{"ok": true, "slug": "spp-interconnection-queue", "url": "https://dchub.cloud/ai-answers/spp-interconnection-queue", "json_url": "https://dchub.cloud/ai-answers/spp-interconnection-queue.json", "question": "How large is the SPP interconnection queue?", "answer": "SPP's generation interconnection queue is 186 GW as of Nov 23, 2026, as published by the ISO. The typical time to power is about 24 months (ISO-level).", "as_of": "2026-11-23", "published": "2026-11-23", "refreshed": "2026-11-23", "rows": [{"label": "Grid operator", "value": "SPP"}, {"label": "Generation queue", "value": "186 GW"}, {"label": "Typical time to power", "value": "about 24 months (ISO-level)"}], "source": "Source: SPP GI active requests (MAX Summer MW, excl. cessation), published Nov 23, 2026. DC Hub refreshed Nov 23, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0.", "cite_as": "DC Hub (dchub.cloud), as of Nov 23, 2026", "cite_line": "Cite as: DC Hub (dchub.cloud), \"How large is the SPP interconnection queue?\", https://dchub.cloud/ai-answers/spp-interconnection-queue, as of Nov 23, 2026.", "license": "https://creativecommons.org/licenses/by/4.0/", "creator": "DC Hub", "based_on": ["https://opsportal.spp.org/Studies/GenerateActiveCsv"], "data_download": "https://dchub.cloud/api/v1/interconnection-queue/by-iso?iso=SPP", "related": [{"url": "https://dchub.cloud/grid/spp", "label": "SPP grid"}, {"url": "https://dchub.cloud/interconnection-queues", "label": "All ISO queues"}, {"url": "https://dchub.cloud/ai-answers/ercot-large-load-queue", "label": "How big is ERCOT's large load queue?"}, {"url": "https://dchub.cloud/ai-answers/ercot-batch-zero-status", "label": "What is the status of ERCOT Batch Zero?"}, {"url": "https://dchub.cloud/ai-answers/pjm-interconnection-queue-data-centers", "label": "How large is the PJM interconnection queue?"}], "mcp": "Get this live in your assistant: DC Hub MCP at https://dchub.cloud/mcp. Ask it with execute_plan(intent=\"How large is the SPP interconnection queue?\"). Add to ChatGPT · Claude · Cursor"}