{"ok": true, "slug": "ercot-queue-by-developer", "url": "https://dchub.cloud/ai-answers/ercot-queue-by-developer", "json_url": "https://dchub.cloud/ai-answers/ercot-queue-by-developer.json", "question": "Which developers have the most capacity in the ERCOT queue?", "answer": "In ERCOTQueue's October 2026 data, Black Mountain Energy Storage II has the most capacity in the ERCOT interconnection queue at about 10.4 GW, ahead of S&S Renewables, LLC at 6.0 GW and Anderson Energy Center, LLC at 3.8 GW. Capacity is requested MW for projects not yet commissioned, grouped by the developer name ERCOT lists. Figures as of Nov 5, 2026.", "as_of": "2026-11-05", "published": "2026-11-05", "refreshed": "2026-11-24", "rows": [{"label": "1. Black Mountain Energy Storage II", "value": "about 10.4 GW"}, {"label": "2. S&S Renewables, LLC", "value": "about 6.0 GW"}, {"label": "3. Anderson Energy Center, LLC", "value": "about 3.8 GW"}, {"label": "4. LCRA", "value": "about 3.3 GW"}, {"label": "5. Golden Spread Electric", "value": "about 3.0 GW"}, {"label": "6. Energy Forge One LLC", "value": "about 2.7 GW"}, {"label": "7. NextEra Energy Interconnection Holdings, LLC", "value": "about 2.7 GW"}, {"label": "8. RWE Clean Energy Development, LLC", "value": "about 2.6 GW"}, {"label": "9. Powering Knowledge, LLC", "value": "about 2.6 GW"}, {"label": "10. Hecate Energy LLC", "value": "about 2.6 GW"}], "source": "Source: ERCOT Generation Interconnection Status report, October 2026, via ERCOTQueue, published Nov 5, 2026. DC Hub refreshed Nov 24, 2026. ERCOT queue developer, milestones, funnel stage and build chance: Prusak, M. (2026). ercotqueue.com, independent ERCOT queue dashboard. https://www.ercotqueue.com. Licensed CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/). Underlying data: ERCOT Generation Interconnection Status report, October 2026. DC Hub joined these fields to its queue rows by INR and renamed some fields. Build chance is ERCOTQueue's model estimate, not an ERCOT figure. No endorsement by ERCOTQueue or ERCOT is implied.", "cite_as": "DC Hub (dchub.cloud), as of Nov 5, 2026", "cite_line": "Cite as: DC Hub (dchub.cloud), \"Which developers have the most capacity in the ERCOT queue?\", https://dchub.cloud/ai-answers/ercot-queue-by-developer, as of Nov 5, 2026.", "license": "https://creativecommons.org/licenses/by/4.0/", "creator": "DC Hub", "based_on": ["https://www.ercotqueue.com/data/projects.json"], "data_download": "https://dchub.cloud/api/v1/interconnection-queue/refined?iso=ERCOT", "related": [{"url": "https://dchub.cloud/grid/ercot", "label": "ERCOT grid"}, {"url": "https://dchub.cloud/grid/queue/ercot", "label": "ERCOT queue"}, {"url": "https://dchub.cloud/ai-answers/ercot-queue-completion-probability", "label": "ERCOT build chance"}, {"url": "https://dchub.cloud/ai-answers/ercot-large-load-queue", "label": "How big is ERCOT's large load queue?"}, {"url": "https://dchub.cloud/ai-answers/ercot-batch-zero-status", "label": "What is the status of ERCOT Batch Zero?"}, {"url": "https://dchub.cloud/ai-answers/pjm-interconnection-queue-data-centers", "label": "How large is the PJM interconnection queue?"}], "mcp": "Get this live in your assistant: DC Hub MCP at https://dchub.cloud/mcp. Ask it with execute_plan(intent=\"Which developers have the most capacity in the ERCOT queue?\"). Add to ChatGPT · Claude · Cursor"}