What is the Data Center Power Index verdict for Edison?

DC Hub's Data Center Power Index rates Edison AVOID for new data-center power, with a composite score of 22.8 out of 100, as of Nov 21, 2026. Edison is on the PJM grid.

MarketEdison
State or regionNJ
Grid operatorPJM
DCPI verdictAVOID
DCPI composite score22.8 of 100
Verdict and scores last changedNov 11, 2026
Bridgewater Township, NJ (PJM)AVOID
Clifton, NJ (PJM)AVOID
Jersey City, NJ (PJM)AVOID
Newark, NJ (PJM)AVOID
Piscataway, NJ (PJM)AVOID

Source: DC Hub Data Center Power Index (DCPI), published Nov 21, 2026. DC Hub refreshed Nov 22, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0.

Cite as: DC Hub (dchub.cloud), "What is the Data Center Power Index verdict for Edison?", https://dchub.cloud/ai-answers/dcpi-verdict-edison, as of Nov 21, 2026.

The figures and their dates

As of Nov 21, 2026, the figures on this page are: Market: Edison; State or region: NJ; Grid operator: PJM; DCPI verdict: AVOID; DCPI composite score: 22.8 of 100; Verdict and scores last changed: Nov 11, 2026; Bridgewater Township, NJ (PJM): AVOID; Clifton, NJ (PJM): AVOID; Jersey City, NJ (PJM): AVOID; Newark, NJ (PJM): AVOID; Piscataway, NJ (PJM): AVOID. Source: DC Hub Data Center Power Index (DCPI), published Nov 21, 2026. DC Hub refreshed Nov 22, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0. Each figure is read from the same functions the matching DC Hub market, grid and DCPI pages use.

How to read this answer

How to read it. The verdict is the Data Center Power Index (DCPI) for the market: BUILD, CAUTION or AVOID for new data-center power, recomputed daily from grid data and interconnection queues. The composite is a 0 to 100 buildability score; it can be compared with other DCPI scores, and it is not a capacity or a percentage. The other markets listed are ones DC Hub scores on the same grid operator, each with its own verdict. The date is the day the data on this page last changed. DC Hub publishes the method for the DCPI at /dcpi/methodology and the source, date and licence of every figure on the page itself, so an assistant or a person can cite it with its date.

Go deeper

For more on Edison, open the Edison market page, Edison DCPI breakdown, or any of the data centers tracked there:

Facility pages are taken in the order the market page lists them, each checked to load on Oct 17, 2026.