_count","total_mw":449.0},{"facility_count":5,"operator":"Vantage Data Centers","ranked_by":"facility_count","total_mw":449.0},{"facility_count":1,"operator":"Compass Datacenters","ranked_by":"facility_count","total_mw":212.0},{"facility_count":1,"operator":"Compass","ranked_by":"facility_count","total_mw":0.0}],"outlook":{"generated_at":"2026-10-25T09:52:11.078916+00:00","narrative_md":"Goodyear's data center footprint spans 25 tracked facilities totaling 1,260 MW across operational, under-construction, and planned assets. Microsoft operates the largest cluster with seven facilities, while Vantage and Vantage Data Centers combined control eleven sites. The market's power availability metrics\u2014an excess-power score of 65/100 against a constraint score of 38/100\u2014reflect a region with meaningful spare generation capacity relative to current demand, positioning it favorably for near-term expansion.\n\nThe BUILD verdict signals that acquisition-focused investors should prioritize Goodyear for greenfield and brownfield development opportunities. The excess-power score of 65/100 indicates sufficient grid headroom to support new facility buildouts without immediate utility infrastructure delays, a critical advantage over constrained markets like Atlanta (constraint: 59/100) or Troy (excess-power: 38/100). Constraint at 38/100 remains moderate rather than severe, meaning while some localized transmission or distribution bottlenecks may exist, they are not prohibitive to capital deployment. For operators planning five- to seven-year development cycles, Goodyear offers the rare combination of available power and reasonable construction timelines.\n\nDeal flow into Goodyear has stalled; no recent transactions have been tracked. This absence reflects neither market weakness nor operator disinterest but rather a consolidation phase. Microsoft's seven-facility foothold and Vantage's dual presence (six under one entity, five under another, suggesting potential corporate reorganization or subsidiary structures) indicate that major operators have already staked claims. The lack of acquisition activity paradoxically strengthens the BUILD case: existing operators are expanding organically rather than racing to acquire distressed or available sites, suggesting confidence in organic growth rather than panic-driven M&A typical of tightening markets. For capital allocators, this creates an opening\u2014established operators are unlikely to aggressively bid against new entrants for development rights when their own pipelines remain robust.\n\nGoodyear's trajectory depends on whether its power surplus can sustain the 1,260 MW baseline while accommodating the next generation of AI and hyperscaler demand; early-stage development activity should clarify whether the BUILD verdict will convert to actual site announcements within the next 18 months.","rationale":null,"verdict":"BUILD","word_count":322},"pipeline":[{"eta":null,"facility":"Compass Goodyear Campus (Phoenix)","operator":"Compass Datacenters","power_mw":212.0,"status":"Under Construction"},{"eta":null,"facility":"Novva Project Borealis Phase 1","operator":"Novva Data Centers","power_mw":96.0,"status":"Under Construction"},{"eta":null,"facility":"Arcadian Infracom Phoenix PoP","operator":"Arcadian Infracom","power_mw":null,"status":"Under Construction"}],"power_grid":{"gen_additions_mw":3840.6,"interconnection_pending_mw":null,"iso":"WECC","iso_queue":null,"queue_capacity_mw":13740.0,"queue_wait_months":null,"reserve_margin_pct":20.0,"time_to_power_as_of":"2026-10-27T05:01:09.888574+00:00","time_to_power_basis":"DCPI modelled months to energize a new large load in this market (method: https://dchub.cloud/dcpi/methodology); a model estimate, not a utility date","time_to_power_months":14.0},"redirect_to":null,"requested":"goodyear","risk":{"drought_months_d2_plus":null,"errors":{"drought_months_d2_plus":"no_drought_source_ingested"},"water_band":4,"water_band_label":"High","water_category":"mean of 110 Aqueduct 4.0 baseline-annual basins (arid counted as","water_stress":71.8,"wildfire_seismic_note":null},"slug":"goodyear","tier":"FREE"}
