{"_upgrade":{"checkout":"https://dchub.cloud/go/c/ZGV2ZWxvcGVyfA.f3f7e3b8f7f10047977d81b9eb754f61","corridors_hidden":3,"message":"Showing 2 of 5 corridors with limited data. A paid DC Hub plan for agents unlocks all corridors, scores, energy rates, and infrastructure counts.","url":"https://dchub.cloud/go/c/ZGV2ZWxvcGVyfA.f3f7e3b8f7f10047977d81b9eb754f61"},"baseline_as_of":"2026-03-23","baseline_fields":["corridors[].queue_gw","corridors[].system_peak_gw","corridors[].congestion_level","corridors[].transmission_capacity","corridors[].excess_generation","corridors[].dilution_risk","corridors[].notes","region.headline","region.description"],"corridors":[{"baseline_as_of":"2026-03-23","congestion_level":"extreme","dilution_risk":"High","excess_generation":"None","infrastructure":"\u2588\u2588 upgrade to see","is_baseline":true,"label":"Santa Clara / Silicon Valley","notes":"\u2588\u2588 upgrade to see","queue_gw":null,"state":"CA","system_peak_gw":null,"transmission_capacity":"Constrained","utility":"PG&E / SVP"},{"baseline_as_of":"2026-03-23","congestion_level":"high","dilution_risk":"High","excess_generation":"Limited","infrastructure":"\u2588\u2588 upgrade to see","is_baseline":true,"label":"Los Angeles Basin","notes":"\u2588\u2588 upgrade to see","queue_gw":null,"state":"CA","system_peak_gw":null,"transmission_capacity":"Constrained","utility":"SCE"}],"corridors_baseline":{"baseline_as_of":"2026-03-23","baseline_as_of_basis":"newest ingest timestamp on this region's grid_corridors rows","followup":"https://github.com/azmartone67/dchub-backend/issues/7440","is_baseline":true,"live_fields":[],"source":"DC Hub hand-curated corridor baseline (table grid_corridors). Queue, peak, congestion, transmission and dilution figures were set by hand on baseline_as_of and have not been refreshed since; no ingest writes this table."},"data_sources":["HIFLD (substations)","EIA (transmission, power plants, gas pipelines, retail rates)","EPA eGRID (carbon intensity)","FEMA (risk index)","USGS (water stress)","DC Hub (facilities, market intel)","CAISO interconnection queue (CAISO queue reports: Public Queue Report (ACTIVE, Net MWs to Grid) + Cluster 15 + Cluster 16 (NET MW POI)), as of 2026-07-16T21:57:50+00:00"],"energy_rates_cents_kwh":{"AZ":"\u2588\u2588 upgrade to see","CA":"\u2588\u2588 upgrade to see","NV":"\u2588\u2588 upgrade to see"},"facility_counts_by_state":{"AZ":270,"CA":585,"NV":121},"is_baseline":true,"live_fields":["region.total_queue_gw","facility_counts_by_state"],"provenance":{"as_of":"2026-03-23","basis_class":"derived","cite_as":"DC Hub, dchub.cloud","default_v":"inferred","fallback_url":"https://dchub.cloud","license":"CC-BY-4.0","method":"corridor-level grid analysis: queue GW, congestion, infrastructure counts within 50km, maintained per region by DC Hub. Corridor figures are a hand-set baseline (baseline_as_of); the region queue total is the ISO's own queue file when total_queue_gw_is_live","provenance_revision":"1.1","provenance_version":1,"source":"HIFLD + EIA + EPA eGRID + FEMA + USGS + DC Hub facilities/market intel (see data_sources)"},"region":{"_queue_gw_source":"CAISO generation queue, as of 2026-07-16T21:57:50+00:00","corridors_baseline_as_of":"2026-03-23","corridors_is_baseline":true,"description":"California grid constraints and wildfire risk push developers to Phoenix, Las Vegas, and Reno. Solar abundance but transmission bottlenecks define the Western corridor.","headline":"Wildfire Risk, Grid Constraints, and the AZ/NV Alternative","id":"caiso","iso":"CAISO","key_states":["CA","AZ","NV"],"name":"CAISO \u2014 California & Western","narrative_baseline_as_of":"2026-03-23","narrative_is_baseline":true,"narrative_source":"DC Hub hand-written region summary (table grid_regions)","page_url":"/research/grid-intelligence/caiso","queue_basis":"generation","status":"live","total_queue_gw":164.9,"total_queue_gw_as_of":"2026-07-16T21:57:50+00:00","total_queue_gw_is_live":true,"total_queue_gw_source":"ISO generation interconnection queue (DC Hub daily ingest of the ISO's own queue file)","total_queue_gw_sources":[{"age_hours":5.7,"basis_note":"Active only, Net MW to grid (Public Queue Report) + Cluster 15 and Cluster 16 requests (NET MW at POI); co-located hybrid projects counted once; excludes Completed (built) and Withdrawn. Since 2026-10-20 this total includes Clusters 15 and 16, which the Public Queue Report alone did not list (that is why it rose from ~74 GW)","iso":"CAISO","last_refreshed":"2026-10-27T06:04:41.423899+00:00","queued_generation_gw":164.9,"source_as_of":"2026-07-16T21:57:50+00:00","source_name":"CAISO queue reports: Public Queue Report (ACTIVE, Net MWs to Grid) + Cluster 15 + Cluster 16 (NET MW POI)","source_url":"https://www.caiso.com/generation-transmission/generation/generator-interconnection"}]},"success":true,"tax_incentives":{"AZ":"\u2588\u2588 upgrade to see","CA":"\u2588\u2588 upgrade to see","NV":"\u2588\u2588 upgrade to see"},"tier":"free","total_corridors":5}
