IONIC Digital Cedarvale

IONIC Digital

IONIC Digital Cedarvale is a data center operated by IONIC Digital in West Texas, TX, US. The facility is currently operational. It sits in the West Texas data-center market on the ERCOT grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 56.3-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Status
Operational
Market
West Texas
State
TX
Country
US
Coordinates
31.5134, -103.4485

Market intelligence

CAUTION

Data Center Power Index verdict for West Texas — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on West Texas — the market this facility sits in (full deep-dive →).

West Texas operates at moderate utilization across 9 tracked facilities totaling 3,950 MW, with power availability 58/100 outpacing grid constraints 53/100 but neither metric signaling robust expansion room. The region hosts a fragmented operator base dominated by unknown entities 4 facilities alongside smaller pure-plays Lancium 2, CoreWeave 1, Galaxy 1, and IONIC Digital 1, indicating no single strategic anchor. Recent deal activity—Cardinal Data Power's $20M raise and multiple Microsoft/Google announcements—suggests hyperscaler interest, though transaction terms remain opaque, pointing to early-stage rather than mature capital deployment. The CAUTION verdict reflects genuine operational tension: excess power at 58/100 is flattering only relative to constraint at 53/100, leaving minimal headroom for new large-scale buildouts without grid upgrades. For buyers and operators, this means…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketWest Texas
Grid operatorERCOT
DC Hub Power IndexCAUTION
Est. time to power56.3 months
LocationWest Texas, US
Nearest substationwithin 1 km

Power generation nearby

DC Hub tracks 8 operating generating units totalling 1,004 MW within about 50 km of West Texas, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Utility-Scale Solar559 MW · 3 units · 56%
Oil/Gas445 MW · 5 units · 44%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in West Texas tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 21,500+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="ionic-digital-ionic-digital-cedarvale-54d359e9" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=ionic-digital-ionic-digital-cedarvale-54d359e9
Schema, units and the population behind every count: https://dchub.cloud/bind