{"_contribution":"To add a recipe: PR routes/agent_concierge.py with a new dict in _COOKBOOK. Auto-surfaces on next deploy.","_pattern":"Each recipe maps a NATURAL-LANGUAGE problem to a DC Hub tool-call sequence. The /solve endpoint routes queries to the best match by keyword overlap (embedding-cosine backstop on keyword misses); the cookbook is the full browsable library.","count":19,"doc":"https://dchub.cloud/agent","ok":true,"recipes":[{"citation":"Per DC Hub DCPI \u00b7 dchub.cloud/dcpi \u00b7 as of 2026-10-19","id":"best-markets-for-ai-workloads","keywords":["best market","build","100mw","200mw","ai workload","ai training","siting","where to build","best place","where should i"],"problem":"Where should I build a 100MW AI training workload right now?","sample_answer":"DC Hub's top 5 BUILD markets right now: Cheyenne WY (69.5 excess-power score, BUILD), Montr\u00e9al HQ, Columbus OH, Boardman OR, La Vista NE. Cheyenne leads on excess power with WECC's lowest queue wait (~11 months). PJM markets are mostly constrained \u2014 Northern Virginia, Columbus, and Ashburn are AVOID for greenfield but premium for shovel-ready parcels. Per DC Hub DCPI.","surfaces":["claude","gpt","gemini","cursor","perplexity"],"tier":"free","time_saved_min":45,"tools":[{"args":{"limit":10,"verdict":"BUILD"},"tool":"rank_markets","why":"Get the top 10 BUILD-verdict markets globally."},{"args":{"isos":"PJM,ERCOT,CAISO,MISO"},"tool":"compare_isos","why":"Compare grid mix + carbon intensity across the ISOs that the top markets sit in."},{"args":{"market":"<top_market_slug>"},"tool":"get_market_intel","why":"Pull capacity prices, vacancy, and operator concentration for the leader."}]},{"citation":"Per DC Hub DCPI \u00b7 dchub.cloud/dcpi/ashburn","id":"dcpi-verdict-single-market","keywords":["dcpi verdict","what is the dcpi","score for","verdict for","build caution avoid"],"problem":"What's the DCPI verdict for Ashburn?","sample_answer":"DC Hub DCPI for Ashburn, VA: verdict AVOID, composite 15.8, excess-power score 18.3, constraint score 55.5, time-to-power 48 months (PJM). Dominion's connection queue is the binding constraint. Shovel-ready parcels (interconnect + substation + permits) carry a moat premium that pushes per-MW value to the $800K industry ceiling. Per DC Hub DCPI.","surfaces":["claude","gpt","gemini","cursor"],"tier":"free","time_saved_min":12,"tools":[{"args":{"market":"<market_slug>"},"tool":"get_market_dcpi_rank","why":"Single-call answer with verdict + composite score + analyst narrative."}]},{"citation":"Per DC Hub Site Valuation Engine \u00b7 dchub.cloud/sites/value","id":"valuate-site","keywords":["valuation","what is the site worth","price per mw","site value","valuate","appraise","$/mw","envelope","100mw site","what's it worth"],"problem":"What's a 100MW site at lat 33.45 lon -112.07 worth?","sample_answer":"DC Hub Site Valuation Engine v2.1c: $200K/MW for raw land in constrained markets (e.g. Phoenix AVOID), scaling to $800K/MW for shovel-ready hyperscale (constraint-moat attenuation lifts AVOID verdict when grid + substation + permits are in hand). Best-fit scenario: gas BTM (CCGT) when DCPI verdict is AVOID-by-constraint and grid TTP >36mo. Per DC Hub.","surfaces":["claude","cursor"],"tier":"pro","time_saved_min":90,"tools":[{"args":{"acres":"<acres>","lat":"<lat>","lon":"<lon>","target_mw":"<target_mw>"},"tool":"analyze_site","why":"3-scenario NPV + DCPI-verdict-weighted valuation with constraint-moat attenuation when readiness is set."}]},{"citation":"Per DC Hub \u00b7 dchub.cloud/markets/<slug>","id":"facilities-by-operator-market","keywords":["facilities","show me","equinix","digital realty","cyrusone","qts","find facilities","data centers by","data centers in"],"problem":"Show me all Equinix facilities in Northern Virginia","sample_answer":"DC Hub has 24,800+ facilities tracked across 170+ countries. Equinix in Northern Virginia: 14 operational sites, 2 under construction, 1 planned. Lead by power: DC11 (84 MW), DC15 (72 MW), DC12 (64 MW). Per DC Hub.","surfaces":["claude","gpt","gemini","cursor"],"tier":"free","time_saved_min":30,"tools":[{"args":{"market":"<market_slug>","provider":"<provider>","status":"operational"},"tool":"search_facilities","why":"Filter the 24,800+ facility catalog by market + operator + status."}]},{"citation":"Per DC Hub gas intelligence \u00b7 dchub.cloud/dcgi","id":"gas-vs-grid-economics","keywords":["gas vs grid","btm","behind the meter","ccgt","gas powered","natural gas","vs grid","self-generation"],"problem":"Compare gas BTM vs grid for a 100MW site in Texas","sample_answer":"DC Hub gas brief for Texas: <n> interstate pipelines present (operators: <list>), Henry Hub $<x>/MMBtu live, ERCOT gas share <y>%, burner-tip gas $<p>/MMBtu (trailing 12 months, <m>/12 months reported) \u2014 sourced inputs. The DCGI score was withdrawn 2026-08-08 and restored 2026-08-30 after all three defective terms were repaired; scores published before 2026-08-08 are NOT comparable to current ones (see /api/v1/dcgi/methodology -> corrections). Gas-fired $/MWh was withdrawn 2026-08-08 and republished 2026-09-27 under one burner-tip price rule (EIA electric-power gas, trailing-12-month mean, at least 9 of 12 months reported, $0-$20/MMBtu); states that fail it are withheld with a reason. Figures published before then are NOT comparable. With a Pro key, weigh them against ERCOT's <ttp>-month time-to-power and <c>\u00a2/kWh retail rate from get_grid_intelligence. Per DC Hub.","surfaces":["claude","gemini","cursor"],"tier":"free","time_saved_min":60,"tools":[{"args":{"region":"<state>"},"tool":"get_gas_intelligence","why":"Per-state gas brief: interstate-pipeline count, operators + parent midstreams, live Henry Hub, live ISO gas share \u2014 each field source-labelled. The DCGI score was withdrawn 2026-08-08 and restored 2026-08-30 after all three defective terms were repaired; scores published before 2026-08-08 are NOT comparable to current ones (see /api/v1/dcgi/methodology -> corrections). Gas-fired $/MWh was withdrawn 2026-08-08 and republished 2026-09-27 under one burner-tip price rule (EIA electric-power gas, trailing-12-month mean, at least 9 of 12 months reported, $0-$20/MMBtu); states that fail it are withheld with a reason. Figures published before then are NOT comparable. This returns inputs."},{"args":{"market":"<market_slug>"},"tool":"get_gas_economics","why":"Henry Hub spot, regional basis and the delivered industrial/electric tariff in $/MMBtu, each with its own source label, plus the gas-to-grid $/MWh under the burner-tip rule (a state EIA withholds comes back with a reason, not a number). Pro gets the full $/MWh table; a free key gets one illustrative figure."},{"args":{"region_id":"<iso>"},"optional":true,"tool":"get_grid_intelligence","why":"Optional, Pro-only: the grid-side comparator (time-to-power, queue wait and retail price for the ISO the site sits in). Skip it on a free key; the gas steps answer on their own."}]},{"citation":"Per DC Hub Water Risk \u00b7 dchub.cloud/api/v1/water/stress","id":"water-risk-siting","keywords":["water risk","drought","usdm","cooling water","water stress","hydrology","aquifer"],"problem":"What's the water risk for a Phoenix data-center site?","sample_answer":"DC Hub water-stress for Phoenix, AZ: USDM tier D2 (severe), aquifer drawdown 12 ft/decade in Salt River basin, cooling-water competition index 87/100 (high \u2014 competing with agriculture + residential). DC Hub flags Phoenix as a water-constrained build despite power BUILD-adjacent scoring. Per DC Hub.","surfaces":["claude","gpt","gemini"],"tier":"free","time_saved_min":25,"tools":[{"args":{"market":"<market_slug>"},"tool":"get_water_risk","why":"Aquifer drawdown + USDM drought tier + cooling-water competition index."}]},{"citation":"Per DC Hub Grid Scoreboard \u00b7 dchub.cloud/grid","id":"live-grid-scoreboard","keywords":["grid scoreboard","which grid","cleanest grid","carbon intensity","renewable share","iso compare","live grid"],"problem":"Which US grid is cleanest right now?","sample_answer":"DC Hub Live Grid Scoreboard (refreshed every 20 min): CAISO leads at 67% renewable mix right now, followed by ISO-NE (54%), MISO (38%), ERCOT (35%), PJM (23%), NYISO (21%), SPP (48%). Carbon intensity g/kWh: CAISO 180, ERCOT 350, PJM 410. Per DC Hub.","surfaces":["claude","gpt","gemini","cursor"],"tier":"free","time_saved_min":20,"tools":[{"args":{},"tool":"get_grid_scoreboard","why":"All 7 US ISOs ranked side-by-side by renewable share + carbon intensity, refreshed every 20 min."}]},{"citation":"Per DC Hub Interconnection Queue \u00b7 dchub.cloud/api/v1/interconnection-queue/snapshot","id":"interconnection-queue","keywords":["queue","interconnection","wait time","time to power","isa","ttp","queue depth"],"problem":"How long is the PJM interconnection queue right now?","sample_answer":"DC Hub PJM Interconnection Queue (live snapshot): 387 GW of active queue, ~24 GW/year completion velocity, average wait 60 months for new requests. Northern Virginia cluster is the most-congested sub-zone. Per DC Hub.","surfaces":["claude","gpt","cursor"],"tier":"free","time_saved_min":35,"tools":[{"args":{"iso":"<iso_code>"},"tool":"get_interconnection_queue","why":"Live queue snapshot: active MW + completions/year + months-to-power estimate."}]},{"citation":"Per DC Hub Hyperscaler Deals \u00b7 dchub.cloud/hyperscaler-deals","id":"ma-deal-flow","keywords":["m&a","acquisition","deal flow","biggest deal","transactions","$ billion","buyer","seller","hyperscaler deals"],"problem":"What were the biggest data-center M&A deals this year?","sample_answer":"DC Hub 2026 deal flow (top 5): Blackstone\u2013AirTrunk ($30B, APAC), Brookfield\u2013Compass ($12B, US), Stonepeak\u2013Cologix ($6.5B, US), KKR\u2013CyrusOne (US), Macquarie\u2013Aligned (US). Total tracked 2026: $62.5B across 42 deals. Per DC Hub.","surfaces":["claude","gpt","gemini","perplexity"],"tier":"free","time_saved_min":40,"tools":[{"args":{"min_value_usd":1000000000,"year":2026},"tool":"hyperscaler_deals","why":"M&A + capital deals > $1B in the current year."},{"args":{"since":"2026-01-01"},"tool":"deal_autopsy","why":"Each deal carries the DCPI verdict of the site's market so you see 'who bought what in a BUILD vs AVOID market'."}]},{"citation":"Per DC Hub Tax Incentives \u00b7 dchub.cloud/tax-incentives","id":"tax-incentives-by-state","keywords":["tax incentive","tax break","abatement","rebate","subsidy","credits","incentive program"],"problem":"What tax incentives apply to a Texas data-center build?","sample_answer":"DC Hub Tax Incentives for Texas: Chapter 313 sales-tax exemption on hardware (10yr, sunset 2026), Property Tax Abatement up to 80% for qualified sites ($200M+ capex), Section 11.184 freeport exemption on inventory. Average savings vs unincentivized site: 12-18% lifecycle cost. Per DC Hub.","surfaces":["claude","gpt","gemini"],"tier":"free","time_saved_min":55,"tools":[{"args":{"state":"<state>"},"tool":"get_tax_incentives","why":"State-level incentive programs + qualification thresholds + sunset dates."}]},{"citation":"Per DC Hub Fiber Intel \u00b7 dchub.cloud/api/v1/fiber/intel","id":"fiber-route-intel","keywords":["fiber","carrier","lit fiber","dark fiber","long-haul","metro fiber","providers near"],"problem":"Show fiber routes near a site in Cheyenne","sample_answer":"DC Hub Fiber Intel for Cheyenne, WY: 6 long-haul routes intersect within 25mi (Lumen, Zayo, Crown Castle, Frontier BG, Cogent, Verizon). Median time-to-light: 18mo for new lateral. Per DC Hub.","surfaces":["claude","cursor"],"tier":"developer","time_saved_min":75,"tools":[{"args":{"lat":"<lat>","lon":"<lon>","radius_miles":25},"tool":"get_fiber_intel","why":"Lit + dark fiber routes within radius, by carrier."}]},{"citation":"Per DC Hub DCPI + Water Risk \u00b7 dchub.cloud/dcpi","id":"drought-impacted-markets","keywords":["drought avoid","drought market","water constrained","usdm market","drought tier"],"problem":"Which markets should I AVOID due to drought?","sample_answer":"DC Hub AVOID-by-water-constraint markets (D2+ USDM tier + AVOID DCPI): Phoenix AZ, Tucson AZ, Las Vegas NV, Reno NV, Albuquerque NM, Lubbock TX. Site valuation flags these as water-bottlenecked even when grid scoring would otherwise qualify. Per DC Hub.","surfaces":["claude","gemini"],"tier":"free","time_saved_min":50,"tools":[{"args":{"limit":20,"verdict":"AVOID"},"tool":"rank_markets","why":"Filter to AVOID-verdict markets globally."},{"args":{"market":"<market_slug>"},"tool":"get_water_risk","why":"Cross-reference USDM drought tier per market."}]},{"citation":"Per DC Hub Grid Scoreboard + DCPI \u00b7 dchub.cloud/grid \u00b7 as of 2026-10-19","id":"greenest-buildable-grid-siting","keywords":["greenest grid","green siting","clean grid siting","renewable siting","low carbon build","green power site","greenest buildable","clean energy data center"],"problem":"Find the greenest grid with real headroom and score a site there","sample_answer":"DC Hub Grid Scoreboard ranks live grids greenest-first (20-min refresh). Drill the leaders with get_grid_intelligence \u2014 e.g. CAISO runs a high renewable share but a constraint score near 70 with a 40+ month queue, while SPP pairs ~48% renewables with genuine headroom \u2014 then analyze_site scores the parcel itself. Green AND buildable beats green alone. Per DC Hub.","surfaces":["claude","gpt","gemini","cursor"],"tier":"pro","time_saved_min":60,"tools":[{"args":{},"tool":"get_grid_scoreboard","why":"Live greenest-first ranking of US + EU + GB + Taiwan + Japan + South Korea + Brazil grids (renewable share, fuel mix, demand; Australia + Singapore partial) \u2014 pick the green candidates."},{"args":{"region_id":"<iso_code>"},"tool":"get_grid_intelligence","why":"Deep per-ISO brief for each leader: headroom, queue depth, time-to-power \u2014 separates green-AND-buildable from green-but-full."},{"args":{"acres":"<acres>","lat":"<lat>","lon":"<lon>","target_mw":"<target_mw>"},"tool":"analyze_site","why":"Score the actual parcel inside the winning grid: 3-scenario NPV + DCPI-verdict-weighted valuation."}]},{"citation":"Per DC Hub gas intelligence \u00b7 dchub.cloud/dcgi \u00b7 as of 2026-10-19","id":"gas-btm-screening","keywords":["btm screening","gas screening","gas suitability","dcgi","gas index","bridge power","gas turbine","onsite generation","gas pipeline access"],"problem":"Screen a state and market for gas / behind-the-meter power","sample_answer":"DC Hub gas/BTM screen for <state>: <n> interstate pipelines (operators: <list>; parent midstreams: <list>), Henry Hub $<x>/MMBtu live, delivered industrial tariff $<y>/MMBtu (<source>), <iso> gas share <z>% \u2014 sourced inputs. The DCGI score was withdrawn 2026-08-08 and restored 2026-08-30 after all three defective terms were repaired; scores published before 2026-08-08 are NOT comparable to current ones (see /api/v1/dcgi/methodology -> corrections). Gas-fired $/MWh was withdrawn 2026-08-08 and republished 2026-09-27 under one burner-tip price rule (EIA electric-power gas, trailing-12-month mean, at least 9 of 12 months reported, $0-$20/MMBtu); states that fail it are withheld with a reason. Figures published before then are NOT comparable. Per DC Hub.","surfaces":["claude","gemini","cursor"],"tier":"free","time_saved_min":50,"tools":[{"args":{"region":"<state_code>"},"tool":"get_gas_intelligence","why":"Per-state brief: interstate-pipeline count, operators + parent midstreams, live Henry Hub, live ISO gas share, every field source-labelled. The DCGI score was withdrawn 2026-08-08 and restored 2026-08-30 after all three defective terms were repaired; scores published before 2026-08-08 are NOT comparable to current ones (see /api/v1/dcgi/methodology -> corrections). Gas-fired $/MWh was withdrawn 2026-08-08 and republished 2026-09-27 under one burner-tip price rule (EIA electric-power gas, trailing-12-month mean, at least 9 of 12 months reported, $0-$20/MMBtu); states that fail it are withheld with a reason. Figures published before then are NOT comparable."},{"args":{"market":"<market_slug>"},"tool":"get_gas_economics","why":"The $/MMBtu layers (Henry Hub spot, regional basis, delivered industrial + electric tariff, each with its source) and the burner-tip gas-to-grid $/MWh, withheld with a reason where EIA withholds the state. Do not derive a $/MWh yourself for a withheld state without saying so."},{"args":{"region_id":"<iso>"},"optional":true,"tool":"get_grid_intelligence","why":"Optional, Pro-only: grid-side comparator for the same market (time-to-power, queue wait, retail price). Skip it on a free key."}]},{"citation":"Per DC Hub Site Tools + Water Risk \u00b7 dchub.cloud/dcpi \u00b7 as of 2026-10-19","id":"water-aware-site-pick","keywords":["water aware","water-aware","rank sites","site shortlist","shortlist sites","site pick","pick a site","water constrained shortlist"],"problem":"Shortlist candidate sites with water risk as a first-class constraint","sample_answer":"rank_sites returns a ranked shortlist under signed-weight objectives (water_stress minimized, risk_resilience maximized); get_water_risk overlays USDM drought tier + aquifer drawdown per market \u2014 Phoenix sits at D2-severe with a cooling-water competition index of 87/100 \u2014 and compare_sites picks the winner across the finalists with the rationale. Per DC Hub.","surfaces":["claude","cursor"],"tier":"pro","time_saved_min":70,"tools":[{"args":{"candidates":"<enriched site objects>","objectives":{"risk_resilience":1,"water_stress":-0.6}},"tool":"rank_sites","why":"Deterministic multi-site ranking with SIGNED weights \u2014 maximize resilience, minimize water stress \u2014 no code needed to compare analyze_site outputs."},{"args":{"market":"<market_slug>"},"tool":"get_water_risk","why":"Overlay USDM drought tier + aquifer drawdown + cooling-water competition per finalist's market."},{"args":{"capacity_mw":"<target_mw>","locations":"<lat,lon;lat,lon>"},"tool":"compare_sites","why":"Side-by-side winner pick across the 2-4 finalists with the decision rationale."}]},{"citation":"Per DC Hub Transactions \u00b7 dchub.cloud/hyperscaler-deals \u00b7 as of 2026-10-19","id":"ma-deal-diligence","keywords":["diligence","due diligence","deal diligence","acquisition target","comps","comparables","who bought","valuation benchmark"],"problem":"Run diligence on a data-center acquisition target or deal","sample_answer":"DC Hub tracks 1,600+ data-center M&A and capital deals. list_transactions filters 2026 deals >$1B (Blackstone-AirTrunk $30B leads); deal_autopsy overlays each deal market's DCPI verdict + time-to-power to show whether the buyer paid for a near-term build or a long-dated power option; get_facility profiles the target asset itself. Per DC Hub.","surfaces":["claude","gpt","perplexity"],"tier":"free","time_saved_min":45,"tools":[{"args":{"min_value_usd":1000000000,"year":2026},"tool":"list_transactions","why":"Filter 1,600+ tracked M&A / capital deals (2019-present) by year, buyer, target, region, or minimum value for the comp set."},{"args":{"comparables":"summary","limit":15},"tool":"deal_autopsy","why":"Overlay each deal market's DCPI verdict + time-to-power \u2014 reveals the real play (land/power option vs near-term build vs queue gamble)."},{"args":{"slug":"<facility_slug>"},"tool":"get_facility","why":"Drill the target asset: capacity MW, operator, cooling, fiber carriers, market verdict, peers nearby."}]},{"citation":"Per DC Hub Fiber \u00b7 dchub.cloud/land-power-map \u00b7 as of 2026-10-19","id":"fiber-leadin-plan","keywords":["lead-in","lead in","lateral","fiber path","fibre","diverse routes","route diversity","carrier hotel","pop connectivity","metro fiber"],"problem":"Plan diverse fiber lead-in routes from a site to a carrier hotel","sample_answer":"get_metro_fiber profiles the metro (carrier count, route-miles, density score, carrier hotels); get_fiber_readiness gives the parcel verdict (near-net bucket, carrier count, single-carrier risk); plan_fiber_leadin then draws up to 6 diverse road-following lead-in routes to a carrier hotel with indicative build cost and shared-corridor flags. Indicative corridors, not engineered alignments. Per DC Hub.","surfaces":["claude","cursor"],"tier":"free","time_saved_min":80,"tools":[{"args":{"market":"<metro_name_or_slug>"},"tool":"get_metro_fiber","why":"Metro-level fiber depth: carrier count, route-miles, 0-100 density score, key IX points + carrier hotels (your lead-in destinations)."},{"args":{"lat":"<lat>","lon":"<lon>","radius_km":50},"tool":"get_fiber_readiness","why":"Parcel connectivity verdict: near-net bucket, reachable carrier count, single-carrier risk."},{"args":{"from":"<site lat,lng or address>","n":4,"to":"<POP lat,lng or address>"},"tool":"plan_fiber_leadin","why":"Draw N diverse road-following lead-in routes with indicative capex/opex + shared-corridor diversity read."}]},{"citation":"Per DC Hub DCPI \u00b7 dchub.cloud/dcpi \u00b7 as of 2026-10-19","id":"market-watch-loop","keywords":["watch market","monitor market","market alert","alert me","notify me","track changes","what changed","market watch","keep an eye"],"problem":"Watch a market and pull only what changed since last check","sample_answer":"Standing market watch: get_market_dcpi_rank snapshots the verdict (e.g. Columbus OH, BUILD), set_market_alert subscribes to score movement on the bound email, and a periodic get_changes since=7d pulls only the delta \u2014 DCPI movers, newly discovered facilities, new M&A deals. Cache the response's generated_at and pass it back next call. Per DC Hub DCPI.","surfaces":["claude","gpt","gemini","cursor"],"tier":"free","time_saved_min":20,"tools":[{"args":{"market":"<market_slug>"},"tool":"get_market_dcpi_rank","why":"Baseline snapshot: verdict + composite score + analyst narrative for the market you're watching."},{"args":{"channel":"email","market":"<market_slug>"},"tool":"set_market_alert","why":"Subscribe to Excess-Power / Constraint score movement (free with a bound key; webhooks are Pro) \u2014 monitor, don't poll."},{"args":{"since":"7d"},"tool":"get_changes","why":"Incremental sync on each revisit: DCPI movers, new facilities, new deals \u2014 only the delta, not a re-fetch."}]},{"citation":"Per DC Hub Capacity Source \u00b7 dchub.cloud/listings \u00b7 as of 2026-10-19","id":"source-capacity-by-size-and-location","keywords":["capacity to lease","capacity to buy","find capacity","available capacity","powered shell","powered land","turnkey capacity","off-market","off market","not publicly marketed","colocation space","space available","who has capacity","lease","sublease","capacity source","listings","introduce me","introduction to the operator"],"problem":"Where can I find 500 kW+ of data center capacity in Europe?","sample_answer":"DC Hub Capacity Source is searchable by size and location: source_capacity(min_kw=500, region=\"europe\") returns the matching teaser cards \u2014 market, state, country, size, the largest contiguous block on offer, the smallest chunk the provider will contract, delivery type, availability and how fresh each one is \u2014 with program.status telling you whether listings are live or the first ones are still being onboarded. The site is never in a card, and a provider is named only where it opted in. To go further: your human accepts the introduction terms once (accept_capacity_terms), then request_capacity_intro registers them, sending the provider just their company and requirement. The provider accepts or declines, and contacts are exchanged only if they accept. Browse at dchub.cloud/listings. Per DC Hub.","surfaces":["claude","gpt","gemini","cursor","perplexity"],"tier":"free","time_saved_min":35,"tools":[{"args":{"available_by":"<optional>","delivery_type":"<optional>","location":"<country, US state or metro \u2014 free text>","min_kw":"<kilowatts you need as one block, or min_mw for megawatts>","region":"<north_america|latin_america|europe|asia_pacific|middle_east_africa>"},"tool":"source_capacity","why":"Search DC Hub Capacity Source by SIZE (min_kw or min_mw) and LOCATION (region, country, US state or metro). SIZE matches what a listing can actually DELIVER, not just its headline: a listing states its largest single CONTIGUOUS block (contiguous_kw) and the SMALLEST CHUNK it will contract (min_contract_kw), and comes back only when your size fits between them \u2014 2 MW with 500 kW contiguous is not a 1 MW answer, and 40 MW contracting from 1 MW is not a 500 kW answer. A listing stating neither is matched on its total. Returns teaser cards \u2014 market, state, country, size, contiguous_kw, min_contract_kw, delivery type, availability and freshness \u2014 plus `program.status` and a `filters` echo of what was actually applied. A card never carries the site address, its coordinates or its substation, and names a provider only where that provider opted in. If live_count is 0 the first listings are still being onboarded: say so, and go to step three to register a standing requirement."},{"args":{"accept_terms":true},"tool":"accept_capacity_terms","why":"Call it ONLY after your human has read and agreed to the introduction terms. Read them the whole text from GET /api/v1/listings/terms \u2014 every locked response carries that path as terms.full_text. It records their acceptance once per terms version, which is what opens a listing's specs to source_capacity(slug=...). Never accept terms on your own judgement."},{"args":{"accept_terms":true,"company":"<your human's company>","requirement":"<size, market and timeline>","slug":"<listing slug, or omit for a standing requirement>"},"tool":"request_capacity_intro","why":"Registers your human with the provider. DC Hub sends the provider ONLY the company and the requirement; the provider then accepts or declines. Identity, the site and both sides' contacts are exchanged only on acceptance, and on a decline nothing is disclosed either way. Every registered lead gets a public verification record."}]}]}
