{"as_of":"2026-11-29","by_iso":[{"as_of":null,"fetched_at":"2026-11-29T06:05:01.322064+00:00","historical_completion_pct":null,"iso":"NESO","last_refreshed":"2026-11-29T06:05:01.322064+00:00","new_applications_period":null,"new_applications_q_gw":null,"queue_kind":"mixed_connection_queue","queued_generation_gw":null,"queued_generation_gw_as_of":null,"queued_load_data_center_gw":53.0,"queued_load_dc_share_pct":9.0,"queued_load_total_gw":591.4,"queued_load_total_gw_basis":"mixed_connection_queue","refresh_cadence":"daily","source_as_of":"2026-11-29","source_as_of_basis":"live_feed_fetch_date","source_name":"UK NESO TEC Register (active connections queue, per-project MW)","source_report":"UK NESO TEC Register (active connections queue, per-project MW)","source_url":"https://www.neso.energy/data-portal/transmission-entry-capacity-tec-register","top_subregions":null,"v":"published"},{"as_of":"2026-11-29","historical_completion_pct":null,"iso":"ERCOT","last_refreshed":"2026-11-29T06:04:53.031614+00:00","new_applications_period":null,"new_applications_q_gw":null,"queue_kind":"large_load","queued_generation_gw":461.4,"queued_generation_gw_as_of":"2026-10-31","queued_generation_gw_basis_note":"ERCOT's published active generation interconnection requests (ERCOT's own report: the GIS Summary or the Monthly Operational Overview, named in queued_generation_gw_source); separate from the large-load queue","queued_generation_gw_not_comparable_to":"DC Hub per-project interconnection-queue rows (interconnect_queue; LBNL-derived queue data and ISO project files), summed by DC Hub","queued_generation_gw_source":"cited: ERCOT GIS Report, October 2026 (posted 2026-11-02), Summary sheet: 1,847 generation interconnection or change requests, 461,414 MW (~461.4 GW) under study as of Oct 31 2026 \u2014 a SEPARATE queue from large load","queued_generation_requests":1847,"queued_generation_source_url":"https://www.ercot.com/misdownload/servlets/mirDownload?doclookupId=1293955078","queued_load_age_note":"ERCOT large-load 474 GW is as of 2026-06-30 (152 days old). ERCOT has posted newer large-load decks (read through 2026-09-16); none states a new aggregate total, so none is ingested and this is still ERCOT's newest published total DC Hub holds. ERCOT's next total may differ.","queued_load_as_of":"2026-06-30","queued_load_data_center_gw":426.6,"queued_load_data_center_gw_basis":"DERIVED: ~90% (ERCOT's published data-center share) of the ~474 GW large-load total (ERCOT Senate presentation Jul 29 2026) = ~427 GW; ERCOT does not publish a data-center GW figure itself","queued_load_dc_share_pct":90.0,"queued_load_total_gw":474.0,"queued_load_total_gw_basis":"large_load","refresh_cadence":"monthly","source_as_of":"2026-10-31","source_as_of_basis":"published_report","source_name":"ERCOT large-load queue (Senate presentation Jul 29 2026; June 19 LLWG) + generation queue (Oct 31 2026)","source_report":"ERCOT GIS Report, October 2026 (posted 2026-11-02), Summary sheet (generation queue); ERCOT Senate presentation Jul 29 2026, June 2026 data (large load)","source_url":"https://www.ercot.com/files/docs/2026/06/18/June-19-LLWG-Report.pptx","top_subregions":[{"approved_to_energize_as_of":"2026-09-16","approved_to_energize_gw":8.9,"approved_to_energize_mw":9456,"as_of":"2026-06","basis":"cited: ERCOT Senate presentation Jul 29 2026 (~474 GW seeking interconnection, June 2026, ~90% data centers); June 19 2026 Large Load Working Group: 466.5 GW in process, 8.9 GW approved; ERCOT August Monthly Operational Overview (Sep 16 2026): 9,456 MW approved to energize","batch_zero":{"as_of":"2026-09-11","base_gw":66.4,"excluded_gw":302.2,"included_gw":191.8,"included_gw_note":"Conditionally included: 191.8 GW per ERCOT's Sep 11 chart (66.4 base + 125.4 studied); ERCOT's takeaway slide says 194.3 GW. 191.8 included + 302.2 excluded is NOT a breakdown of the ~474 GW large-load total.","included_gw_takeaway_slide":194.3,"source_url":"https://www.ercot.com/files/docs/2026/09/11/14-Batch-Zero-Update.pdf","studied_gw":127.9,"studied_gw_ercot_chart":125.4,"studied_gw_note":"ERCOT's Sep 11 materials disagree: 127.9 GW studied in the text vs 125.4 GW on ERCOT's chart. Both shown; DC Hub does not pick one."},"data_center_gw_basis":"DERIVED: ~90% (ERCOT's published data-center share) of the ~474 GW large-load total (ERCOT Senate presentation Jul 29 2026) = ~427 GW; ERCOT does not publish a data-center GW figure itself","data_center_gw_derived":426.6,"data_center_share_pct_published":90.0,"energization_pause":{"as_of":"2026-09-11","commission_open_meeting":"2026-12-17","reports_due":"2026-12-10","source_url":"https://www.ercot.com/files/docs/2026/08/20/Batch-Zero-Verification-and-Audit-PUCT-Presentation.pdf","text":"Energizing new data-center and crypto loads of 75 MW or more is paused (since Governor Abbott's Aug 3 2026 directive; still paused as of Sep 11), until ERCOT's Batch Zero eligibility verification is complete. 17 large loads (6,608 MW peak demand over 5 years) have finished every other ERCOT process and await approval to energize (ERCOT Aug 20 PUC presentation). ERCOT files the verification report Dec 10, 2026; the Commission takes it up Dec 17."},"generation_queue":{"as_of":"2026-10-31","basis":"cited: ERCOT GIS Report, October 2026 (posted 2026-11-02), Summary sheet: 1,847 generation interconnection or change requests, 461,414 MW (~461.4 GW) under study as of Oct 31 2026 \u2014 a SEPARATE queue from large load","gw":461.4,"mw":461414,"report":"ERCOT GIS Report, October 2026 (posted 2026-11-02)","requests":1847,"source_url":"https://www.ercot.com/misdownload/servlets/mirDownload?doclookupId=1293955078","terms_url":"https://www.ercot.com/help/terms"},"in_process_gw":474.0,"june19_llwg_in_process_gw":466.5,"name":"Large-load (data-center-driven) interconnection queue","note":"ERCOT large-load (>=75 MW) interconnection queue, predominantly data centers \u2014 DISTINCT from the generation queue (queued_generation_gw); never shared or summed with it.","source_url":"https://www.ercot.com/files/docs/2026/06/18/June-19-LLWG-Report.pptx"}],"v":"published"},{"as_of":null,"fetched_at":"2026-11-29T06:03:49.930115+00:00","historical_completion_pct":null,"iso":"PJM","last_refreshed":"2026-11-29T06:03:49.930115+00:00","new_applications_period":null,"new_applications_q_gw":null,"queue_kind":"generation_queue","queued_generation_gw":373.2,"queued_generation_gw_as_of":null,"queued_generation_gw_basis_note":"Active serial + Transition Cycle (TC1/TC2) + Cycle 1 generation requests, sum of MFO (maximum facility output, not firm MW capacity); excludes transmission-service requests, In Service and Withdrawn. Since 2026-10-20 this total includes PJM's Cycle 1 requests, which the serial export alone did not list (that is why it rose from ~135 GW); not a PJM refresh","queued_load_data_center_gw":null,"queued_load_dc_share_pct":null,"queued_load_total_gw_basis":"generation_queue","refresh_cadence":"daily","source_as_of":"2026-11-29","source_as_of_basis":"live_feed_fetch_date","source_as_of_note":"the source files carry no date of their own (generated on request); fetched_at is when DC Hub read them","source_files":[{"file_date":null,"file_date_basis":"none_published","gw":132.88,"rows":619,"url":"https://services.pjm.com/PJMPlanningApi/api/Queue/ExportToXls"},{"file_date":null,"file_date_basis":"none_published","gw":240.37,"rows":617,"url":"https://www.pjm.com/m/ProjectTransition/GenerateExcelTransitionProjectsAll"}],"source_name":"PJM cycle + serial service request status (active generation requests, sum of MFO)","source_report":"PJM cycle + serial service request status (active generation requests, sum of MFO)","source_url":"https://www.pjm.com/planning/m/cycle-service-request-status","top_subregions":[],"v":"published"},{"as_of":null,"fetched_at":"2026-11-29T06:04:54.214695+00:00","historical_completion_pct":null,"iso":"MISO","last_refreshed":"2026-11-29T06:04:54.214695+00:00","new_applications_period":null,"new_applications_q_gw":null,"queue_kind":"generation_queue","queued_generation_gw":250.3,"queued_generation_gw_as_of":null,"queued_generation_gw_basis_note":"Active only, summer MW; excludes Done, Pending and Withdrawn","queued_generation_pending_revision_gw":17.0,"queued_generation_pending_revision_gw_basis":"MISO applicationStatus=Pending Revision Approval, summer MW; reported separately and not part of queued_generation_gw","queued_load_data_center_gw":null,"queued_load_dc_share_pct":null,"queued_load_total_gw_basis":"generation_queue","refresh_cadence":"daily","source_as_of":"2026-11-29","source_as_of_basis":"live_feed_fetch_date","source_name":"MISO GI Queue API (applicationStatus=Active, summer MW)","source_report":"MISO GI Queue API (applicationStatus=Active, summer MW)","source_url":"https://www.misoenergy.org/api/giqueue/getprojects","top_subregions":[],"v":"published"},{"as_of":null,"fetched_at":"2026-11-29T06:04:55.041917+00:00","historical_completion_pct":null,"iso":"SPP","last_refreshed":"2026-11-29T06:04:55.041917+00:00","new_applications_period":null,"new_applications_q_gw":null,"queue_kind":"generation_queue","queued_generation_gw":185.5,"queued_generation_gw_as_of":null,"queued_generation_gw_basis_note":"Active requests, max summer MW; excludes cessation","queued_load_data_center_gw":null,"queued_load_dc_share_pct":null,"queued_load_total_gw_basis":"generation_queue","refresh_cadence":"daily","source_as_of":"2026-11-29","source_as_of_basis":"live_feed_fetch_date","source_name":"SPP GI active requests (MAX Summer MW, excl. cessation)","source_report":"SPP GI active requests (MAX Summer MW, excl. cessation)","source_url":"https://opsportal.spp.org/Studies/GenerateActiveCsv","top_subregions":null,"v":"published"},{"as_of":"2026-07-16","fetched_at":"2026-11-29T06:04:55.614111+00:00","historical_completion_pct":null,"iso":"CAISO","last_refreshed":"2026-11-29T06:04:55.614111+00:00","new_applications_period":null,"new_applications_q_gw":null,"queue_kind":"generation_queue","queued_generation_gw":164.8,"queued_generation_gw_as_of":"2026-07-16","queued_generation_gw_basis_note":"Active only, Net MW to grid (Public Queue Report) + Cluster 15 and Cluster 16 requests (NET MW at POI); co-located hybrid projects counted once; excludes Completed (built) and Withdrawn. Since 2026-10-20 this total includes Clusters 15 and 16, which the Public Queue Report alone did not list (that is why it rose from ~74 GW)","queued_load_data_center_gw":null,"queued_load_dc_share_pct":null,"queued_load_total_gw_basis":"generation_queue","refresh_cadence":"daily","refresh_cadence_note":"how often DC Hub re-reads the source files; each publisher reposts its files on its own schedule, and source_as_of moves only when the oldest file is reposted","source_as_of":"2026-07-16T21:57:50+00:00","source_as_of_basis":"source_file_date","source_as_of_note":"the publisher's own date (HTTP Last-Modified) on the oldest of the 3 source file(s) this total was summed from: cluster-15-interconnection-requests.xlsx, last published 2026-07-16. The newest, publicqueuereport.xlsx, is dated 2026-11-28. DC Hub re-reads every file daily; this date is the publisher's, not the read date (each file's own date is in source_files)","source_files":[{"file_date":"2026-11-28T09:03:00+00:00","file_date_basis":"http_last_modified","gw":73.75,"rows":260,"url":"https://www.caiso.com/documents/publicqueuereport.xlsx"},{"file_date":"2026-07-16T21:57:50+00:00","file_date_basis":"http_last_modified","gw":28.45,"rows":86,"url":"https://www.caiso.com/documents/cluster-15-interconnection-requests.xlsx"},{"file_date":"2026-10-16T18:10:38+00:00","file_date_basis":"http_last_modified","gw":62.65,"rows":226,"url":"https://www.caiso.com/documents/cluster-16-queue-report.xlsx"}],"source_name":"CAISO queue reports: Public Queue Report (ACTIVE, Net MWs to Grid) + Cluster 15 + Cluster 16 (NET MW POI)","source_report":"CAISO queue reports: Public Queue Report (ACTIVE, Net MWs to Grid) + Cluster 15 + Cluster 16 (NET MW POI)","source_url":"https://www.caiso.com/generation-transmission/generation/generator-interconnection","top_subregions":[],"v":"published"},{"as_of":null,"fetched_at":"2026-11-29T06:05:02.609299+00:00","historical_completion_pct":null,"iso":"AESO","last_refreshed":"2026-11-29T06:05:02.609299+00:00","new_applications_period":null,"new_applications_q_gw":null,"queue_kind":"mixed_connection_queue","queued_generation_gw":null,"queued_generation_gw_as_of":null,"queued_load_data_center_gw":21.6,"queued_load_dc_share_pct":78.0,"queued_load_total_gw":27.6,"queued_load_total_gw_basis":"mixed_connection_queue","refresh_cadence":"daily","source_as_of":"2026-11-29","source_as_of_basis":"live_feed_fetch_date","source_name":"Alberta AESO Connection Project List (active; November-2026-Project-List.xlsx)","source_report":"Alberta AESO Connection Project List (active; November-2026-Project-List.xlsx)","source_url":"https://www.aeso.ca/grid/connecting-to-the-grid/connection-project-reporting/","top_subregions":null,"v":"published"},{"as_of":null,"fetched_at":"2026-11-29T06:05:02.067401+00:00","historical_completion_pct":null,"iso":"IESO","last_refreshed":"2026-11-29T06:05:02.067401+00:00","new_applications_period":null,"new_applications_q_gw":null,"queue_kind":"mixed_connection_queue","queued_generation_gw":null,"queued_generation_gw_as_of":null,"queued_load_data_center_gw":12.5,"queued_load_dc_share_pct":65.8,"queued_load_total_gw":19.1,"queued_load_total_gw_basis":"mixed_connection_queue","refresh_cadence":"daily","source_as_of":"2026-11-29","source_as_of_basis":"live_feed_fetch_date","source_name":"Ontario IESO CAA connection queue (active, summer MW)","source_report":"Ontario IESO CAA connection queue (active, summer MW)","source_url":"https://www.ieso.ca/en/Get-Involved/Connection-Assessments/Connection-Application-Status","top_subregions":null,"v":"published"},{"as_of":"2026-11-13","fetched_at":"2026-11-29T06:04:56.465610+00:00","historical_completion_pct":null,"iso":"NYISO","last_refreshed":"2026-11-29T06:04:56.465610+00:00","new_applications_period":null,"new_applications_q_gw":null,"queue_kind":"generation_queue","queued_generation_gw":9.9,"queued_generation_gw_as_of":"2026-11-13","queued_generation_gw_basis_note":"Active only, summer MW","queued_load_data_center_gw":null,"queued_load_dc_share_pct":null,"queued_load_total_gw_basis":"generation_queue","refresh_cadence":"monthly","refresh_cadence_note":"how often DC Hub re-reads the source files; each publisher reposts its files on its own schedule, and source_as_of moves only when the oldest file is reposted","source_as_of":"2026-11-13T14:55:37+00:00","source_as_of_basis":"source_file_date","source_as_of_note":"the publisher's own date (HTTP Last-Modified) on the oldest of the 1 source file(s) this total was summed from: NYISO-Interconnection-Queue.xlsx, last published 2026-11-13. DC Hub re-reads every file daily; this date is the publisher's, not the read date (each file's own date is in source_files)","source_files":[{"file_date":"2026-11-13T14:55:37+00:00","file_date_basis":"http_last_modified","gw":9.92,"rows":83,"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue.xlsx"}],"source_name":"NYISO Interconnection Queue (active, SP MW)","source_report":"NYISO Interconnection Queue (active, SP MW)","source_url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue.xlsx","top_subregions":[],"v":"published"},{"as_of":null,"fetched_at":"2026-11-29T06:05:00.310843+00:00","historical_completion_pct":null,"iso":"ISO-NE","last_refreshed":"2026-11-29T06:05:00.310843+00:00","new_applications_period":null,"new_applications_q_gw":null,"queue_kind":"generation_queue","queued_generation_gw":9.5,"queued_generation_gw_as_of":null,"queued_generation_gw_basis_note":"Status A (active), generation (Type G) only, summer MW; net MW where summer is blank; excludes Completed (C), Withdrawn (W) and transmission rows (ETU/TS)","queued_load_data_center_gw":null,"queued_load_dc_share_pct":null,"queued_load_total_gw_basis":"generation_queue","refresh_cadence":"daily","source_as_of":"2026-11-29","source_as_of_basis":"live_feed_fetch_date","source_name":"ISO-NE IRTT Public Queue (active, Summer MW)","source_report":"ISO-NE IRTT Public Queue (active, Summer MW)","source_url":"https://irtt.iso-ne.com/reports/external","top_subregions":null,"v":"published"}],"data_center_load":{"note":"Figures cover the full generation interconnection queue. The ISO public queues (ERCOT GIS / PJM NSQ / MISO GI / SPP / CAISO / NYISO / ISO-NE) are generation-side and do not classify queued load as data-center, so per-ISO data-center load is not derivable from these feeds and is reported as null rather than 0.","tracked":false},"dchub_classified":{"by_iso":{},"method":"Conservative classifier over the tracked per-project queue rows: fuel_type=Load OR DC name-match (data center/hyperscale/colocation/compute campus). Independent of, and comparable to, ISO-published large-load totals."},"freshness":{"fresh_iso_count":10,"latest_as_of":"2026-11-29","note":"Per-ISO as_of is in by_iso; 'fresh' = refreshed on the latest daily ingest.","stale_iso_count":0},"generated_at":"2026-11-29T22:55:43.163072+00:00","iso_count":10,"load":{"by_iso":[{"basis":"PJM-accepted large-load adjustments to the zonal summer peak forecast (MW above the embedded load), as published. Forecast adjustments, not interconnection requests; never summed with a generation queue. ISO-wide; not specific to one market.","iso":"PJM","kind":"large_load_forecast_adjustment","provenance":{"attribution":"Source: PJM Interconnection, L.L.C., Load Forecast Report, Table B-9 large-load adjustments (pjm.com)","lane":"ercot-pjm-largeload","license":"LicenseRef-PJM-Website-Terms","license_note":"PJM website terms: no reuse licence stated; not relicensed by DC Hub and not CC-BY","license_url":"https://www.pjm.com/about-pjm/legal","source":"PJM Load Forecast Report, Table B-9 (large-load adjustments above embedded)","source_url":"https://www.pjm.com/-/media/DotCom/planning/res-adeq/load-forecast/2026-load-adjustment-breakdown-for-capacity-obligations.xlsx","v":"published"},"published_on":"2026-02-06","report_year":2026,"rto_mw_by_year":{"2026":6413.0,"2031":41487.0,"2036":67379.0},"top_zones":[{"mw":20451.0,"year":2036,"zone":"DOM"},{"mw":17115.0,"year":2036,"zone":"AEP"},{"mw":10405.0,"year":2036,"zone":"COMED"},{"mw":6279.0,"year":2036,"zone":"PL"},{"mw":2624.0,"year":2036,"zone":"APS"}],"zones_with_adjustment":14}],"note":"Load side: published large-load figures per ISO, kept apart from the generation totals and never summed with them. PJM: zonal large-load forecast adjustments; the full rows are at by-iso?iso=PJM."},"methodology":"DCPI maps ISO queue position + load growth vs signed contracts -> Excess Power / Constraint scoring. Per-ISO BUILD/CAUTION/AVOID verdicts at https://dchub.cloud/dcpi.","projects":{"by_iso_count":{"CAISO":572,"ERCOT":1766,"ISO-NE":44,"MISO":1136,"NYISO":309,"PJM":1236,"SPP":999},"note":"Named per-project queue rows (project, MW, status, state/county) from the 7 US ISO public queues. Aggregate GW totals are in by_iso; call /api/v1/interconnection-queue/by-iso?iso=ERCOT for the full per-ISO project list.","top":[{"capacity_mw":3200.0,"county":"LA PAZ","expected_cod":null,"expected_cod_basis":"not_loaded","fuel_type":"Battery","iso":"CAISO","project_name":"ATLAS COMPLEX","queue_date":"2017-05-01","queue_date_basis":"queue_entry_date","queue_date_note":"CAISO: queue_date is the date the request entered the queue ('Queue Date' in the CAISO file), not a commercial-operation date. DC Hub loads no COD for CAISO, so expected_cod is null.","queue_entry_date":"2017-05-01","queue_id":"CAISO-1402","queue_status":"active","state":"AZ"},{"capacity_mw":3000.0,"county":"Indiana","expected_cod":null,"expected_cod_basis":"not_loaded","fuel_type":"Natural Gas","iso":"PJM","project_name":"Homer City 345 kV","queue_date":"2026-03-25","queue_date_basis":"queue_entry_date","queue_date_note":"PJM: queue_date is the date the request entered the queue ('Submitted Date' in the PJM file), not a commercial-operation date. DC Hub loads no COD for PJM, so expected_cod is null.","queue_entry_date":"2026-03-25","queue_id":"PJM-C01-1097","queue_status":"Active","state":"PA"},{"capacity_mw":2992.0,"cod_delayed":false,"completion_probability":8,"completion_probability_p05":2,"completion_probability_p95":13,"county":"Fisher","developer":"Golden Spread Electric","ercotqueue_as_of":"2026-11-05T09:37:37.946032","ercotqueue_provenance":{"as_of":"2026-11-05T09:37:37.946032","basis_class":{"cod_delayed":"derived","completion_probability":"modelled","completion_probability_p05":"modelled","completion_probability_p95":"modelled","developer":"filed","energization_approved_date":"filed","ercotqueue_as_of":"filed","fis_approved_date":"filed","fis_requested_date":"filed","funnel_stage":"derived","ia_signed_date":"filed","is_credible":"modelled","lifecycle":"derived","load_zone":"filed","queue_entry_date":"filed","source_report":"filed","sync_approved_date":"filed","technology_normalized":"derived"},"fields":["queue_entry_date","developer","completion_probability","funnel_stage","ercotqueue_as_of","source_report","lifecycle","technology_normalized","load_zone","is_credible","cod_delayed","completion_probability_p05","completion_probability_p95","ia_signed_date","fis_requested_date","fis_approved_date","energization_approved_date","sync_approved_date"],"license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","source":"ERCOTQueue (Matt Prusak), ercotqueue.com","source_report":"GIS_Report_October_2026.xlsx"},"expected_cod":"2030-09-22","expected_cod_basis":"projected_cod","fis_requested_date":"2026-09-16","fuel_type":"GAS","funnel_stage":"1_no_ia","is_credible":false,"iso":"ERCOT","lifecycle":"active","load_zone":"WEST","project_name":"Brazos Energy Security","projected_cod":"2030-09-22","queue_date":"2030-09-22","queue_date_basis":"projected_cod_legacy","queue_date_deprecated":true,"queue_date_note":"ERCOT: queue_date is a deprecated alias that holds the GIS report's projected commercial operation date (COD), not the date the project entered the queue. Read projected_cod (or expected_cod, the same value). The queue-entry date, where ERCOTQueue publishes it, is queue_entry_date.","queue_entry_date":"2025-10-21","queue_id":"ERCOT-28INR0456","queue_status":"active","source_report":"GIS_Report_October_2026.xlsx","state":"TX"},{"capacity_mw":2808.0,"county":"Montgomery","expected_cod":null,"expected_cod_basis":"not_loaded","fuel_type":"Nuclear","iso":"PJM","project_name":"Limerick 500 kV","queue_date":"2026-04-24","queue_date_basis":"queue_entry_date","queue_date_note":"PJM: queue_date is the date the request entered the queue ('Submitted Date' in the PJM file), not a commercial-operation date. DC Hub loads no COD for PJM, so expected_cod is null.","queue_entry_date":"2026-04-24","queue_id":"PJM-C01-1055","queue_status":"Active","state":"PA"},{"capacity_mw":2709.8,"county":"York","expected_cod":null,"expected_cod_basis":"not_loaded","fuel_type":"Nuclear","iso":"PJM","project_name":"Peach Bottom Units #2 & #3","queue_date":"2016-04-29","queue_date_basis":"queue_entry_date","queue_date_note":"PJM: queue_date is the date the request entered the queue ('Submitted Date' in the PJM file), not a commercial-operation date. DC Hub loads no COD for PJM, so expected_cod is null.","queue_entry_date":"2016-04-29","queue_id":"PJM-AB2-175","queue_status":"Partially in Service - Under Construction","state":"PA"},{"capacity_mw":2650.8,"county":"Salem","expected_cod":null,"expected_cod_basis":"not_loaded","fuel_type":"Nuclear","iso":"PJM","project_name":null,"queue_date":"2025-04-09","queue_date_basis":"queue_entry_date","queue_date_note":"PJM: queue_date is the date the request entered the queue ('Submitted Date' in the PJM file), not a commercial-operation date. DC Hub loads no COD for PJM, so expected_cod is null.","queue_entry_date":"2025-04-09","queue_id":"PJM-AH1-710 - moved to TC2","queue_status":"Active","state":"NJ"},{"capacity_mw":2626.0,"county":"Will","expected_cod":null,"expected_cod_basis":"not_loaded","fuel_type":"Nuclear","iso":"PJM","project_name":"Braidwood Station 20 345 kV","queue_date":"2026-04-24","queue_date_basis":"queue_entry_date","queue_date_note":"PJM: queue_date is the date the request entered the queue ('Submitted Date' in the PJM file), not a commercial-operation date. DC Hub loads no COD for PJM, so expected_cod is null.","queue_entry_date":"2026-04-24","queue_id":"PJM-C01-1979","queue_status":"Active","state":"IL"},{"capacity_mw":2584.0,"county":"Will","expected_cod":null,"expected_cod_basis":"not_loaded","fuel_type":"Nuclear","iso":"PJM","project_name":null,"queue_date":"2025-04-08","queue_date_basis":"queue_entry_date","queue_date_note":"PJM: queue_date is the date the request entered the queue ('Submitted Date' in the PJM file), not a commercial-operation date. DC Hub loads no COD for PJM, so expected_cod is null.","queue_entry_date":"2025-04-08","queue_id":"PJM-AH1-698 - moved to TC2","queue_status":"Active","state":"IL"},{"capacity_mw":2576.0,"county":"Ogle","expected_cod":null,"expected_cod_basis":"not_loaded","fuel_type":"Nuclear","iso":"PJM","project_name":"Byron Station 6 345 kV","queue_date":"2026-04-24","queue_date_basis":"queue_entry_date","queue_date_note":"PJM: queue_date is the date the request entered the queue ('Submitted Date' in the PJM file), not a commercial-operation date. DC Hub loads no COD for PJM, so expected_cod is null.","queue_entry_date":"2026-04-24","queue_id":"PJM-C01-1980","queue_status":"Active","state":"IL"},{"capacity_mw":2530.0,"county":"Ogle","expected_cod":null,"expected_cod_basis":"not_loaded","fuel_type":"Nuclear","iso":"PJM","project_name":null,"queue_date":"2025-04-07","queue_date_basis":"queue_entry_date","queue_date_note":"PJM: queue_date is the date the request entered the queue ('Submitted Date' in the PJM file), not a commercial-operation date. DC Hub loads no COD for PJM, so expected_cod is null.","queue_entry_date":"2025-04-07","queue_id":"PJM-AH1-702 - moved to TC2","queue_status":"Active","state":"IL"}],"total":6062,"tracked":true},"provenance":{"as_of":null,"as_of_basis":"UNMEASURED at collection level: AESO, IESO, ISO-NE, MISO, NESO, PJM, SPP are live feeds with no published report date. fetched_at is when DC Hub last collected them, not a data date; per-ISO report dates are in source_as_of on each row.","attribution":"Interconnection-queue rows are each ISO's own published data, not relicensed by DC Hub; use them under each publisher's terms: ERCOT: ERCOT, Generation Interconnection Status Report (reuse allowed with credit and the publisher's notices kept; https://www.ercot.com/help/terms); PJM: PJM Interconnection, service request status (no reuse licence stated by the publisher; https://www.pjm.com/about-pjm/legal.aspx); MISO: MISO, Generator Interconnection Queue (the publisher reserves its rights; no reuse grant found; https://www.misoenergy.org/meet-miso/legal-and-privacy/); SPP: Southwest Power Pool, generation interconnection requests (commercial use needs the publisher's written consent; https://www.spp.org/terms-conditions/); CAISO: California ISO, generator interconnection queue reports (reuse allowed with credit and the publisher's notices kept; https://www.caiso.com/privacy-terms-of-use); NYISO: NYISO, Interconnection Queue (no reuse licence stated by the publisher; https://www.nyiso.com/legal-notice); ISO-NE: ISO New England, interconnection request queue (the publisher reserves its rights; no reuse grant found; https://www.iso-ne.com/legal-privacy). Rows from other publishers in this response are under their own terms (see each row's source_url). DC Hub's own derived fields (for example estimated_ttp_months, fuel_class, coordinates and row sums) are CC-BY-4.0.","basis_class":"published","cite_as":"DC Hub, dchub.cloud","default_v":"published","fallback_url":"https://dchub.cloud","fetched_at":"2026-11-29T06:03:49.930115+00:00","license":"Mixed \u2014 not relicensed by DC Hub; see provenance.attribution for each ISO's terms","method":"published ISO queue disclosures, ingested per-ISO; per-record v: published = the ISO's own figure, inferred = DC Hub derivation","provenance_revision":"1.1","provenance_version":1,"source":"US ISO public interconnection queues (ERCOT GIS / PJM NSQ / MISO GI / SPP / CAISO / NYISO / ISO-NE)"},"queue_withdrawals":{"basis":"Requests the ISO's own queue file marks withdrawn, by the year the ISO dates the withdrawal. Covers only isos_captured; an ISO listed not_captured is unmeasured (null), never zero. gw sums the MW the request asked for. Not part of any queued total.","by_iso":{"CAISO":{"count":null,"gw":null,"reason":"the cluster workbooks' 'Withdrawn' sheets are not read","status":"not_captured"},"ERCOT":{"count":null,"gw":null,"reason":"the GIS report's project sheets list active requests only","status":"not_captured"},"ISO-NE":{"count":null,"gw":null,"reason":"the IRTT table lists withdrawn requests (status W); their date column has not been verified","status":"not_captured"},"MISO":{"basis":"MISO GI queue API: applicationStatus 'Withdrawn', dated by withdrawnDate","count":2327,"gw":395.038,"status":"captured"},"NYISO":{"count":null,"gw":null,"reason":"the workbook's 'Withdrawn' sheets are not read","status":"not_captured"},"PJM":{"count":null,"gw":null,"reason":"withdrawn requests are in the exports the loader reads (status Withdrawn) but their withdrawal-date column has not been verified","status":"not_captured"},"SPP":{"count":null,"gw":null,"reason":"the loader reads SPP's ACTIVE-requests CSV; rows with a cessation date are dropped, and whether a cessation is a withdrawal is unverified","status":"not_captured"}},"by_year":[{"count":14,"gw":1.876,"year":2017},{"count":43,"gw":6.793,"year":2018},{"count":165,"gw":26.411,"year":2019},{"count":185,"gw":28.397,"year":2020},{"count":200,"gw":27.139,"year":2021},{"count":52,"gw":8.006,"year":2022},{"count":273,"gw":41.591,"year":2023},{"count":87,"gw":12.545,"year":2024},{"count":947,"gw":165.855,"year":2025},{"count":339,"gw":74.081,"year":2026}],"count":2327,"gw":395.038,"isos_captured":["MISO"],"loaded_at":"2026-11-29T06:01:03.501980+00:00","undated":{"count":22,"gw":2.343}},"source":"https://dchub.cloud/interconnection-queues","totals":{"dc_share_pct":null,"dc_share_pct_note":"not computed: DC load (demand) over a generation-queue total is a cross-basis ratio. ERCOT's own published ~90% data-center share is on its by_iso row.","dchub_classified_dc_gw":null,"international_connections_queue_basis":"NESO + IESO + AESO connections queues: generation AND demand projects in one figure (kind mixed_connection_queue). Not comparable with, and never added to, the US generation total.","international_connections_queue_gw":638.1,"international_queued_demand_basis":"demand projects inside the NESO + IESO + AESO connections queues: all demand, not data centres only","international_queued_demand_gw":87.1,"queued_generation_gw":1454.6,"queued_generation_gw_scope":"US ISOs only, 7 ISOs, active only (ERCOT, PJM, MISO, SPP, CAISO, NYISO, ISO-NE): generation requests. Excludes non-ISO utility queues and withdrawn, completed and in-service projects, so it is not comparable with trackers that cover all US queues","queued_load_data_center_gw":426.6,"queued_load_data_center_gw_basis":"US data-center load only: ERCOT's DERIVED ~90% of its ~474 GW large-load queue. The international demand figures are separate (international_queued_demand_gw)."}}