{"ok": true, "slug": "colocation-capacity-dallas-5-mw", "url": "https://dchub.cloud/ai-answers/colocation-capacity-dallas-5-mw", "json_url": "https://dchub.cloud/ai-answers/colocation-capacity-dallas-5-mw.json", "question": "Where can I find 5 MW of colocation capacity in Dallas, and how soon can it be powered?", "answer": "This page lists no Dallas colocation space and states no available MW. What DC Hub can verify live for Dallas on ERCOT: DC Hub's Data Center Power Index rates Dallas CAUTION for new data-center power, composite score 43.9 of 100, as of Nov 22, 2026; its modelled time to power for a new large load in Dallas is about 30 months (a model estimate, not a utility date), as of Nov 22, 2026; ERCOT's published interconnection queue headline is 461.4 GW, as of Oct 31, 2026. Capacity listings are in DC Hub Capacity Source, which needs a sign-in.", "as_of": "2026-11-22", "published": "2026-11-22", "refreshed": "2026-11-22", "rows": [{"label": "Market", "value": "Dallas"}, {"label": "Grid operator", "value": "ERCOT"}, {"label": "DCPI verdict", "value": "CAUTION, as of Nov 22, 2026. Source: DC Hub Data Center Power Index (DCPI)"}, {"label": "DCPI composite score", "value": "43.9 of 100, as of Nov 22, 2026. Source: DC Hub Data Center Power Index (DCPI)"}, {"label": "Modelled time to power, new large load", "value": "about 30 months, a model estimate and not a utility date, as of Nov 22, 2026. Source: DC Hub Data Center Power Index (DCPI)"}, {"label": "ERCOT interconnection queue headline", "value": "461.4 GW, as of Oct 31, 2026. Source: ERCOT large-load queue (Senate presentation Jul 29 2026; June 19 LLWG) + generation queue (Oct 31 2026)"}, {"label": "ERCOT refined queue data (get_refined_queue)", "value": "Source data as of Oct 31, 2026. Source: ERCOT, Generation Interconnection Status Report. This page prints no queue figure filtered to 5 MW."}, {"label": "ERCOT filed retirements (get_retirement_headroom)", "value": "As of the Aug 2026 EIA-860M filing, the earliest filed ERCOT retirement date in the public view is Mar 2027. Megawatts per unit are withheld from the public view. Source: U.S. Energy Information Administration, Form EIA-860M."}, {"label": "Dallas colocation listings on this page", "value": "None. Browse DC Hub Capacity Source at https://dchub.cloud/listings?src=ai-answers (sign-in required)."}], "source": "Sources, each dated in the table above: DC Hub DCPI; ERCOT large-load queue (Senate presentation Jul 29 2026; June 19 LLWG) + generation queue (Oct 31 2026); U.S. Energy Information Administration Form EIA-860M. Data: DC Hub (dchub.cloud), CC BY 4.0. No OpenStreetMap-derived layer is used on this page.", "cite_as": "DC Hub (dchub.cloud), as of Nov 22, 2026", "cite_line": "Cite as: DC Hub (dchub.cloud), \"Where can I find 5 MW of colocation capacity in Dallas, and how soon can it be powered?\", https://dchub.cloud/ai-answers/colocation-capacity-dallas-5-mw, as of Nov 22, 2026.", "license": "https://creativecommons.org/licenses/by/4.0/", "creator": "DC Hub", "based_on": ["https://dchub.cloud/dcpi/methodology", "https://dchub.cloud/api/v1/dcpi/verdicts", "https://www.ercot.com/files/docs/2026/06/18/June-19-LLWG-Report.pptx"], "data_download": "https://dchub.cloud/api/v1/dcpi/verdicts", "related": [{"url": "https://dchub.cloud/listings?src=ai-answers", "label": "DC Hub Capacity Source (sign-in required)"}, {"url": "https://dchub.cloud/dcpi/dallas", "label": "Dallas DCPI breakdown"}, {"url": "https://dchub.cloud/markets/dallas", "label": "Dallas market page"}, {"url": "https://dchub.cloud/grid/queue/ercot", "label": "ERCOT interconnection queue"}, {"url": "https://dchub.cloud/ai-answers/power-availability-dallas", "label": "How much power is available for a data center in Dallas?"}], "mcp": "Get this live in your assistant: DC Hub MCP at https://dchub.cloud/mcp. Ask it with execute_plan(intent=\"Where can I find 5 MW of colocation capacity in Dallas, and how soon can it be powered?\"). Add to ChatGPT · Claude · Cursor"}